← Back
Over six families without stores
113 CLINTON AVENUE
BROOKLYN · BIN 3054315
💬 Discuss this project
1905Year Built
3Stories
C1Building Class
R6BZoning
9,272 sfGross Floor Area
8Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: CLINTON HOLDINGS 18 LLC · 3,600 sf lot · 2.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionLandscapeGeneral
Penthouse97p · 1 filing · 20 docs
Floor 495p · 1 filing · 20 docs
Floor 397p · 1 filing · 20 docs
Floor 294p · 1 filing · 20 docs
Floor 1
Cellar102p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED 24415907/08/2026
HPD307/08/2026
SAFELINE GROUP INC.903/22/2026
CLINTON HOLDINGS 18 LLC403/22/2026
VIOLET DOREEN 1FIL303/22/2026
ROSA LLC IVAN203/22/2026
OWNER OF PROPERTY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/05/2023$2.3M—Private party → CLINTON HOLDINGS 18 LLC$245/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.1803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IVAN ROSA LLCGeneral Contractor3007/08/2026
SAFELINE GROUP INCGeneral Contractor603/21/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
G.N. CONSTRUCTION INCGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161308/26/2024
Building Lifecycle
All (185)Filed (19)Permit Issued (19)Signed Off (10)Violation (60)Inspection (13)Objection (34)Special Inspection (30)
08/21/2025
Violation issued (ECB, closed)
Construction
05/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
02/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/04/2025
Special inspection requirement — Insulation placement and R values
02/04/2025
Special inspection requirement — Air barrier - visual inspection
02/04/2025
Special inspection requirement — Fenestration areas
02/04/2025
Special inspection requirement — Fenestration air leakage
01/28/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-A1
12/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2024
Violation issued (HPD, closed)
I
11/07/2024
Violation issued (ECB, closed)
Zoning
10/30/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Other
10/09/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-P7
10/09/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/09/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
10/09/2024
Special inspection requirement — Sprayed fire-resistant materials
FAHAD FATEH
10/09/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
10/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
10/09/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
10/09/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/09/2024
Special inspection requirement — Metering
FAHAD FATEH
10/09/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
10/09/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/09/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
10/09/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
10/09/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
10/09/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
10/09/2024
Special inspection requirement — Masonry
FAHAD FATEH
10/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/14/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-S1
09/10/2024
Objection raised — Other
09/10/2024
Objection resolved — Addressed
09/06/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-S2
09/05/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/05/2024
Special inspection requirement — Metering
FAHAD FATEH
09/05/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
09/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/04/2024
Objection raised — Other
09/04/2024
Objection resolved — Addressed
08/26/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-P6
08/22/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-P5
08/21/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/09/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-P4
08/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/06/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/02/2024
Signed off — Alteration
B01036935-I1
07/02/2024
Signed off — Alteration
B00986508-I1
07/01/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-S7
05/28/2024
Signed off — Alteration
B00812341-I1
05/21/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FOR THE ENLARGEMENT OF AN EXISTING THREE-STORY SRO BUILDING WITH TWO (2) DWELLING UNITS & EIGHT (8) SRO UNITS TO BE CONVERTED TO A FOUR (4) STORY BUILDING WITH PENTHOUSE WITH EIGHT (8) DWELLING UNITS.
B08022452-S4
05/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offSAFELINE GROUP INC04/23/2024
DOB NOWGeneral ConstructionPermit IssuedIVAN ROSA LLC01/31/2024
DOB NOWSidewalk ShedSigned-offSAFELINE GROUP INC01/08/2024
DOB NOWMechanical SystemsSigned-offIVAN ROSA LLC11/30/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/05/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/05/2023
DOB NOWSupport of ExcavationSigned-offIVAN ROSA LLC09/14/2023
DOB NOWStructuralSigned-offIVAN ROSA LLC09/14/2023
DOB NOWGeneral ConstructionPermit IssuedIVAN ROSA LLC09/14/2023
DOB NOWConstruction FenceSigned-offIVAN ROSA LLC09/14/2023
DOB NOWFoundationSigned-offIVAN ROSA LLC09/14/2023
DOB NOWFoundationSigned-offIVAN ROSA LLC09/14/2023
DOB NOWSupport of ExcavationSigned-offIVAN ROSA LLC07/26/2023
DOB NOWStructuralSigned-offIVAN ROSA LLC07/26/2023
DOB NOWFoundationSigned-offIVAN ROSA LLC07/26/2023
DOB NOWFoundationSigned-offIVAN ROSA LLC07/25/2023
DOB NOWGeneral ConstructionPermit IssuedIVAN ROSA LLC07/25/2023
DOB NOWConstruction FenceSigned-offIVAN ROSA LLC07/21/2023
DOB NOWSidewalk ShedSigned-offEMPIRE CONSTRUCTION ASSOC01/23/2023
1 project · most recent 01/28/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2025Permit IssuedIVAN ROSA LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin DAIKIN 3MXL24WMVJU9 24,000 BTU · Condensing Unit ×12
DAIKIN 4MXL36WVJU9 36,000 BTU · Heat Pump Outdoor ×4
3 projects · most recent 02/13/2024
General Wiring
FiledStatusContractorScope
02/13/2024CompleteRONEY ELECTRIC INCGeneral Wiring
01/08/2024CompleteRICHARD NEU—
08/26/2023CompleteRICHARD NEU—
1 project · most recent 01/28/2025
Concrete
FiledStatusContractorScope
01/28/2025Permit IssuedIVAN ROSA LLCConcrete
1 project · most recent 01/28/2025
Earthwork
FiledStatusContractorScope
01/28/2025Permit IssuedIVAN ROSA LLCEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/21/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
02/04/2025Structural Stability – Alterations of existing buildings—special
02/04/2025Air barrier - visual inspection—energy_progress
02/04/2025Fenestration areas—energy_progress
02/04/2025Fenestration and door U-factor and product ratings—energy_progress
02/04/2025Fenestration air leakage—energy_progress
02/04/2025Insulation placement and R values—energy_progress
10/09/2024Lighting controlsFAHAD FATEHenergy_progress
10/09/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
10/09/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
10/09/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/09/2024Sprayed fire-resistant materialsFAHAD FATEHspecial
10/09/2024MasonryFAHAD FATEHspecial
10/09/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/09/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
10/09/2024Maintenance informationFAHAD FATEHenergy_progress
10/09/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/09/2024MeteringFAHAD FATEHenergy_progress
10/09/2024Interior lighting powerFAHAD FATEHenergy_progress
10/09/2024Fenestration air leakageFAHAD FATEHenergy_progress
10/09/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/09/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
10/09/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
10/09/2024Exterior lighting powerFAHAD FATEHenergy_progress
10/09/2024Fenestration areasFAHAD FATEHenergy_progress
09/05/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
Latest 25 of 94.
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/27/2026B00812341-I1Request digital key ↗
08/26/2026B00986508-I1Request digital key ↗
08/25/2026B01036935-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/28/2024340885331Open ↗
04/19/2023340885331Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/19/2023340885331Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)5
08/23/2026B08022452-P7Open ↗
08/23/2026B08022452-P5Open ↗
08/23/2026B08022452-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08022452-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026B00812341-I1Open ↗
08/26/2026B00986508-I1Open ↗
08/25/2026B01036935-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/26/2026B08022452-S1Open ↗
09/18/2026B08022452-P3Open ↗
09/02/2026B08022452-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/26/2026B08022452-S1Open ↗
09/02/2026B08022452-I1Open ↗
09/02/2026B08022452-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/19/2023340885331Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/19/2023340885331Open ↗
▸Safety & Tenant Protection25
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist19
08/23/2026B08022452-P7Open ↗
08/23/2026B08022452-P5Open ↗
08/23/2026B08022452-P4Open ↗
Showing 3 of 19 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
04/19/2023340885331Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/22/2024340885331Open ↗
▸BISSTREET TREE CHECKLIST1
04/19/2023340885331Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08022452-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08022452-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08022452-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/23/2026B08022452-S8Open ↗
08/23/2026B08022452-P7Open ↗
08/23/2026B08022452-P5Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
09/30/2024340885331Open ↗
02/14/2024340885331Open ↗
01/22/2024340885331Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/19/2023340885331Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/19/2023340885331Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial5
08/23/2026B08022452-P7Open ↗
08/23/2026B08022452-P5Open ↗
08/23/2026B08022452-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/23/2026B08022452-P7Open ↗
08/23/2026B08022452-P5Open ↗
08/23/2026B08022452-P4Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
10/08/2024340885331Open ↗
04/19/2023340885331Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B08022452-S3Open ↗
08/13/2026B08022452-S5Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
02/14/2024340885331Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/14/2024340885331Open ↗
▸BISBPP: NOTES REQUIRED ON PLAN1
02/14/2024340885331Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08022452-I1Open ↗