← Back
Condo, residential unit in 2-10 unit building
113 COLUMBIA HEIGHTS
BROOKLYN · Brooklyn Heights · BIN 3001653
💬 Discuss this project
1837Year Built
4Stories
R1Building Class
R6Zoning
7,391 sfGross Floor Area
5Units
Rent Stabilized0 Open Violations
Condo, residential unit in 2-10 unit building · Owner of record: 113 COLUMBIA HEIGHTS CONDOMINIUM LLC · 2,567 sf lot · 2.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof21p · 2 filings · 20 docs
Floor 458p · 5 filings · 20 docs
Floor 357p · 5 filings · 20 docs
Floor 259p · 5 filings · 20 docs
Floor 113p · 5 filings · 20 docs
Cellar63p · 5 filings · 20 docs
Sub-Basement55p · 5 filings · 20 docs
Site & exterior23p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
113 COLUMBIA HEIGHTS CONDOMINIUM303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.1408/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY2803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS CONSTRUCTION NYCGeneral Contractor903/21/2026
H&Z BUILDING CONSULTING IGeneral Contractor307/08/2026
SUNLIGHT CONSTRUCTION AAGeneral Contractor307/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56131408/08/2022
Building Lifecycle
All (99)Filed (14)Permit Issued (10)Signed Off (5)Violation (29)Inspection (9)Objection (2)Special Inspection (30)
05/04/2026
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
A
11/25/2024
Violation issued (HPD, closed)
I
04/09/2024
Violation issued (HPD, closed)
A
11/17/2023
Violation issued (HPD, closed)
I
03/22/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
09/29/2022
Signed off — Alteration
PROPOSED RELOCATED EXISTING SPRINKLER SYSTEM & HEADS ON CELLAR, BASEMENT, 1ST TO 4TH FLOOR. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. GENERAL CONSTRUCTION IN CONJUNCTION DOB NOW JOB#B00548737.
B00635628-I1
09/28/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/23/2022
Signed off — Alteration
INTERIOR RENOVATION FOR 5 APARTMENTS ON CELLAR, BASEMENT, 1ST, 2ND,3RD,4TH FLOOR AND ROOF. REPAIR FLOOR, CEILING & PARTITION WALL. AS PER PLAN. NO WORK ON STAIR BULKHEAD & ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00548737-I1
09/21/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/19/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/12/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/07/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/02/2022
Signed off — Alteration
PROPOSED MECHANICAL WORK ON OPEN SPACE, CEL, BSMT, 1ST TO 4th FLOOR. AS PER PLAN. GENERAL CONSTRUCTION IN CONJUNCTION DOB GC JOB NO:B00548737.
B00558624-I1
08/31/2022
Objection resolved — Addressed
08/29/2022
Violation issued (ECB, closed)
Construction
08/22/2022
Signed off — Alteration
PROPOSED PLUMBING WORK ON OPEN SPACE, CELLAR, BASEMENT, 1ST TO 4TH FLOOR. AS PER PLAN. IN CONJUNCTION DOB NOW ALTERATION TYPE 2 JOB NO: B00548737. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00557009-I1
08/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
08/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
08/09/2022
Special inspection requirement — Maintenance information
Fran Huang
08/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
08/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/09/2022
Special inspection requirement — Final
Fran Huang
08/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/09/2022
Special inspection requirement — Mechanical Systems
Fran Huang
08/09/2022
Special inspection requirement — Sprinkler Systems
Fran Huang
08/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
08/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
08/09/2022
Special inspection requirement — Heating Systems
Fran Huang
08/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
08/09/2022
Special inspection requirement — Duct leakage testing, insulation and design
Fran Huang
08/08/2022
Filed — Alteration
PROPOSED RELOCATED EXISTING SPRINKLER SYSTEM & HEADS ON CELLAR, BASEMENT, 1ST TO 4TH FLOOR. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. GENERAL CONSTRUCTION IN CONJUNCTION DOB NOW JOB#B00548737.
B00635628-P1
08/08/2022
Filed — Alteration
PROPOSED MECHANICAL WORK ON OPEN SPACE, CEL, BSMT, 1ST TO 4th FLOOR. AS PER PLAN. GENERAL CONSTRUCTION IN CONJUNCTION DOB GC JOB NO:B00548737.
B00558624-P2
08/08/2022
Filed — Alteration
PROPOSED PLUMBING WORK ON OPEN SPACE, CELLAR, BASEMENT, 1ST TO 4TH FLOOR. AS PER PLAN. IN CONJUNCTION DOB NOW ALTERATION TYPE 2 JOB NO: B00548737. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00557009-P4
08/08/2022
Special inspection requirement — Mechanical Systems
Fran Huang
08/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
08/08/2022
Special inspection requirement — Maintenance information
Fran Huang
08/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
08/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/08/2022
Special inspection requirement — Duct leakage testing, insulation and design
Fran Huang
08/08/2022
Special inspection requirement — Final
Fran Huang
08/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
08/08/2022
Special inspection requirement — Heating Systems
Fran Huang
08/01/2022
Objection raised — Other
07/21/2022
Filed — Alteration
INTERIOR RENOVATION FOR 5 APARTMENTS ON CELLAR, BASEMENT, 1ST, 2ND,3RD,4TH FLOOR AND ROOF. REPAIR FLOOR, CEILING & PARTITION WALL. AS PER PLAN. NO WORK ON STAIR BULKHEAD & ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00548737-P2
07/21/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
07/21/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
07/21/2022
Special inspection requirement — Fenestration areas
Fran Huang
07/20/2022
Filed — Alteration
PROPOSED MECHANICAL WORK ON OPEN SPACE, CEL, BSMT, 1ST TO 4th FLOOR. AS PER PLAN. GENERAL CONSTRUCTION IN CONJUNCTION DOB GC JOB NO:B00548737.
B00558624-P1
07/11/2022
Violation issued (ECB, closed)
Construction
07/08/2022
Signed off — Alteration
PROPOSED STRUCTURE WORK IN CONJUNCTION WITH GC APPLICATION #B00548737. NO CHANGE TO EGRESS AND OCCUPANCY.
B00558500-I1
07/06/2022
Filed — Alteration
PROPOSED STRUCTURE WORK IN CONJUNCTION WITH GC APPLICATION #B00548737. NO CHANGE TO EGRESS AND OCCUPANCY.
B00558500-P2
06/27/2022
Violation issued (ECB, closed)
Construction
04/22/2022
Permit issued — Mechanical Systems
B00558624-I1-MS
04/22/2022
Permit issued — General Construction
B00548737-I1-GC
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBUILDERS CONSTRUCTION NYC04/22/2022
DOB NOWGeneral ConstructionSigned-offBUILDERS CONSTRUCTION NYC04/22/2022
DOB NOWStructuralSigned-offBUILDERS CONSTRUCTION NYC04/22/2022
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.01/21/2022
DOB NOWGeneral ConstructionSigned-offH&Z BUILDING CONSULTING I01/04/2022
DOB NOWStructuralSigned-offH&Z BUILDING CONSULTING I09/23/2021
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG09/21/2021
DOB NOWMechanical SystemsSigned-offH&Z BUILDING CONSULTING I09/17/2021
DOB NOWGeneral ConstructionSigned-offSUNLIGHT CONSTRUCTION AA08/17/2021
DOB NOWGeneral ConstructionSigned-offSUNLIGHT CONSTRUCTION AA07/22/2021
BISOTISSUEDMAINTENANCE & REPAIR LLC07/10/2012
1 project · most recent 12/09/2021
General Wiring
FiledStatusContractorScope
12/09/2021CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/21/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/19/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/07/2022Fail-Final General Construction Non-Directive 14FailView ↗
01/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/01/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
08/09/2022Fire-Resistant Penetrations and JointsFran Huangspecial
08/09/2022Sprinkler SystemsFran Huangspecial
08/09/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
08/09/2022Energy Code Compliance InspectionsFran Huangprogress
08/09/2022Fire-Resistant Penetrations and JointsFran Huangspecial
08/09/2022Fire-Resistant Penetrations and JointsFran Huangspecial
08/09/2022Heating SystemsFran Huangspecial
08/09/2022Mechanical SystemsFran Huangspecial
08/09/2022FinalFran Huangprogress
08/09/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
08/09/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
08/09/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
08/09/2022Duct leakage testing, insulation and designFran Huangenergy_progress
08/09/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
08/09/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
08/09/2022Maintenance informationFran Huangenergy_progress
08/09/2022Energy Code Compliance InspectionsFran Huangprogress
08/08/2022FinalFran Huangprogress
08/08/2022Maintenance informationFran Huangenergy_progress
08/08/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
08/08/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
08/08/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
08/08/2022Fire-Resistant Penetrations and JointsFran Huangspecial
08/08/2022Heating SystemsFran Huangspecial
08/08/2022Mechanical SystemsFran Huangspecial
Latest 25 of 73.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/01/2026B00548737-P1Request digital key ↗
09/01/2026B00548737-I1Request digital key ↗
09/01/2026B00557009-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit12
08/13/2026B00558624-P1Open ↗
08/13/2026B00558624-P2Open ↗
08/13/2026B00548737-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
05/05/2022322106145Open ↗
04/11/2022322106145Open ↗
08/30/2021320321424Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
07/11/2012320321424Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/05/2022322106145Open ↗
▸Seals & Professional Certifications87
▸DOB NOWProgress Inspector Seal & Signature39
09/01/2026B00558500-P1Open ↗
09/01/2026B00558500-P1Open ↗
08/28/2026B00548737-P1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/01/2026B00558500-P1Open ↗
09/01/2026B00558500-P1Open ↗
09/01/2026B00558500-P1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00548737-I1Open ↗
09/01/2026B00548737-P2Open ↗
09/01/2026B00548737-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/15/2011320321424Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/01/2026B00548737-I1Open ↗
09/01/2026B00548737-P1Open ↗
08/28/2026B00635628-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/15/2011320321424Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00548737-I1Open ↗
08/13/2026B00558624-I1Open ↗
08/13/2026B00557009-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/24/2021320321424Open ↗
09/24/2021320321424Open ↗
▸BISTECHNICAL REPORT: ENERGY1
06/15/2011320321424Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/24/2021320321424Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/24/2021320321424Open ↗
09/24/2021320321424Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/09/2022322106145Open ↗
05/09/2022322106145Open ↗
05/05/2022322106145Open ↗
▸BISLANDMARKS APPROVAL1
01/06/2012320321424Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/15/2011320321424Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/24/2021320321424Open ↗
▸BISLANDMARKS SIGNOFF1
09/24/2021320321424Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
06/15/2011320321424Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/24/2021320321424Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
04/11/2022322106145Open ↗
06/15/2011320321424Open ↗
▸Other Documents2
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/05/2022322106145Open ↗
▸BISPLOT DIAGRAM1
05/09/2022322106145Open ↗