← Back
Three families
113 3 PLACE
BROOKLYN · BIN 3007952
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
2,400 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Three families · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof11p · 1 filing · 20 docs
Floor 135p · 1 filing · 20 docs
Sub-Basement31p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2024$2.9M—— → —$1,221/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EKEN DESIGN LLC506/12/2026
ONE HERMITAGE203/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION XPERT INCGeneral Contractor707/08/2026
BLU ELECTRICAL SVS INCElectrical103/22/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252706/12/2026
Building Lifecycle
All (134)Filed (7)Permit Issued (6)Signed Off (1)Violation (16)Inspection (7)Objection (67)Special Inspection (30)
07/29/2026
Objection resolved — Resolved
07/02/2026
Objection raised — Other
07/02/2026
Objection raised — Cost
07/02/2026
Objection raised — Other
07/02/2026
Objection raised — Other
07/02/2026
Objection raised — Fire_Protection
07/02/2026
Objection raised — Scope
06/12/2026
Filed — Alteration
Filing herewith for the Interior renovation of basement to include extension at rear yard .Renovation to include interior partitions and proposed structural reinforcement.
B01073089-P2
06/11/2026
Special inspection requirement — Final
NAVEEN KUMAR
06/11/2026
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
04/15/2026
Signed off — Alteration
Filing herewith for the Interior renovation of basement to include extension at rear yard .Renovation to include interior partitions and proposed structural reinforcement.
B01073089-I1
11/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2025
Violation issued (ECB, closed)
Unknown
09/12/2025
Violation issued (ECB, open)
Construction
09/12/2025
Violation issued (ECB, closed)
Construction
09/12/2025
Violation issued (ECB, closed)
Construction
09/12/2025
Violation issued (ECB, closed)
Construction
09/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/22/2025
Permit issued — Plumbing
B01073089-S1-PL
08/14/2025
Permit issued — Mechanical Systems
B01073089-S2-MS
08/08/2025
Permit issued — General Construction
B01073089-S3-GC
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Cost
07/22/2025
Objection raised — Scope
07/16/2025
Filed — Alteration
Filing herewith for the Interior renovation of basement to include extension at rear yard .Renovation to include interior partitions and proposed structural reinforcement.
B01073089-S2
07/16/2025
Filed — Alteration
Filing herewith for the Interior renovation of basement to include extension at rear yard .Renovation to include interior partitions and proposed structural reinforcement.
B01073089-S1
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
07/03/2025
Objection resolved — Addressed
06/27/2025
Permit issued — Structural
B01073089-S4-ST
06/27/2025
Permit issued — Foundation
B01073089-S5-FO
05/15/2025
Objection raised — Scope
05/09/2025
Objection resolved — Addressed
04/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
04/01/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
INDARDEO PARBHUNATH
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/13/2025
Objection resolved — Addressed
03/13/2025
Objection resolved — Addressed
03/13/2025
Objection resolved — Addressed
03/11/2025
Objection raised — Admin
03/11/2025
Objection raised — Structural
03/11/2025
Objection raised — Structural
03/11/2025
Objection raised — Structural
03/11/2025
Objection raised — Structural
03/11/2025
Objection raised — Admin
03/11/2025
Objection raised — Structural
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC08/22/2025
DOB NOWMechanical SystemsPermit IssuedCONSTRUCTION XPERT INC08/14/2025
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION XPERT INC08/08/2025
DOB NOWStructuralPermit IssuedCONSTRUCTION XPERT INC06/27/2025
DOB NOWFoundationPermit IssuedCONSTRUCTION XPERT INC06/27/2025
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION XPERT INC10/30/2024
1 project · most recent 06/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/12/2026Signed-offVILLAGE P & H NY INCGas, Storm, Water/Sanitary
2 projects · most recent 12/23/2025
General Wiring
FiledStatusContractorScope
12/23/2025CompleteBLU ELECTRICAL SVS INC4 meters, 1 new_meters
09/17/2025CompleteBLU ELECTRICAL SVS INCGeneral Wiring
1 project · most recent 06/12/2026
Steel Concrete
FiledStatusContractorScope
06/12/2026Signed-offVILLAGE P & H NY INCSteel, Concrete
1 project · most recent 06/12/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
06/12/2026Signed-offVILLAGE P & H NY INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/10/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/10/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/11/2026FinalNAVEEN KUMARprogress
06/11/2026Mechanical SystemsINDARDEO PARBHUNATHspecial
07/09/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
04/15/2025Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
03/26/2025Excavations - Sheeting, Shoring, and BracingINDARDEO PARBHUNATHspecial
03/04/2025Interior lighting powerINDARDEO PARBHUNATHenergy_progress
03/04/2025Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
03/04/2025Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
03/04/2025Fenestration areasINDARDEO PARBHUNATHenergy_progress
03/04/2025Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
03/04/2025Electric vehicle service equipment requirementsINDARDEO PARBHUNATHenergy_progress
03/04/2025Lighting controlsINDARDEO PARBHUNATHenergy_progress
03/04/2025Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
03/04/2025Protection of exposed foundation insulationINDARDEO PARBHUNATHenergy_progress
03/03/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
02/25/2025FinalNAVEEN KUMARprogress
02/24/2025Structural Steel - DetailsINDARDEO PARBHUNATHspecial
02/24/2025Structural Cold-Formed SteelINDARDEO PARBHUNATHspecial
02/24/2025Concrete - Cast-In-PlaceINDARDEO PARBHUNATHspecial
02/24/2025Structural Steel - High Strength BoltingINDARDEO PARBHUNATHspecial
02/24/2025Structural Steel - WeldingINDARDEO PARBHUNATHspecial
02/24/2025Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
02/24/2025FinalNAVEEN KUMARprogress
02/24/2025Footing and FoundationINDARDEO PARBHUNATHprogress
02/21/2025FinalNAVEEN KUMARprogress
Latest 25 of 30.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026B01073089-S5Request digital key ↗
08/24/2026B01073089-S4Request digital key ↗
08/24/2026B01073089-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01073089-S3Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature17
09/07/2026B01073089-P2Open ↗
08/31/2026B01073089-S5Open ↗
08/31/2026B01073089-S5Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/07/2026B01073089-P2Open ↗
08/31/2026B01073089-S5Open ↗
08/31/2026B01073089-S5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026B01073089-S1Open ↗
08/24/2026B01073089-P2Open ↗
08/24/2026B01073089-S5Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026B01073089-S5Open ↗
08/24/2026B01073089-S4Open ↗
08/24/2026B01073089-S3Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01073089-S5Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01073089-S5Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram2
08/13/2026B01073089-S5Open ↗
08/13/2026B01073089-S3Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01073089-S3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01073089-S3Open ↗