Elevator apt, semi-fireproof with stores
113 EAST 31 STREET
MANHATTAN · Murray Hill-Kips Bay · BIN 1018460
💬 Discuss this project
1920Year Built
5Stories
D7Building Class
C4-5AZoning
13,750 sfGross Floor Area
19Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: ROLLING REALTY, · 3,358 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 2 filings · 16 docs
Floor 26p · 3 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW AMERICAN CONSTRUCTION INC1307/08/2026
ROLLING REALTY703/22/2026
OWNER OF PREMISES 113 E 3103/22/2026
CLEARWATER PROPERTIES903/21/2026
CLEARWATER203/21/2026
31 STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
SNR EXPEDITING DESIGN803/21/2026
HS DESIGN STUDIO403/21/2026
AE DESIGN SOLUTION203/21/2026
JUST ARCHITECTURE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADE CONSTRUCTION GROUP INGeneral Contractor407/08/2026
DOLMEN DEVELOPERS, INCGeneral Contractor407/08/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor407/08/2026
RICHARD NEUElectrical103/22/2026
IMPACT PLUMBING INCPlumbing107/08/2026
RICHARD NEUElectrical103/21/2026
VINCENT BUONOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL ENGINEERING INSPECTIO6912206/12/2025
INTEGRITY CONSULTING SERV666506/14/2023
Building Lifecycle
All (104)Filed (15)Permit Issued (8)Signed Off (8)Violation (40)Inspection (3)Special Inspection (30)
11/21/2025
Violation issued (HPD, closed)
C
07/29/2025
Signed off — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01125368-I1
06/25/2025
Signed off — Alteration
M01135755-I1
06/20/2025
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
06/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
06/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
06/20/2025
Special inspection requirement — Masonry
JOSHUA LUCKRITZ
06/20/2025
Special inspection requirement — Final
Levon Shaginyan
06/12/2025
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01125368-P1
06/12/2025
Special inspection requirement — Final
Levon Shaginyan
06/12/2025
Special inspection requirement — Masonry
JOSHUA LUCKRITZ
06/12/2025
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
06/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
06/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/06/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01113356-I1
05/14/2025
Signed off — Alteration
M01133104-I1
05/14/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01133105-I1
04/24/2025
Violation issued (HPD, closed)
B
04/24/2025
Violation issued (HPD, closed)
C
03/11/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01133105-P2
12/03/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01133105-P1
12/02/2024
Permit issued — Suspended Scaffold
M01113356-I1-SC
11/29/2024
Permit issued — General Construction
M01125368-I1-GC
11/18/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01113356-P1
11/07/2024
Filed — Alteration
M01135755-I1
11/07/2024
Permit issued — Protection and Mechanical Methods
M01135755-I1-PMM
11/07/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
10/30/2024
Permit issued — Sidewalk Shed
M01133104-I1-SH
10/30/2024
Permit issued — Supported Scaffold
M01133105-I1-SF
10/29/2024
Filed — Alteration
M01133104-I1
10/29/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01133105-I1
10/16/2024
Filed — Alteration
GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01125368-I1
10/09/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01113356-I1
11/16/2023
Signed off — Alteration
Install kitchen and toilet exhaust vents at apt #2B at 2nd floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
M00862128-I1
11/13/2023
Signed off — Alteration
Renovate apt #2B at 2nd floor for General Construction work indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
M00859505-I1
11/13/2023
Signed off — Alteration
plumbing work at 2nd floor apt #2B indicated on drawings filed herewith. No change to Use Egress or Occupancy under this application
M00859511-I1
10/12/2023
Permit issued — Mechanical Systems
M00862128-I1-MS
08/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2023
Special inspection requirement — Final
ALEKSANDR LEVIN
06/23/2023
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
06/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
06/23/2023
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
06/23/2023
Special inspection requirement — Shutoff dampers
ALEKSANDR LEVIN
06/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
06/14/2023
Filed — Alteration
plumbing work at 2nd floor apt #2B indicated on drawings filed herewith. No change to Use Egress or Occupancy under this application
M00859511-P1
06/14/2023
Filed — Alteration
Install kitchen and toilet exhaust vents at apt #2B at 2nd floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
M00862128-P1
06/14/2023
Filed — Alteration
Renovate apt #2B at 2nd floor for General Construction work indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
M00859505-P1
06/14/2023
Special inspection requirement — Final
ALEKSANDR LEVIN
06/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
06/14/2023
Special inspection requirement — Shutoff dampers
ALEKSANDR LEVIN
06/14/2023
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
06/14/2023
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
06/14/2023
Special inspection requirement — Final
ALEKSANDR LEVIN
06/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
06/14/2023
Special inspection requirement — Metering
ALEKSANDR LEVIN
06/14/2023
Special inspection requirement — Lighting in dwelling units
ALEKSANDR LEVIN
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDOLMEN DEVELOPERS, INC12/02/2024
DOB NOWGeneral ConstructionSigned-offDOLMEN DEVELOPERS, INC11/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offDOLMEN DEVELOPERS, INC11/07/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION10/30/2024
DOB NOWSupported ScaffoldSigned-offNEW AMERICAN CONSTRUCTION10/30/2024
DOB NOWMechanical SystemsPermit IssuedADE CONSTRUCTION GROUP IN10/12/2023
DOB NOWPlumbingSigned-offIMPACT PLUMBING INC06/08/2023
DOB NOWGeneral ConstructionSigned-offADE CONSTRUCTION GROUP IN05/25/2023
BISPLISSUEDT-REX PLBG AND HTG CORP09/20/2004
BISPLISSUEDNYC PARKS & RECREATION04/09/2001
BISBLISSUEDDUAL FUEL PLMB & HTNG02/24/2000
BISPLISSUEDDUAL FUEL PLMB & HTNG02/24/2000
BISMHISSUEDH & H BUILDING CONSULTANTS,INC.07/29/1999
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/23/1999
BISPLISSUEDNYC PARKS & RECREATION01/13/1999
BISOTISSUEDPOWER CONSTRUCTION COMP01/04/1999
BISPLISSUEDNYC PARKS & RECREATION08/14/1998
BISMHISSUEDPOWER CONSTRUCTIN COMPANY07/27/1998
BISMHISSUEDHSU & ASSOCIATES01/08/1998
BISOTISSUEDCUSTON CRAFTMAN OF BKLYN INC03/20/1997
BISPLISSUEDMORTON CHAIT03/20/1997
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING CO01/31/1997
BIS—ISSUEDPOWER CONSTRUCTION. CO..05/31/1996
BISPLISSUEDREEM PLG & HTG CORP09/14/1995
BIS—ISSUEDARE-JAY CONSTRUCTION CO.08/17/1995
BISEQISSUEDCOLORITE FILM08/17/1995
4 projects · most recent 07/31/2025
General Wiring
FiledStatusContractorScope
07/31/2025Permit IssuedLAREDO ELECTRIC, INC.General Wiring
10/29/2024CompleteRICHARD NEU—
08/14/2023CompleteLAREDO ELECTRIC, INC.—
01/30/2019Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/20/2025Post-installed AnchorsJOSHUA LUCKRITZspecial
06/20/2025Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
06/20/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
06/20/2025MasonryJOSHUA LUCKRITZspecial
06/20/2025FinalLevon Shaginyanprogress
06/12/2025FinalLevon Shaginyanprogress
06/12/2025MasonryJOSHUA LUCKRITZspecial
06/12/2025Post-installed AnchorsJOSHUA LUCKRITZspecial
06/12/2025Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
06/12/2025Tenant Protection Plan Compliance—special
11/07/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
06/23/2023FinalALEKSANDR LEVINprogress
06/23/2023Mechanical SystemsALEKSANDR LEVINspecial
06/23/2023Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
06/23/2023Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/23/2023Shutoff dampersALEKSANDR LEVINenergy_progress
06/22/2023HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
06/22/2023Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/22/2023Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
06/14/2023FinalALEKSANDR LEVINprogress
06/14/2023Tenant Protection Plan Compliance—special
06/14/2023Shutoff dampersALEKSANDR LEVINenergy_progress
06/14/2023Mechanical SystemsALEKSANDR LEVINspecial
06/14/2023Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/14/2023FinalALEKSANDR LEVINprogress
Latest 25 of 30.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/31/2026M00859511-P1Request digital key ↗
08/31/2026M00859511-I1Request digital key ↗
08/31/2026M00859505-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/31/2026M00859511-I1Open ↗
08/31/2026M00859511-P1Open ↗
08/31/2026M00859505-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M00862128-P1Open ↗
09/02/2026M00862128-P1Open ↗
09/01/2026M00859511-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M00862128-P1Open ↗
09/01/2026M01113356-P1Open ↗
09/01/2026M00859511-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/31/2026M00859511-P1Open ↗
08/31/2026M00859511-I1Open ↗
08/31/2026M00859505-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01125368-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00859505-P1Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/25/2026M01113356-I1Open ↗
08/13/2026M01113356-P1Open ↗
▸DOB NOWCalculations2
08/25/2026M01113356-I1Open ↗
08/13/2026M01113356-P1Open ↗