← Back
BuildNYC
Public elementary, junior or senior high
Manhattan School for Career Development
113 EAST 4TH STREET · East Village · BIN 1006208
💬 Discuss this project
1920Year Built
5Stories
W1Building Class
R8BZoning
40,000 sfGross Floor Area
0Units
LL97 Covered16 Active Violations 0 unresolved · 16 paperwork only 1 likely answered 2 old, status unconfirmed ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 23,626 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 51 filing
Floor 41 filing
Floor 31 filing
Floor 21 filing
Floor 11 filing
Cellar1 filing
Site & exterior2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority4808/30/2026
NYC Department of Education303/22/2026
City303/21/2026
NYC Police Department103/21/2026
Nysca103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DI Domenico + Partners202/13/2026
Dseny Engineering Services202/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dseny Engineering Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kel-Tech ConstructionScaffold608/30/2026
Unisys ElectricElectrical203/21/2026
E.N.E.L. ElectricalElectrical103/21/2026
Mac Fhionnghaile & SonsElectrical103/22/2026
Stanco System Electrical ContElectrical103/22/2026
Laser Electrical Constr'gElectrical103/22/2026
Hexagon Construction & Electrical GroupElectrical103/22/2026
Building Lifecycle
All (130)Filed (4)Permit Issued (2)Violation (98)Objection (1)Special Inspection (9)
10/16/2026
Elevator Category 1 inspection report filed
08/27/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M01125013-I1-SH
08/07/2026
Reisued ECB#35724604M failure to maintain building in code-compliant manner.noted at school yard the fence along rear property line at street…
ECB violation · open
08/07/2026
Reissued ECB#35724606X failure to maintain building in code-compliant manner.noted several fpsc smoke doors not self-closing throughout the…
ECB violation · open
08/07/2026
Reissued ECB#35724605Y failure to maintain building in code-compliant manner.illumination for exits,exit discharges and public corridors perbc…
ECB violation · open
08/07/2026
Reissued ECB#35724603K failure to maintain building in code-compliant manner.noted ceiling and walls peeling and spalling at basement level at…
ECB violation · open
08/07/2026
Exit door not self closing.noted:exit door#4 not self closing.rem:repair replace door.
ECB violation · open
05/28/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M01125013-I1-SH
05/18/2026
Boiler inspection report filed
Initial · defects found · Accepted
05/18/2026
Boiler inspection report filed
Initial · no defects · Accepted
02/26/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M01125013-I1-SH
02/24/2026
Objection raised — Other
02/17/2026
Permit renewed — Construction Fence
Renewed without changes
M01176036-I1-FN
02/13/2026
Filed — Alteration
751M Masonry, roofing, foundation wall waterproofing and interior repairs
M01357381-I1
02/13/2026
Filed — Alteration
751M Masonry, roofing, foundation wall waterproofing and interior repairs
M01357381-S1
02/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/13/2026
Special inspection requirement — Post-installed Anchors
02/09/2026
Special inspection requirement — Masonry
02/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/09/2026
Special inspection requirement — Subgrade Inspections
02/09/2026
Special inspection requirement — Post-installed Anchors
02/09/2026
Special inspection requirement — Concrete - Cast-In-Place
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/22/2025
: failure to maintain building in code compliant manner. Service elevator equipment as per BC3001.2 & 27-987. Upon inspection, the device is found…
ECB violation · open
09/10/2025
Re-issue #35688929P. Failure to maintain building in code-compliant manner. Illumination for exits, exit discharges and public corridors perbc…
ECB violation · open
09/10/2025
Re-issue #35688936N. Failure to maintain building in code-compliant manner. Noted: at school yard, the fence along rear property line at street is…
ECB violation · open
09/10/2025
Re-issue #35688937P. Failure to maintain building in code-compliant manner. Noted: at basement level(supply rm), ceiling and wall peeling, damage…
ECB violation · open
09/10/2025
Re-issue #35688927L. Failure to maintain building in code-compliant manner. Noted: there are several doors on 4TH and 5TH floors that are not…
ECB violation · open
04/22/2025
Boiler inspection report filed
Initial · no defects · Accepted
02/28/2025
Permit issued — Construction Fence
M01176036-I1-FN
02/26/2025
Permit issued — Sidewalk Shed
M01125013-I1-SH
02/19/2025
Filed — Alteration
FN/PS751M - FOR TEMPORARY CONSTRUCTION EQUIPMENT (EMERGENCY FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO LLW#141073. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01176036-I1
12/12/2024
: failure to maintain building in code compliant manner. Service elevator equipment as per BC3001.2 & 27-987. Upon inspection, the device is found…
ECB violation · open
11/26/2024
Filed — Alteration
M01125013-I1
09/19/2024
Failure to maintain building in code-compliant manner.observed at bulkhead cracks and spalling at ceiling & walls.rem:repair and/or replace.
ECB violation · closed
09/19/2024
Reissue#35674866J failure to maintain building in code-compliant manner.observed at 5TH floor classrooms,hallway ceilings spalling and cracks…
ECB violation · closed
09/19/2024
Exit door not self-closing.observed at 3 floor smoke by 302,exit 4 AND5 doors are not closing properly.rem:repair/replace door.
ECB violation · closed
09/19/2024
Failure to maintain building in code-compliant manner.observed at exposure 3(black)fence in disrepair,angeled and broken fencing.rem:repair and/or…
ECB violation · open
09/19/2024
Failure to maintain building in code-compliant manner.observed at 5 floor 508,4 fl 401,402 doors are not closing properly.rem:repair and/or replace.
ECB violation · open
09/19/2024
Failure to maintain building in code-compliant manner.illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.no emergency…
ECB violation · open
09/19/2024
Failure to maintain building wall(s)or appurtenances.observed at exposure 1 facade cornice at pipe running from sidewalk to roof in disrepair,also…
ECB violation · closed
09/19/2024
Failure to maintain building in code-compliant manner.observed at all throughout broken glass panels.rem:repair and/or replace.rem:repair and/or…
ECB violation · closed
09/19/2024
Failure to maintain building in code-compliant manner.observed at rooflevel chimney running and stop cracks and parapet in disrepair.rem:repair…
ECB violation · closed
09/19/2024
Failure to maintain building in code-compliant manner.observed at basement supply area ceiling in disrepair water penetration and…
ECB violation · open
09/18/2024
Failure to maintain building in code-compliant manner.observed at exposure 2 spider crack and running throughout entire wall,exit 5…
ECB violation · closed
04/11/2024
Boiler inspection report filed
Initial · defects found · Accepted
07/28/2023
Boiler inspection report filed
Initial · defects found · Accepted
06/20/2023
Reissue#35657954P failure to maintain building in code-compliant manner. At time of my inspection i observed at 5TH floor room 509 and roof level…
ECB violation · closed
07/11/2022
Boiler inspection report filed
Initial · defects found · Accepted
07/11/2022
Boiler inspection report filed
Initial · no defects · Accepted
05/23/2022
REISSUE35558076R DOI4.28.21 failure to maintain bldg in codecompliant manner.illumination for exits,exit discharges&public corridors per…
ECB violation · closed
05/23/2022
Failure to maintain bldg in codecompliant manner.atoi i observed that@5FL@RM509@roof level water penetration for leakage in roof.@5FL RM506 leakage…
ECB violation · closed
05/23/2022
Exit door not selfclosing properly atoi.atoi i observed that@3FL auditorium 2EXIT door not selfclosing properly.@1FL gym 1EXIT (way to 4THST),@1FL…
ECB violation · closed
10/08/2021
Boiler inspection report filed
Initial · defects found · Accepted
07/13/2021
Elevator: elevatorrequired (DOB violation)
DOB violation · open · Issued 2021; DOB's record still lists it as active
04/28/2021
Reissue#35495774Z failure to maintain bldg in code compliant manner: illumination for exits,exit discharge & public corridors per bc 1006.1;27-281.…
ECB violation · closed
06/02/2020
Elevator: elevatorrequired (DOB violation)
DOB violation · open · Issued 2020; DOB's record still lists it as active
05/29/2020
Boiler inspection report filed
Initial · defects found · Accepted
05/29/2020
Reissue#35422232R failure to maintain bldg in code compliant manner: illumination for exits,exit dischsarges & public corridors per bc…
ECB violation · closed
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Kel-Tech Construction—
DOB NOW—Kel-Tech Construction—
DOB NOW—Kel-Tech Construction—
DOB NOW—Kel-Tech Construction—
DOB NOW—Kel-Tech Construction—
DOB NOW—Kel-Tech Construction—
BIS—Varsity Plumbing and Heating—
BIS—Euro Castle Construction—
BIS—Euro Castle Construction—
BIS—Varsity Plumbing and Heating—
BIS—U & I Mechanical—
BIS—Euro Castle Construction—
BIS—Euro Castle Construction—
BIS—Euro Castle Construction—
BIS—Varsity Plumbing and Heating—
BIS—U & I Mechanical—
BIS—Euro Castle Construction—
BIS—ABC Construction Cont—
BIS—Varsity Plumbing and Heating—
BIS—Franco Belli P&H & Sons—
BIS—Bri-Den Construction Co—
BIS—Bri-Den Construction Co—
BIS—Varsity Plumbing and Heating—
BIS—Central Mechanical Systems—
BIS—N.J.D. Wiring & Electric I—
BIS—Franco Belli P&H & Sons—
BIS—Bri-Den Construction Co—
BIS—Bri-Den Construction Co—
BIS—N.J.D. Wiring & Electric I—
BIS—Franco Belli Plumbing and Heating—
BIS—RVS Construction—
BIS—RVS Construction—
BIS—RVS Construction—
BIS—Bri-Den Construction Co—
BIS—Bri-Den Construction Co—
BIS—Maximum Mechanical—
BIS—Maximum Mechanical—
BIS—Franco Belli Plumbing and Heating—
BIS—Bri-Den Construction Co—
BIS—Maximum Mechanical—
+ 16 more permits on file
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026M01125013-I1Request the plans ↗
08/24/2026M01176036-I1Request the plans ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026M01125013-I1Open ↗
08/24/2026M01176036-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026M01125013-I1Open ↗
08/13/2026M01176036-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026M01357381-I1Open ↗
08/13/2026M01125013-I1Open ↗
08/13/2026M01176036-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026M01357381-I1Open ↗
08/13/2026M01357381-S1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M01176036-I1Open ↗
08/13/2026M01125013-I1Open ↗
▸Other Documents4
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal4
08/13/2026M01125013-I1Open ↗
08/13/2026M01176036-I1Open ↗
08/13/2026M01357381-S1Open ↗
Showing 3 of 4 on file for this type