Walk-up apt, over six families with stores
113 DIVISION STREET
MANHATTAN · BIN 1003611
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
C6-2Zoning
8,034 sfGross Floor Area
10Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: YAN PING ASSOCIATION, INC. · 1,632 sf lot · 4.92 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Cellar27p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YAN PING ASSOCIATION1403/22/2026
YAN PING ASSOCIATES INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS C. TUNG, P.E.301/21/2025
DAGHER ENGINEERING PLLC201/21/2025
RHG ARCHITECTURE + DESIGN111/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RHG ARCHITECTURE + DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARK DESIGN & BUILD INCGeneral Contractor107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAGHER ENGINEERING2441101/21/2025
IP CONCRETE TESTING AND I6252112/18/2023
SIMON7555112/18/2023
Building Lifecycle
All (115)Filed (6)Permit Issued (2)Violation (30)Inspection (4)Objection (45)Special Inspection (28)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, open)
A
02/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
SIMON JIANG
02/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Josephine Zurica
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Josephine Zurica
02/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Josephine Zurica
02/03/2025
Objection raised — Other
02/03/2025
Objection raised — Other
02/03/2025
Objection raised — Other
01/21/2025
Filed — Alteration CO
Convert cellar Business and Storage Occupancy (UG6) to Bar Occupancy (UG6) - with less than 49 occupants. Install new fire-rated demising walls and ceiling, update existing toilet room, HVAC systems, bar counter and associated plumbing.
M00952743-P4
01/21/2025
Filed — Alteration CO
Convert cellar Business and Storage Occupancy (UG6) to Bar Occupancy (UG6) - with less than 49 occupants. Install new fire-rated demising walls and ceiling, update existing toilet room, HVAC systems, bar counter and associated plumbing.
M00952743-P3
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Josephine Zurica
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Josephine Zurica
12/20/2024
Special inspection requirement — Mechanical Systems
Josephine Zurica
12/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/20/2024
Special inspection requirement — Final
Josephine Zurica
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Josephine Zurica
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Josephine Zurica
12/20/2024
Special inspection requirement — Maintenance information
Josephine Zurica
12/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/11/2024
Special inspection requirement — Fenestration areas
RACHAEL GROCHOWSKI
12/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
RACHAEL GROCHOWSKI
12/11/2024
Special inspection requirement — Interior lighting power
RACHAEL GROCHOWSKI
12/11/2024
Special inspection requirement — Fenestration air leakage
RACHAEL GROCHOWSKI
12/11/2024
Special inspection requirement — Exterior lighting power
RACHAEL GROCHOWSKI
12/11/2024
Special inspection requirement — Air barrier - visual inspection
RACHAEL GROCHOWSKI
12/11/2024
Special inspection requirement — Lighting controls
RACHAEL GROCHOWSKI
12/02/2024
Objection resolved — Addressed
11/22/2024
Violation issued (HPD, open)
I
11/21/2024
Objection resolved — Addressed
11/12/2024
Objection raised — Other
11/12/2024
Objection raised — Other
11/06/2024
Filed — Alteration CO
Convert cellar Business and Storage Occupancy (UG6) to Bar Occupancy (UG6) - with less than 49 occupants. Install new fire-rated demising walls and ceiling, update existing toilet room, HVAC systems, bar counter and associated plumbing.
M00952743-P2
10/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/29/2024
Special inspection requirement — Exterior lighting power
RACHAEL GROCHOWSKI
10/29/2024
Special inspection requirement — Lighting controls
RACHAEL GROCHOWSKI
10/29/2024
Special inspection requirement — Interior lighting power
RACHAEL GROCHOWSKI
10/29/2024
Special inspection requirement — Fenestration air leakage
RACHAEL GROCHOWSKI
10/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
RACHAEL GROCHOWSKI
10/29/2024
Special inspection requirement — Air barrier - visual inspection
RACHAEL GROCHOWSKI
10/29/2024
Special inspection requirement — Fenestration areas
RACHAEL GROCHOWSKI
05/29/2024
Permit issued — Plumbing
M00952743-S4-PL
05/17/2024
Permit issued — General Construction
M00952743-I1-GC
04/01/2024
Violation issued (HPD, open)
A
03/14/2024
Objection raised — Other
03/14/2024
Objection resolved — Addressed
03/14/2024
Objection resolved — Addressed
03/14/2024
Objection resolved — Addressed
03/14/2024
Objection resolved — Addressed
01/11/2024
Objection raised — Other
01/11/2024
Objection resolved — Addressed
01/11/2024
Objection raised — Other
01/05/2024
Objection resolved — Addressed
01/05/2024
Objection resolved — Addressed
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG05/29/2024
DOB NOWGeneral ConstructionPermit IssuedARK DESIGN & BUILD INC05/17/2024
BISOTISSUEDHIGH QUALITY CONSTRUCTION03/09/2018
BIS—ISSUEDHIGH QUALITY CONSTRUCTION06/15/2017
BISPLISSUEDTOP PLUMBING GROUP,INC06/15/2017
BISOTISSUEDDREAM HOMES CONTRACTING INC.06/20/2008
1 project · most recent 01/21/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/21/2025Permit IssuedARK DESIGN & BUILD INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PFFY-R24NRMU-E 27,000 CFM · Vrf Indoor ×2
MXZ-SM60NAM-U1 66,000 BTU · Heat Pump Outdoor ×1
PKFY-P24NKMU-E2.TH 27,000 BTU · Vrf Indoor ×1
1 project · most recent 01/21/2025
Water/Sanitary
FiledStatusContractorScope
01/21/2025Permit IssuedCROSSFIELD PLBG.&HTGWater/Sanitary
1 project · most recent 11/30/2025
General Wiring
FiledStatusContractorScope
11/30/2025CompleteCL ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
02/04/2025Tenant Protection Plan ComplianceSIMON JIANGspecial
02/04/2025HVAC-R and service water piping design and insulationJosephine Zuricaenergy_progress
02/04/2025HVAC-R and service water heating equipmentJosephine Zuricaenergy_progress
02/04/2025HVAC-R and service water heating system controlsJosephine Zuricaenergy_progress
12/20/2024HVAC-R and service water heating equipmentJosephine Zuricaenergy_progress
12/20/2024Fire-Resistant Penetrations and JointsJosephine Zuricaspecial
12/20/2024Mechanical SystemsJosephine Zuricaspecial
12/20/2024Tenant Protection Plan Compliance—special
12/20/2024FinalJosephine Zuricaprogress
12/20/2024HVAC-R and service water heating system controlsJosephine Zuricaenergy_progress
12/20/2024HVAC-R and service water piping design and insulationJosephine Zuricaenergy_progress
12/20/2024Maintenance informationJosephine Zuricaenergy_progress
12/11/2024Tenant Protection Plan Compliance—special
12/11/2024Fenestration areasRACHAEL GROCHOWSKIenergy_progress
12/11/2024Fenestration and door U-factor and product ratingsRACHAEL GROCHOWSKIenergy_progress
12/11/2024Interior lighting powerRACHAEL GROCHOWSKIenergy_progress
12/11/2024Fenestration air leakageRACHAEL GROCHOWSKIenergy_progress
12/11/2024Exterior lighting powerRACHAEL GROCHOWSKIenergy_progress
12/11/2024Air barrier - visual inspectionRACHAEL GROCHOWSKIenergy_progress
12/11/2024Lighting controlsRACHAEL GROCHOWSKIenergy_progress
10/29/2024Tenant Protection Plan Compliance—special
10/29/2024Exterior lighting powerRACHAEL GROCHOWSKIenergy_progress
10/29/2024Lighting controlsRACHAEL GROCHOWSKIenergy_progress
10/29/2024Interior lighting powerRACHAEL GROCHOWSKIenergy_progress
10/29/2024Fenestration air leakageRACHAEL GROCHOWSKIenergy_progress
Latest 25 of 28.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026M00952743-P3Request digital key ↗
08/25/2026M00952743-P4Request digital key ↗
08/15/2026M00952743-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION13
02/13/2019122558044Open ↗
12/05/2018122558044Open ↗
11/21/2018122558044Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION4
03/12/2018123131306Open ↗
06/26/2017122558044Open ↗
06/26/2017122558044Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/27/2017122558044Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
02/04/2019122558044Open ↗
11/07/2018122558044Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature16
09/03/2026M00952743-P2Open ↗
09/03/2026M00952743-P2Open ↗
09/03/2026M00952743-P2Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
07/23/2018123131306Open ↗
05/25/2018122558044Open ↗
03/13/2018123131306Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026M00952743-P2Open ↗
08/25/2026M00952743-P4Open ↗
08/25/2026M00952743-P3Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/13/2018123131306Open ↗
06/17/2008110205331Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/13/2018123131306Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/17/2008110205331Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M00952743-S4Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
01/28/2011120580861Open ↗
12/28/2010120562523Open ↗
01/26/2009110441353Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/21/2017122558044Open ↗
10/26/2015122558044Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
02/04/2019122558044Open ↗
03/14/2011120580861Open ↗
▸BISTenant Protection Plan and Notes1
03/13/2018123131306Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026M00952743-P4Open ↗
08/25/2026M00952743-P3Open ↗
08/15/2026M00952743-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/13/2018123131306Open ↗
10/26/2015120580861Open ↗
10/26/2015110205331Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/28/2010120562523Open ↗
01/26/2009110441353Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/23/2018123131306Open ↗
03/13/2018123131306Open ↗
12/28/2017122558044Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/23/2018123131306Open ↗
05/25/2018122558044Open ↗
12/28/2017122558044Open ↗
▸Inspections & Test Reports4
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION3
02/04/2019122558044Open ↗
11/07/2018122558044Open ↗
07/23/2018123131306Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/25/2018122558044Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/15/2019122558044Open ↗
02/26/2019122558044Open ↗
02/04/2019122558044Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/13/2019122558044Open ↗
12/05/2018122558044Open ↗
11/21/2018122558044Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
01/28/2011120580861Open ↗
12/28/2010120562523Open ↗
01/26/2009110441353Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/26/2015122558044Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
07/23/2018123131306Open ↗
05/25/2018122558044Open ↗
03/13/2018123131306Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms23
▸BISBOROUGH INTAKE FORM16
03/15/2019122558044Open ↗
02/26/2019122558044Open ↗
02/13/2019122558044Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET6
03/12/2018123131306Open ↗
10/26/2015122558044Open ↗
01/28/2011120580861Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION1
08/21/2017122558044Open ↗
▸Other Documents4
▸BISPlot Diagram2
01/26/2009110441353Open ↗
01/18/2019122558044Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026M00952743-I1Open ↗
08/15/2026M00952743-P2Open ↗