← Back
Three families
113 ST JAMES PLACE
BROOKLYN · BIN 3056125
💬 Discuss this project
1865Year Built
3Stories
C0Building Class
R6BZoning
3,898 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 2,000 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof15p · 1 filing · 20 docs
Floor 311p · 1 filing · 20 docs
Floor 211p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
Basement10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANAGEMENT C AJ GREENWICH203/22/2026
AJ GREENWICH MANAGEMENT C403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/08/2021$3.2M—Private party → Private party$821/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABS ENGINEERING, PLLC502/21/2025
SHAPELESS STUDIO212/06/2022
OLD STRUCTURES ENGINEERING211/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES803/21/2026
CODE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AJ GREENWICH MANAGEMENT CGeneral Contractor3807/08/2026
AJC SPRINKLER CORPFire Protection307/08/2026
A.M.N. CORPORATIONPlumbing207/08/2026
ELMAC ELECTRIC INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABS ENGINEERING, PLLC4835502/21/2025
AVT ENGINEERING345211/10/2022
CHEN ENGINEERING SERVICES1826311/10/2022
Building Lifecycle
All (129)Filed (9)Permit Issued (23)Signed Off (6)Violation (6)Inspection (7)Objection (48)Special Inspection (30)
01/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/10/2025
Signed off — Alteration CO
Mechanical fit-out in conjunction with ALT-CO.
B00656641-S5
09/03/2025
Signed off — Alteration CO
Mechanical fit-out in conjunction with ALT-CO.
B00656641-S6
07/28/2025
Signed off — Alteration
Construction fence for front areaway
B08049709-I1
06/04/2025
Permit issued — General Construction
B00656641-I1-GC
06/03/2025
Permit issued — Mechanical Systems
B00656641-S6-MS
06/03/2025
Permit issued — Construction Fence
B08049709-I1-FN
05/06/2025
Signed off — Alteration CO
Mechanical fit-out in conjunction with ALT-CO.
B00656641-S2
05/06/2025
Signed off — Alteration CO
Mechanical fit-out in conjunction with ALT-CO.
B00656641-S7
04/30/2025
Signed off — Alteration CO
Mechanical fit-out in conjunction with ALT-CO.
B00656641-S3
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
03/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Alex Schwartz
03/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Alex Schwartz
03/17/2025
Special inspection requirement — Maintenance information
Alex Schwartz
03/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alex Schwartz
03/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Alex Schwartz
03/17/2025
Special inspection requirement — Post-installed Anchors
Alex Schwartz
02/21/2025
Filed — Alteration CO
Mechanical fit-out in conjunction with ALT-CO.
B00656641-P2
10/16/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/10/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/26/2024
Permit issued — Sprinklers
B00656641-S7-EW-SP
07/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/28/2024
Violation issued (ECB, closed)
Construction
06/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/06/2024
Permit issued — Construction Fence
B08049709-I1-FN
06/03/2024
Permit issued — Structural
B00656641-S3-ST
06/03/2024
Permit issued — Mechanical Systems
B00656641-S6-MS
06/03/2024
Permit issued — General Construction
B00656641-I1-GC
05/30/2024
Permit issued — Plumbing
B00656641-S5-PL
03/26/2024
Violation issued (ECB, closed)
Construction
03/20/2024
Violation issued (ECB, closed)
Construction
03/20/2024
Violation issued (ECB, closed)
Construction
03/20/2024
Violation issued (ECB, closed)
Unknown
03/20/2024
Violation issued (ECB, closed)
Unknown
10/24/2023
Permit issued — Sprinklers
B00656641-S7-EW-SP
10/17/2023
Permit issued — General Construction
B00656641-I1-GC
10/17/2023
Permit issued — Foundation
B00656641-S2-FO
06/22/2023
Permit issued — Foundation
B00656641-S2-FO
06/07/2023
Permit issued — Construction Fence
B08049709-I1-FN
06/07/2023
Permit issued — General Construction
B00656641-I1-GC
06/06/2023
Permit issued — Structural
B00656641-S3-ST
06/06/2023
Permit issued — Mechanical Systems
B00656641-S6-MS
05/23/2023
Permit issued — Structural
B00656641-S3-ST
05/23/2023
Permit issued — Mechanical Systems
B00656641-S6-MS
05/23/2023
Permit issued — Sprinklers
B00656641-S7-EW-SP
05/23/2023
Permit issued — Plumbing
B00656641-S5-PL
05/12/2023
Permit issued — General Construction
B00656641-I1-GC
04/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
04/24/2023
Special inspection requirement — Sprinkler Systems
Alex Schwartz
04/24/2023
Special inspection requirement — Post-installed Anchors
Alex Schwartz
04/21/2023
Filed — Alteration CO
Mechanical fit-out in conjunction with ALT-CO.
B00656641-P1
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
04/18/2023
Special inspection requirement — Sprinkler Systems
Alex Schwartz
04/18/2023
Special inspection requirement — Post-installed Anchors
Alex Schwartz
03/13/2023
Permit issued — Construction Fence
B08049709-I1-FN
01/26/2023
Objection raised — Inspections
01/26/2023
Objection resolved — Addressed
01/26/2023
Objection raised — Other
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAJ GREENWICH MANAGEMENT C06/04/2025
DOB NOWMechanical SystemsSigned-offAJ GREENWICH MANAGEMENT C06/03/2025
DOB NOWConstruction FenceSigned-offAJ GREENWICH MANAGEMENT C06/03/2025
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP08/26/2024
DOB NOWConstruction FenceSigned-offAJ GREENWICH MANAGEMENT C06/06/2024
DOB NOWStructuralSigned-offAJ GREENWICH MANAGEMENT C06/03/2024
DOB NOWMechanical SystemsSigned-offAJ GREENWICH MANAGEMENT C06/03/2024
DOB NOWGeneral ConstructionPermit IssuedAJ GREENWICH MANAGEMENT C06/03/2024
DOB NOWPlumbingSigned-offA.M.N. CORPORATION05/30/2024
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP10/24/2023
DOB NOWGeneral ConstructionPermit IssuedAJ GREENWICH MANAGEMENT C10/17/2023
DOB NOWFoundationSigned-offAJ GREENWICH MANAGEMENT C10/17/2023
DOB NOWFoundationSigned-offAJ GREENWICH MANAGEMENT C06/22/2023
DOB NOWConstruction FenceSigned-offAJ GREENWICH MANAGEMENT C06/07/2023
DOB NOWGeneral ConstructionPermit IssuedAJ GREENWICH MANAGEMENT C06/07/2023
DOB NOWStructuralSigned-offAJ GREENWICH MANAGEMENT C06/06/2023
DOB NOWMechanical SystemsSigned-offAJ GREENWICH MANAGEMENT C06/06/2023
DOB NOWStructuralSigned-offAJ GREENWICH MANAGEMENT C05/23/2023
DOB NOWMechanical SystemsSigned-offAJ GREENWICH MANAGEMENT C05/23/2023
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP05/23/2023
DOB NOWPlumbingSigned-offA.M.N. CORPORATION05/23/2023
DOB NOWGeneral ConstructionPermit IssuedAJ GREENWICH MANAGEMENT C05/12/2023
DOB NOWConstruction FenceSigned-offAJ GREENWICH MANAGEMENT C03/13/2023
1 project · most recent 02/21/2025
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/21/2025Permit IssuedAJ GREENWICH MANAGEMENT CHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ 48,000 BTU · Condensing Unit ×1
MXZ-SM48NAMHZ2 60,000 BTU · Condensing Unit ×1
MXZ-SM60NAM 36,000 BTU · Condensing Unit ×1
Heating
Lochinvar KHB155N 155,000 BTU · Boiler ×1
1 project · most recent 02/21/2025
Sprinkler System
FiledStatusContractorScope
02/21/2025Signed-offAJC SPRINKLER CORPSprinkler System
2 projects · most recent 06/25/2025
General Wiring
FiledStatusContractorScope
06/25/2025CompleteI&E ELECTRIC, INC2 meters
06/01/2023CompleteELMAC ELECTRIC INC.General Wiring
1 project · most recent 02/21/2025
Steel Masonry
FiledStatusContractorScope
02/21/2025Permit IssuedAJ GREENWICH MANAGEMENT CSteel, Masonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
03/17/2025Fire-Resistant Penetrations and JointsAlex Schwartzspecial
03/17/2025HVAC-R and service water heating system controlsAlex Schwartzenergy_progress
03/17/2025HVAC-R and service water heating equipmentAlex Schwartzenergy_progress
03/17/2025Maintenance informationAlex Schwartzenergy_progress
03/17/2025HVAC-R and service water piping design and insulationAlex Schwartzenergy_progress
03/17/2025Energy Code Compliance InspectionsAlex Schwartzprogress
03/17/2025Post-installed AnchorsAlex Schwartzspecial
04/24/2023Fire-Resistant Penetrations and JointsAlex Schwartzspecial
04/24/2023Sprinkler SystemsAlex Schwartzspecial
04/24/2023Post-installed AnchorsAlex Schwartzspecial
04/18/2023Fire-Resistant Penetrations and JointsAlex Schwartzspecial
04/18/2023Sprinkler SystemsAlex Schwartzspecial
04/18/2023Post-installed AnchorsAlex Schwartzspecial
11/08/2022Construction Operations Influencing Adjacent StructuresHENLIA CHENspecial
11/08/2022Construction Operations Influencing Adjacent StructuresHENLIA CHENspecial
08/26/2022Post-installed AnchorsAlex Schwartzspecial
08/26/2022Heating SystemsAlex Schwartzspecial
08/26/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
07/19/2022Mechanical SystemsAlex Schwartzspecial
07/19/2022FinalAlex Schwartzprogress
05/13/2022Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
05/13/2022Subsurface Investigations (Borings/Test Pits)JOSEPH PASATUROspecial
04/07/2022Structural Steel - WeldingHENLIA CHENspecial
04/07/2022Post-installed AnchorsHENLIA CHENspecial
04/07/2022Subgrade InspectionsJOSEPH PASATUROspecial
Latest 25 of 34.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026B00656641-S7Request digital key ↗
08/28/2026B00656641-P1Request digital key ↗
08/28/2026B00656641-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/13/2026B00656641-S3Open ↗
08/13/2026B00656641-S5Open ↗
08/13/2026B00656641-S6Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00656641-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00656641-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWSpecial Inspector Seal & Signature17
09/02/2026B00656641-S5Open ↗
08/28/2026B00656641-S2Open ↗
08/28/2026B00656641-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026B00656641-I1Open ↗
08/13/2026B00656641-S6Open ↗
08/13/2026B08049709-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B00656641-S5Open ↗
09/02/2026B00656641-S5Open ↗
09/02/2026B00656641-S5Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00656641-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B00656641-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/13/2026B00656641-S6Open ↗
08/13/2026B00656641-S5Open ↗
08/13/2026B00656641-S2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00656641-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00656641-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00656641-S2Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/13/2026B00656641-S2Open ↗
08/13/2026B00656641-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00656641-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00656641-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00656641-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00656641-I1Open ↗