DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
HPD12/07/2024§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT GROUND LEVEL LEADING TO BASEMENT AT BOILER ROOM, 1st STORY
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
HPD05/11/2022HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD08/04/2021§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
HPD05/22/2018§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL BATTENS AT 4TH STORY BALCONY AT 1st FIRE ESCAPE FROM EAST AT NORTH, SECTION AT WEST
DOB06/23/2017VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB07/06/2004V-DOB VIOLATION - ACTIVE
ECB07/21/201636,3A,3B,3C,51,B154. TELEDYNE LAARS MODER PW0250;INPUT 250,000 BTU/HQ GAP-FIRED BUILT 2005 36-REFERENCED BOILER WAS INSTALLED AND MADE OPERATIONAL W/O BEING REGISTERED ON THE DOB DATABASE. 3A,B,C INTEGRAL FLUENothing owed — awaiting certificate of correction
ECB06/18/201650A,50B,44C.FULTON Y.T.BOILER,10HP,NB62626,HP SIM,GAS FD1991 50A EVIDENCE OF ASH ACCUMULATION IN COMBUSTION CHAMBER BASE.REMOVE CLEAN-OUT COVER,(VACUUM)ASH &RE-SEAL;44C DEFECTIVE STEAM PRESSURE GAUGE.REPLACE;50Nothing owed — awaiting certificate of correction
ECB06/18/2016CU-3A,3B,3C,51.SLANT FIN C.I.LP HOT WATER HEATING BOILER,GAS.3A/C INTEGRAL FLUE PIPE RUN TO CHIMNEY W.SECTIONAL CORROSION &DISLOCATION.REPLACE CORRODED SECTIONS&INSTALL APPROVED STRUCTURAL SUPPORTS;3B FLUE GASNothing owed — awaiting certificate of correction
ECB06/18/2016CU-50A,50B,3A,51.FULTON Y.T. BOILER,10HP,NB62626,HP SIM;GAP FD;1991 50A MAJOR CORROSION &WASTAGE @UPPER&LOWER(HANDHOLE)PORT SLEEVES.REPLACE METAL SLEEVES FOR APPROVED REPAIR;3A CORRODED &UNSUPPORTED SECTION OFNothing owed — awaiting certificate of correction
ECB06/18/2016CU-3A,3B,3C,51. SCANT DIN C.2.LP H05 WATER HEATING BOILER,GAS.3A/C INTEGRAR FLUE PIPE RUN TO CHIMNEY W.SECTIONAL CORROSION &DISLOCATION.REPLACE CORRODED SECTIONS &INSTALL APPROVED STRUCTURAL SUPPORTS(HANDELS);3Nothing owed — awaiting certificate of correction
ECB04/05/200850A50B. FULTON V.T BOILER 10HP NB62626 GAS FIRED 1991. 50A SCALE ACCUMULATIONS AND CORROSION AT HANDHOLES DESCALE FOR COMPLIANCE. 50B DETERIORATION OF COMBUSTION CHAMBER SLEEVE AT LOWER HANDHOLES PERFORM REPAIRNothing owed — awaiting certificate of correction
ECB10/27/200450A/51/50B/B4B 50A-FLUE PIPE SYSTEM INCOMPLETE COMBINED FLUE PIPE FOR BOILER #1 HOT CONNECTED TO THE CHIMNEY BASE EMISSIONS FROM BOILERS ANDFIRED STORAGE WATER HEATERS DISCHARGE INTO BOILER ROOM CONFINED SPACENothing owed — awaiting certificate of correction