← Back
Primarily 1 family with 1 store or office
1128 BROADWAY
BROOKLYN · BIN 3043308
💬 Discuss this project
1916Year Built
2Stories
S1Building Class
C4-4LZoning
2,306 sfGross Floor Area
2Units
0 Open Violations
Primarily 1 family with 1 store or office · 2,145 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION & DEVELOPMENT503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YAN ENGINEERING PLLC210/24/2024
FL&M ENGINEERING DESIGN &INSPECTION109/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKY HEIGHTS CONSTRUCTIONGeneral Contractor303/21/2026
EAGLE PLATINUM INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN ENGINEERING PLLC7851210/24/2024
Building Lifecycle
All (25)Filed (3)Permit Issued (2)Signed Off (2)Violation (7)Inspection (1)Objection (8)Special Inspection (2)
11/29/2024
Signed off — Alteration
B01058059-I1
11/22/2024
Signed off — Alteration
FRONT FACADE REPAIR AS PER PLANS TO RECTIFY ECB VIOLATION #39115171H & DOB VIOLATION #V052324C24-01433. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01104926-I1
11/19/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
SHI YAN
10/30/2024
Special inspection requirement — Masonry
SHI YAN
10/24/2024
Filed — Alteration
FRONT FACADE REPAIR AS PER PLANS TO RECTIFY ECB VIOLATION #39115171H & DOB VIOLATION #V052324C24-01433. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01104926-P1
10/01/2024
Permit issued — General Construction
B01104926-I1-GC
09/18/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
09/16/2024
Objection raised — Energy
09/16/2024
Objection raised — Scope
09/16/2024
Objection raised — Scope
09/16/2024
Objection raised — Other
09/10/2024
Filed — Alteration
FRONT FACADE REPAIR AS PER PLANS TO RECTIFY ECB VIOLATION #39115171H & DOB VIOLATION #V052324C24-01433. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01104926-I1
09/09/2024
Filed — Alteration
B01058059-I1
09/09/2024
Permit issued — Sidewalk Shed
B01058059-I1-SH
05/24/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2024
Violation issued (ECB, closed)
Construction
05/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2003
Violation issued (ECB, closed)
Construction
12/23/1993
Violation issued (ECB, closed)
Construction
12/09/1993
Violation issued (ECB, closed)
Construction
12/09/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEAGLE PLATINUM INC10/01/2024
DOB NOWSidewalk ShedSigned-offSKY HEIGHTS CONSTRUCTION09/09/2024
2 projects · most recent 06/17/2026
FiledStatusContractorScope
06/17/2026On Hold - Returned CheckWCK ELECTRIC CORP.2 meters, 2 new_meters
05/30/2024CompleteAUJLA ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/19/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/30/2024Tenant Protection Plan ComplianceSHI YANspecial
10/30/2024MasonrySHI YANspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01058059-I1Request digital key ↗
08/23/2026B01104926-P1Request digital key ↗
08/14/2026B01104926-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B01058059-I1Open ↗
08/23/2026B01104926-I1Open ↗
08/23/2026B01104926-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01104926-I1Open ↗
08/26/2026B01104926-I1Open ↗