← Back
Office with commercial, 7-19 stories
113 7 AVENUE
MANHATTAN · Chelsea-Hudson Yards · BIN 1080576
💬 Discuss this project
1924Year Built
7Stories
O6Building Class
C6-3AZoning
42,380 sfGross Floor Area
2Units
LL97 Covered33 Open Violations 28 unresolved · 5 paperwork only ▸FISP: No Report Filed
Office with commercial, 7-19 stories · Owner of record: CHELSEA 115 LLC · 5,296 sf lot · 8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 2 docs
Floor 5Under Construction2p · 1 filing · 3 docs
Floor 4Under Construction1p · 1 filing · 3 docs
Floor 3Under Construction2p · 1 filing · 3 docs
Floor 2Under Construction1p · 1 filing · 3 docs
Floor 1Under Construction1p · 1 filing · 3 docs
CellarUnder Construction2p · 1 filing · 3 docs
Site & exterior12p · 3 filings · 6 docs
Filed — no permit issued236p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
17TH STREET REALTY HOLDINGS2303/21/2026
PLATINUM SERVICES NY1507/08/2026
PREEN903/21/2026
CORE SCAFFOLD SYSTEMS803/21/2026
17TH STREET HOLDINGS603/21/2026
AAC REALTY303/21/2026
CHELSEA 115 LLC103/22/2026
17TH STREET REALTY HO103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2023$21.5M—AREIT RE HOLDER LLC → CHELSEA 115 LLC$507/sf building
03/15/2022$7.0M—Private party → AREIT RE HOLDER LLC$165/sf building
12/18/2014$57.0M—Private party → 17TH STREET REALTY HOLDINGS LLC$1,345/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP101/27/2026
TOHFAZ UDDIN PE PC101/23/2026
RAYMOND CHAN ARCHITECT, PC.512/23/2025
TAN ENGINEERING PC202/13/2025
JUST CONSULTING ENGINEERING202/11/2025
ASHRAF CORP112/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAYMOND CHAN ARCHITECT1803/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor1107/08/2026
URBAN INDUSTRIAL GROUPGeneral Contractor308/12/2026
ALEXANDER MERZLYAKElectrical103/21/2026
MELVYN ZWEBNERElectrical103/21/2026
Building Lifecycle
All (142)Filed (12)Permit Issued (8)Facade (FISP) (10)Violation (60)Objection (22)Special Inspection (30)
08/11/2026
Permit issued — General Construction
M01290052-I1-GC
05/08/2026
Permit issued — General Construction
M01290052-I1-GC
02/11/2026
Objection raised — Other
01/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01351614-I1
01/27/2026
Permit issued — Construction Fence
M01351614-I1-FN
01/23/2026
Filed — Alteration
INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01348889-I1
01/23/2026
Permit issued — Protection and Mechanical Methods
M01348889-I1-PMM
01/23/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/23/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/23/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent filing for mechanical work in conjunction with ALT-CO # M00980151-I1.
M00980151-P1
12/08/2025
Permit issued — Sidewalk Shed
M00978527-I1-SH
12/03/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
10/10/2025
Objection raised — Other
09/22/2025
Permit issued — General Construction
M01290052-I1-GC
09/19/2025
Filed — Alteration
Removal of non-bearing interior partitions in existing commercial building with general construction in cellar, first floor through fifth floor. No change of use, egress or certificate of occupancy.
M01290052-I1
09/19/2025
Special inspection requirement — Final
Raymond Chan
09/17/2025
Violation issued (ECB, open)
Construction
05/22/2025
Objection resolved — Addressed
05/22/2025
Objection resolved — Addressed
04/08/2025
Violation issued (ECB, open)
Local Law
02/26/2025
Objection raised — Other
02/25/2025
Objection raised — Other
02/25/2025
Special inspection requirement — Final
02/25/2025
Special inspection requirement — Structural Steel - High Strength Bolting
02/25/2025
Special inspection requirement — Concrete - Cast-In-Place
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/25/2025
Special inspection requirement — Structural Steel - Welding
02/25/2025
Special inspection requirement — Structural Steel - Details
02/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent filing for mechanical work in conjunction with ALT-CO # M00980151-I1.
M00980151-S1
02/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Subsequent filing for mechanical work in conjunction with ALT-CO # M00980151-I1.
M00980151-S2
02/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
02/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
02/13/2025
Special inspection requirement — Maintenance information
02/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
02/12/2025
Special inspection requirement — Shutoff dampers
02/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
02/12/2025
Special inspection requirement — Ventilation and air distribution system
02/12/2025
Special inspection requirement — Duct leakage testing, insulation and design
02/11/2025
Filed — Alteration
Full demolition for roof, 7th and 6th floor, partial demolition from 1st to 6th floor of existing 7-story building in conjunction with proposed ALT-CO (New Building with Existing Elements to Remain) application # M00980151-I1.
M01067177-P1
02/07/2025
Violation issued (ECB, open)
Construction
02/04/2025
Special inspection requirement — Standpipe Systems
02/04/2025
Special inspection requirement — Sprinkler Systems
02/04/2025
Special inspection requirement — Mechanical Systems
02/04/2025
Special inspection requirement — Final
01/16/2025
Special inspection requirement — Final
01/16/2025
Special inspection requirement — Structural Steel - Welding
01/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
01/16/2025
Special inspection requirement — Structural Steel - Details
01/16/2025
Special inspection requirement — Concrete - Cast-In-Place
01/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/16/2024
Permit issued — Sidewalk Shed
M00978527-I1-SH
09/29/2024
Filed — Alteration
Full demolition for roof, 7th and 6th floor, partial demolition from 1st to 6th floor of existing 7-story building in conjunction with proposed ALT-CO (New Building with Existing Elements to Remain) application # M00980151-I1.
M01067177-I1
09/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2024
Objection raised — Other
08/19/2024
Objection raised — Admin
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedURBAN INDUSTRIAL GROUP08/11/2026
DOB NOWGeneral ConstructionPermit IssuedURBAN INDUSTRIAL GROUP05/08/2026
DOB NOWConstruction FencePermit IssuedPLATINUM SERVICES NY LLC01/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATINUM SERVICES NY LLC01/23/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC12/08/2025
DOB NOWGeneral ConstructionPermit IssuedURBAN INDUSTRIAL GROUP09/22/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC12/16/2024
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC12/20/2023
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.07/28/2023
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.07/17/2023
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.06/21/2023
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.07/13/2022
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.06/27/2022
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.07/13/2021
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.06/30/2021
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.10/22/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.07/15/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.07/02/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.06/03/2020
BISSPISSUEDADVANCED PLUMBING LLC05/26/2020
BISSDISSUEDADVANCED PLUMBING LLC02/19/2020
BIS—ISSUEDPALM CONTRACTING & DEVELO12/24/2019
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.10/28/2019
BISOTISSUEDPALM CONTRACTING & DEVELO09/23/2019
BISOTRE-ISSUEDPALM CONTRACTING & DEVELO09/23/2019
BISOTRE-ISSUEDPALM CONTRACTING & DEVELO09/23/2019
BISMHISSUEDPALM CONTRACTING & DEVELO09/23/2019
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.07/16/2019
BISPLISSUEDADVANCED PLBG LLC05/15/2019
BISSPISSUEDADVANCED PLUMBING LLC01/08/2019
BIS—RE-ISSUEDPALM CONTRACTING & DEVELO01/02/2019
BISOTISSUEDPALM CONSTRUCTION INC12/19/2018
BISOTISSUEDPALM CONSTRUCTION INC12/19/2018
BISSDISSUEDADVANCED PLUMBING LLC11/26/2018
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.08/01/2018
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.07/09/2018
BISOTISSUEDPALM CONSTRUCTION INC05/25/2018
BISOTISSUEDPALM CONSTRUCTION INC05/25/2018
BISOTISSUEDPALM CONSTRUCTION INC05/25/2018
BISMHISSUEDPALM CONSTRUCTION INC05/24/2018
+ 18 more permits on file
1 project · most recent 12/23/2025
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/23/2025——Generators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ephoca WALL MOUNTED PRO APK10R3L2 15,330 BTU · Heat Pump Outdoor ×376
Lg ARUN060GSS4 60,000 BTU · Vrf Outdoor ×16
ARUN072BSS5 69,000 BTU · Vrf Outdoor ×4
Ventilation
Systemair ERV-3200-RR-208-3-CORIGO 3,200 CFM · Erv ×4
Generators
Generac SG035 35 kW · Generator ×4
1 project · most recent 12/23/2025
Sprinkler System
FiledStatusContractorScope
12/23/2025——Sprinkler System
1 project · most recent 12/23/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/23/2025——Gas, Storm, Water/Sanitary
7 projects · most recent 12/26/2023
General Wiring Lighting
FiledStatusContractorScope
12/26/2023Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
01/31/2020CancelledEQUAL ELECTRICAL CONT INCGeneral Wiring
09/09/2019CancelledELECTRICAL DESIGN MNGT LLGeneral Wiring
03/29/2019CompleteV. VASS ELECTRIC CORP—
03/20/2019Permit IssuedR.C.M. ELECTRIC CORP.General Wiring, Lighting
03/15/2019Permit IssuedR.C.M. ELECTRIC CORP.—
02/05/2019Permit IssuedNEE ELECTRICAL, LLCGeneral Wiring
2 projects · most recent 12/23/2025
Concrete
FiledStatusContractorScope
12/23/2025——1 scope_items
02/11/2025——Concrete
1 project · most recent 08/09/2024
FiledStatusContractorScope
08/09/2024——74 panels, 20 kw, 2,006 roof_area_sqft
1 project · most recent 01/27/2026
Fence
FiledStatusContractorScope
01/27/2026Permit IssuedPLATINUM SERVICES NY LLCFence
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
09/19/2025FinalRaymond Chanprogress
02/25/2025Final—progress
02/25/2025Structural Steel - High Strength Bolting—special
02/25/2025Concrete - Cast-In-Place—special
02/25/2025Structural Stability – Alterations of existing buildings—special
02/25/2025Structural Steel - Welding—special
02/25/2025Structural Steel - Details—special
02/13/2025HVAC-R and service water heating system controls—energy_progress
02/13/2025HVAC-R and service water piping design and insulation—energy_progress
02/13/2025Maintenance information—energy_progress
02/13/2025HVAC-R and service water heating equipment—energy_progress
02/13/2025Fire-Resistant Penetrations and Joints—special
02/12/2025HVAC-R and service water heating equipment—energy_progress
02/12/2025Fire-Resistant Penetrations and Joints—special
02/12/2025HVAC-R and service water piping design and insulation—energy_progress
02/12/2025Shutoff dampers—energy_progress
02/12/2025HVAC-R and service water heating system controls—energy_progress
02/12/2025Ventilation and air distribution system—energy_progress
02/12/2025Duct leakage testing, insulation and design—energy_progress
02/04/2025Standpipe Systems—special
02/04/2025Sprinkler Systems—special
02/04/2025Mechanical Systems—special
02/04/2025Final—progress
01/16/2025Final—progress
01/16/2025Structural Steel - Welding—special
Latest 25 of 54.
▾Documents — 373 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026M00970949-I1Request digital key ↗
08/28/2026M00978527-I1Request digital key ↗
08/26/2026M01088662-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits80
▸BISWORK PERMIT APPLICATION49
07/28/2023140678871Open ↗
07/17/2023140860101Open ↗
07/10/2023140860101Open ↗
Showing 3 of 49 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION31
08/26/2024140874846Open ↗
02/15/2021123264993Open ↗
03/09/2020140673769Open ↗
Showing 3 of 31 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM3
03/07/2018122992253Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026M00980151-I1Open ↗
08/13/2026M00980151-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026M00980151-I1Open ↗
08/13/2026M00980151-P1Open ↗
▸Seals & Professional Certifications84
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
03/09/2020140673769Open ↗
03/06/2020140673769Open ↗
11/25/2019140874846Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
03/06/2020140673769Open ↗
10/25/2019140874846Open ↗
07/15/2019140860101Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026M00970949-I1Open ↗
08/28/2026M00978527-I1Open ↗
08/26/2026M01088662-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
03/09/2020140673769Open ↗
03/06/2020140673769Open ↗
10/20/2017123173163Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
10/25/2019140874846Open ↗
07/15/2019140860101Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
10/25/2019140874846Open ↗
07/15/2019140860101Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
03/09/2020140673769Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M01290052-I1Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/16/2019123194916Open ↗
12/04/2018123412244Open ↗
10/20/2017123173163Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
01/16/2019123194890Open ↗
01/16/2019123194916Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026M00980151-I1Open ↗
08/13/2026M00980151-P1Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection13
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
01/02/2019122992253Open ↗
01/02/2019122992253Open ↗
03/26/2018122992253Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes4
10/23/2017123173163Open ↗
10/20/2017123289235Open ↗
Showing 2 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
01/02/2019122992253Open ↗
Showing 1 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/02/2019122992253Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026M00980151-I1Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
12/14/2018123264993Open ↗
10/20/2017123173163Open ↗
10/19/2017123289235Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
05/02/2019123412244Open ↗
04/30/2019123194916Open ↗
01/08/2018122992994Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
01/02/2019122992253Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
04/30/2019123194890Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
04/25/2019123194890Open ↗
04/25/2019123194916Open ↗
01/16/2019123194890Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/25/2019140874846Open ↗
10/25/2019140874846Open ↗
07/15/2019140860101Open ↗
Showing 3 of 6 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS3
07/10/2024140874846Open ↗
07/10/2024140678871Open ↗
06/12/2024140860101Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
03/22/2019123412244Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/02/2019122992253Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/02/2019122992253Open ↗
▸Approvals, Objections & Sign-offs38
▸BISLETTERS - SUPPORTING DOCUMENTATION16
06/21/2023140673769Open ↗
06/21/2023140673769Open ↗
06/03/2020140673769Open ↗
Showing 3 of 16 on file for this type
▸BISSHED LETTER10
06/21/2023140673769Open ↗
06/21/2023140673769Open ↗
06/06/2022140673769Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/27/2024140874846Open ↗
07/11/2024140678871Open ↗
07/11/2024140673769Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
03/26/2018122992253Open ↗
Showing 1 of 2 on file for this type
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
12/28/2018123290205Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT17
01/16/2019123194890Open ↗
01/16/2019123194916Open ↗
12/04/2018123412244Open ↗
Showing 3 of 17 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/24/2019122992253Open ↗
01/02/2019122992253Open ↗
▸Filing & Intake Forms47
▸BISEFILING COVER SHEET16
01/16/2019123194890Open ↗
01/16/2019123194916Open ↗
12/04/2018123412244Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION13
03/09/2020140673769Open ↗
02/05/2020123290205Open ↗
12/12/2019123290205Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM13
07/28/2023140678871Open ↗
07/24/2023140678871Open ↗
07/17/2023140860101Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/25/2019140874846Open ↗
07/15/2019140860101Open ↗
Showing 2 of 5 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
06/06/2022140673769Open ↗
06/06/2022140673769Open ↗
06/06/2022140673769Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026M00980151-I1Open ↗
08/13/2026M00980151-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026M00980151-P1Open ↗
08/15/2026M00980151-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026M00980151-I1Open ↗
08/13/2026M00980151-P1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type