HPD08/08/2014§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS MINIMUM REQUIRED (LIGHT FIXTURES PRESENT)
DOB04/08/1993VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB05/26/1992VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
ECB07/19/2003OCCUPANCY CONTRARY TO THAT ALLOWED H.P.D RECORDS CELLAR CONVERTED FROM ORDINARY USE INTO TWO CLASSES 'A' APARTMENT.REMEDY:RESTORE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
ECB06/26/2003WORK WITHOUT A PERMIT WORK NOTED INSTALLED SHEETROCK PARTITIONS TWO THREE PC BATHROOMS AND TWO KITCHEN WITH GAS STOVES IN CELLAR REMEDY OBTAIN NECESSARY PERMIT AND RESTORE CELLAR TO PRIOR LEGAL CONDITIOBNothing owed — awaiting certificate of correction
ECB05/26/1994WORK WITHOUT A PERMIT. WORK NOTED: A RETAINING WALL WITHOUT A PERMITREMEDY: FILE PLANS, OBTAIN APPROVAL AND PERMIT FROM BLDG. DEPT.Nothing owed — awaiting certificate of correction
ECB04/28/1993WORK WITHOUT PERMIT. WORK NOTED: A RETURNING WALL APPROX 10'X26' AT REAR CONSTRUCTION WITHOUT A PERMIT REMEDY - FILE PLANS, OBTAIN APPROVAL AND PERMIT FROM THIS DEPARTMENT.Nothing owed — awaiting certificate of correction
ECB04/28/1993WORK WITHOUT A PERMIT WORK NOTED A RETAINING WALL APPROX 10'X26' AT REAR BEING CONSTRUCTED WITHOUT A PERMIT. REMEDY - FILE PLANS & OBTAIN APPROVAL AND PERMIT FROM THE DEPTNothing owed — awaiting certificate of correction
ECB05/26/1992WORK WITHOUT A PERMIT. WORK NOTED* REAR RETAINING CONSTRUCTED APPROX 12' X 25 WIDE MASONRY WITHOUT A PERMIT. REMEDY: FILE PLANS, OBTAIN PERMIT WITH THIS DEPT.Nothing owed — awaiting certificate of correction
ECB05/28/1991WORK WITHOUT A PERMIT WORK NOTED: A RETAINING WALL APPROX 10'426' AT REAR BEING CONSTRUCTED WITHOUT A PERMIT. STOP ALL WORK. REMEDY: FILE PLANS OBTAIN APPROVAL AND PERMIT FROM THIS DEPT.Nothing owed — awaiting certificate of correction