← Back
Two family frame
113 OAK STREET
BROOKLYN · BIN 3065005
💬 Discuss this project
1899Year Built
3Stories
B2Building Class
R6BZoning
3,159 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 1.26 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof3p · 2 filings · 20 docs
Floor 31p · 3 filings · 20 docs
Floor 21p · 3 filings · 20 docs
Floor 14p · 3 filings · 20 docs
Cellar2p · 2 filings · 20 docs
Basement1 filing · 20 docs
1 job · most recent 08/18/2023
General Wiring
FiledStatusContractorScope
08/18/2023CompleteBRUNI ELECTRIC INCGeneral Wiring
1 job · most recent 11/09/2022
Concrete Wood
FiledStatusContractorScope
11/09/2022Signed-offMUHAN SPACE CORPConcrete, Wood
1 job · most recent 11/09/2022
Earthwork
FiledStatusContractorScope
11/09/2022Signed-offMUHAN SPACE CORPEarthwork
Building Lifecycle
All (72)Filed (10)Permit Issued (9)Signed Off (4)Inspection (9)Objection (10)Special Inspection (30)
07/02/2024
Signed off — Alteration CO
NEW RAISED WOOD ROOF, INSTALL NEW BULKHEAD AND WOOD PERGOLA, INSTALL A NEW RETAINING WALL, STAIR AND CONCRETE SLAB AT REAR PATIO, INSTALL NEW WOOD STAIRS AT REAR YARD.
B00680172-I1
06/18/2024
Signed off — Alteration
plumbing work as per plans filed herewith. No change to use, egress, or occupancy under this application. This application is associated with CO/GC application#JOB#B00680172.
B00681523-I1
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
05/20/2024
Filed — Alteration
plumbing work as per plans filed herewith. No change to use, egress, or occupancy under this application. This application is associated with CO/GC application#JOB#B00680172.
B00681523-P4
04/29/2024
Signed off — Alteration CO
NEW RAISED WOOD ROOF, INSTALL NEW BULKHEAD AND WOOD PERGOLA, INSTALL A NEW RETAINING WALL, STAIR AND CONCRETE SLAB AT REAR PATIO, INSTALL NEW WOOD STAIRS AT REAR YARD.
B00680172-S1
04/08/2024
Permit issued — Earth Work
B00680172-S1-GC-CX
02/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/21/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/21/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/22/2024
Permit issued — General Construction
B00680172-I1-GC
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
11/22/2023
Filed — Alteration
plumbing work as per plans filed herewith. No change to use, egress, or occupancy under this application. This application is associated with CO/GC application#JOB#B00680172.
B00681523-P3
11/22/2023
Special inspection requirement — Structural Steel - Details
ANDREW RENFROE
11/22/2023
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREW RENFROE
11/22/2023
Special inspection requirement — Structural Cold-Formed Steel
ANDREW RENFROE
11/22/2023
Special inspection requirement — Structural Steel - High Strength Bolting
ANDREW RENFROE
11/22/2023
Special inspection requirement — Final
ANDREW RENFROE
11/22/2023
Special inspection requirement — Footing and Foundation
ANDREW RENFROE
11/22/2023
Special inspection requirement — Structural Wood Frame
ANDREW RENFROE
11/22/2023
Special inspection requirement — Structural Steel - Welding
ANDREW RENFROE
11/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANDREW RENFROE
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
11/13/2023
Objection resolved — Addressed
10/20/2023
Permit issued — Plumbing
B00681523-I1-PL
10/11/2023
Signed off — Alteration
Installation of a new kitchen hood, exhaust fan, split AC system and associated duct work as per plans filed herewith. No change to use, egress, or occupancy under this application. This application is associated with CO/GC application#JOB#B00680172.
B00680234-I1
09/25/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/18/2023
Special inspection requirement — Maintenance information
XIAOJUN WANG
09/18/2023
Special inspection requirement — Final
CALVIN TRAN
09/18/2023
Special inspection requirement — Duct leakage testing, insulation and design
XIAOJUN WANG
09/18/2023
Special inspection requirement — Mechanical Systems
XIAOJUN WANG
09/18/2023
Special inspection requirement — Ventilation and air distribution system
XIAOJUN WANG
09/18/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
09/13/2023
Filed — Alteration
Installation of a new kitchen hood, exhaust fan, split AC system and associated duct work as per plans filed herewith. No change to use, egress, or occupancy under this application. This application is associated with CO/GC application#JOB#B00680172.
B00680234-P1
07/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/05/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2023
Permit issued — Plumbing
B00681523-I1-PL
11/17/2022
Objection raised — Zoning
11/09/2022
Filed — Alteration CO
NEW RAISED WOOD ROOF, INSTALL NEW BULKHEAD AND WOOD PERGOLA, INSTALL A NEW RETAINING WALL, STAIR AND CONCRETE SLAB AT REAR PATIO, INSTALL NEW WOOD STAIRS AT REAR YARD.
B00680172-P1
10/24/2022
Permit issued — General Construction
B00680172-I1-GC
10/12/2022
Special inspection requirement — Fenestration areas
Daniel Kidd
10/12/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Daniel Kidd
10/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
10/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOJUN WANG
10/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Kidd
10/12/2022
Special inspection requirement — Energy Code Compliance Inspections
Daniel Kidd
10/12/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Kidd
10/12/2022
Special inspection requirement — Insulation placement and R values
Daniel Kidd
10/12/2022
Special inspection requirement — Exterior lighting power
Daniel Kidd
10/12/2022
Special inspection requirement — Fenestration air leakage
Daniel Kidd
10/12/2022
Special inspection requirement — Lighting in dwelling units
Daniel Kidd
10/12/2022
Special inspection requirement — Air barrier - visual inspection
Daniel Kidd
10/06/2022
Objection resolved — Addressed
10/05/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Structural
09/27/2022
Objection raised — Zoning
09/27/2022
Objection resolved — Addressed
09/27/2022
Objection raised — Scope
Latest 60 of 72 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2021$2.1M—Private party → Private party$665/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION205/20/2024
2LS CONSULTING ENGINEERING, DPC411/22/2023
BLUE SKY DESIGN, INC.211/09/2022
DEMO ARCHITECTURE, PLLC208/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DI MARTINI INCGeneral Contractor507/08/2026
MUHAN SPACE CORPGeneral Contractor507/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUST CONSULTING ENGINEERI5865805/20/2024
BLUE SKY DESIGN, INC.1908211/09/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offMUHAN SPACE CORP04/08/2024
DOB NOWGeneral ConstructionPermit IssuedMUHAN SPACE CORP01/22/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT10/20/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT01/04/2023
DOB NOWGeneral ConstructionPermit IssuedMUHAN SPACE CORP10/24/2022
DOB NOWStructuralSigned-offDI MARTINI05/20/2022
DOB NOWMechanical SystemsSigned-offDI MARTINI05/18/2022
DOB NOWGeneral ConstructionPermit IssuedDI MARTINI05/17/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING05/13/2022
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/21/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/21/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/25/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/05/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
05/31/2024Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
01/02/2024Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
11/22/2023Structural Steel - DetailsANDREW RENFROEspecial
11/22/2023Alternative Materials - OTCR Buildings Bulletin NumberANDREW RENFROEspecial
11/22/2023Structural Cold-Formed SteelANDREW RENFROEspecial
11/22/2023Structural Steel - High Strength BoltingANDREW RENFROEspecial
11/22/2023FinalANDREW RENFROEprogress
11/22/2023Footing and FoundationANDREW RENFROEprogress
11/22/2023Structural Wood FrameANDREW RENFROEprogress
11/22/2023Structural Steel - WeldingANDREW RENFROEspecial
11/22/2023Structural Stability – Alterations of existing buildingsANDREW RENFROEspecial
11/20/2023Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
09/18/2023Maintenance informationXIAOJUN WANGenergy_progress
09/18/2023FinalCALVIN TRANprogress
09/18/2023Duct leakage testing, insulation and designXIAOJUN WANGenergy_progress
09/18/2023Mechanical SystemsXIAOJUN WANGspecial
09/18/2023Ventilation and air distribution systemXIAOJUN WANGenergy_progress
09/18/2023Energy Code Compliance InspectionsXIAOJUN WANGprogress
10/12/2022Fenestration areasDaniel Kiddenergy_progress
10/12/2022Exterior Insulation and Finish Systems (EIFS)Daniel Kiddspecial
10/12/2022Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
10/12/2022Structural Stability – Alterations of existing buildingsXIAOJUN WANGspecial
10/12/2022Fire-Resistance Rated ConstructionDaniel Kiddprogress
10/12/2022Energy Code Compliance InspectionsDaniel Kiddprogress
10/12/2022Fenestration and door U-factor and product ratingsDaniel Kiddenergy_progress
Latest 25 of 57.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026B00681523-P3Request digital key ↗
08/31/2026B00681523-I1Request digital key ↗
08/31/2026B00681523-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/28/2026B00680172-I1Open ↗
08/15/2026B00680172-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/28/2026B00680172-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature30
09/26/2026B00680172-S1Open ↗
09/18/2026B00680172-P2Open ↗
09/18/2026B00680172-P2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/26/2026B00680172-S1Open ↗
09/26/2026B00680172-S1Open ↗
09/26/2026B00680172-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026B00681523-P4Open ↗
08/31/2026B00681523-P3Open ↗
08/31/2026B00681523-I1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/28/2026B00680172-I1Open ↗
08/28/2026B00680172-S1Open ↗
08/15/2026B00680172-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026B00681523-I1Open ↗
08/31/2026B00680234-I1Open ↗
08/28/2026B00680172-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/28/2026B00680172-I1Open ↗
08/13/2026B00680234-I1Open ↗
▸Other Documents16
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/28/2026B00680172-I1Open ↗
08/28/2026B00680172-S1Open ↗
08/15/2026B00680172-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/28/2026B00680172-I1Open ↗
08/28/2026B00680172-S1Open ↗
08/15/2026B00680172-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/28/2026B00680172-S1Open ↗
08/15/2026B00680172-P1Open ↗
08/15/2026B00680172-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/28/2026B00680172-I1Open ↗
08/15/2026B00680172-P2Open ↗
▸DOB NOWFinal Survey1
08/28/2026B00680172-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/28/2026B00680172-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/28/2026B00680172-S1Open ↗