← Back
BuildNYC
Five to six families
113 SOUTH OXFORD STREET
BROOKLYN · Fort Greene · BIN 3255890
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R6BZoning
—Gross Floor Area
5Units
6 Active Violations ▸FDNY Report ↗
Five to six families · Owner of record: 113 South Oxford Street · 2.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Under Construction14p · 1 filing · 20 docs
Floor 1Under Construction26p · 1 filing · 20 docs
BasementUnder Construction4p · 1 filing · 20 docs
Sub-BasementUnder Construction26p · 1 filing · 20 docs
Site & exteriorUnder Construction22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
113 South Oxford St1111/20/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BO Lee Architect611/19/2026
D'Antonio Consulting Engineers105/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brookyln SolarworksElectrical103/22/2026
Amin Home ImprovementsGeneral Contractor106/27/2026
BK Iron Worksspecialty_contractor106/27/2026
Brooklyn SolarworksGeneral Contractor103/21/2026
CFH ContractingPlumbing103/21/2026
ACS Mechanicsspecialty_contractor109/18/2026
Pipe Solutions AdvisPlumbing109/18/2026
Juno ContrngGeneral Contractor106/24/2004
Leroy A MatthiasGeneral Contractor108/13/2012
Spring ScaffoldingGeneral Contractor107/16/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Welldone Inspection8628611/19/2026
D'Antonio Consulting Engineering931105/01/2026
Building Lifecycle
11/19/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH APARTMENT RENOVATION. INSTALL KITCHEN PLUMBING FIXTURES AND ASSOCIATED PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01308190-P3
10/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/17/2026
Permit issued — Mechanical Systems
B01308190-S1-MS
09/17/2026
Permit issued — Plumbing
B01308190-S2-PL
06/23/2026
Special inspection requirement — Post-installed Anchors
QIUFAN JIANG
74 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedACS Mechanics09/17/2026
DOB NOWPlumbingPermit IssuedPipe Solutions Advis09/17/2026
DOB NOWGeneral ConstructionPermit IssuedAmin Home Improvements06/01/2026
DOB NOWStructuralPermit IssuedBK Iron Works05/21/2026
BISOTISSUEDBrooklyn Solarworks04/25/2022
BISPLISSUEDCFH Contracting01/10/2013
BIS—ISSUEDLeroy A Matthias08/13/2012
BISEQISSUEDSpring Scaffolding07/16/2004
BISOTISSUEDJuno Contracting06/24/2004
BIS—ISSUEDJohn Hlad Plumbing and Heating03/04/1996
1 project · most recent 11/19/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
11/19/2026Permit IssuedACS MechanicsHeating and Air Conditioning Systems
1 project · most recent 11/19/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/19/2026Permit IssuedPipe Solutions AdvisGas, Water/Sanitary
4 projects · most recent 09/29/2022
General Wiring
FiledStatusContractorScope
09/29/2022Permit IssuedBrookyln Solarworks—
05/20/2022CompleteBrookyln Solarworks—
02/23/2021CompleteAntonio Ceriello ElectricGeneral Wiring
09/11/2020CompleteAntonio Ceriello ElectricGeneral Wiring
1 project · most recent 11/19/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
11/19/2026Permit IssuedPipe Solutions AdvisSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
06/23/2026Post-installed AnchorsQIUFAN JIANGspecial
06/23/2026Wood – Seismic ResistanceQIUFAN JIANGspecial
06/23/2026Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
06/23/2026FinalWilliam Chengprogress
06/23/2026Structural Wood FrameQIUFAN JIANGprogress
06/23/2026Structural Steel - DetailsQIUFAN JIANGspecial
06/23/2026Concrete - Cast-In-PlaceQIUFAN JIANGspecial
06/23/2026Structural Steel - High Strength BoltingQIUFAN JIANGspecial
06/23/2026Structural Steel - WeldingQIUFAN JIANGspecial
06/23/2026MasonryQIUFAN JIANGspecial
06/02/2026Structural Steel - High Strength Bolting—special
06/02/2026Concrete - Cast-In-Place—special
06/01/2026Post-installed AnchorsQIUFAN JIANGspecial
06/01/2026Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
06/01/2026Structural Steel - DetailsQIUFAN JIANGspecial
06/01/2026Structural Steel - WeldingQIUFAN JIANGspecial
06/01/2026Wood – Seismic Resistance—special
06/01/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
06/01/2026Structural Wood FrameQIUFAN JIANGprogress
06/01/2026FinalWilliam Chengprogress
06/01/2026Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
06/01/2026Energy Code Compliance InspectionsBO LEEprogress
06/01/2026FinalBO LEEprogress
06/01/2026Fire-Resistance Rated ConstructionBO LEEprogress
06/01/2026Air barrier - visual inspection—energy_progress
Latest 25 of 38.
74 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account