Walk-up apt, over six families with stores
1132 BROADWAY
BROOKLYN · BIN 3043310
💬 Discuss this project
1916Year Built
4Stories
C7Building Class
C4-4LZoning
7,016 sfGross Floor Area
9Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 1132 BROADWAY LLC · 2,145 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof1p · 1 filing · 20 docs
Penthouse3p · 3 filings · 20 docs
Floor 61p · 1 filing · 5 docs
Floor 5
Floor 4
Floor 33p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING907/08/2026
BRUKLYN BUILDERS4207/08/2026
1132 BROADWAY LLC203/22/2026
SUPERB CONSTRUCTION MGT903/22/2026
BROOKLYN BUILDERTS INC.203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/01/2020$715K—— → —$102/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADVANCED ENGINEERING & INSPECT. PLL610/03/2021
SYED ENGINEERING, P.C.608/09/2021
SH ENGINEERING PLLC404/12/2021
TECHNEMOTION DESIGN102/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP1103/21/2026
ADVANCED BUILDERS SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRUKLYN BUILDERS INCGeneral Contractor1507/08/2026
TECHNEMOTION DESIGNGeneral Contractor603/22/2026
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
ARIEL AKRABElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191010/03/2021
Building Lifecycle
All (140)Filed (17)Permit Issued (9)Signed Off (9)Violation (31)Inspection (2)Objection (42)Special Inspection (30)
05/01/2026
Violation issued (HPD, closed)
A
03/10/2022
Violation issued (HPD, closed)
A
10/15/2021
Signed off — Alteration
NEW PLUMBING FIXTURES THROUGHOUT
B00493119-I1
10/06/2021
Signed off — Alteration
SOE WORKTYPE IN CONJUNCTION WITH ALT 1 JOB #340780033
B00451533-I1
10/05/2021
Signed off — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN CONJUCTION WITH ALT 1 #340780033
B00447602-I1
10/03/2021
Filed — Alteration
NEW PLUMBING FIXTURES THROUGHOUT
B00493119-P2
10/03/2021
Violation issued (ECB, closed)
Construction
09/30/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/30/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
09/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/30/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
09/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/30/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/28/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00524400-I1
09/28/2021
Signed off — Alteration
B00489700-I1
09/13/2021
Objection resolved — Addressed
09/02/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/31/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/26/2021
Objection raised — Other
08/24/2021
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
08/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/23/2021
Filed — Alteration
NEW PLUMBING FIXTURES THROUGHOUT
B00493119-P1
08/23/2021
Filed — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN CONJUCTION WITH ALT 1 #340780033
B00447602-P1
08/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
08/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/20/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
08/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/20/2021
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
08/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
08/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/20/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
08/20/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/19/2021
Signed off — Alteration
B00509250-I1
08/17/2021
Violation issued (ECB, closed)
Construction
08/14/2021
Violation issued (ECB, closed)
Construction
08/14/2021
Violation issued (ECB, closed)
Construction
08/14/2021
Violation issued (ECB, closed)
Construction
08/12/2021
Signed off — Alteration
STRCUTURAL APPLICATION FILED IN CONJUNCTION WITH ALT 1 JOB #340780033
B00425770-I1
08/11/2021
Special inspection requirement — Final
RAFI HAMID
08/09/2021
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00524400-P1
07/22/2021
Violation issued (ECB, closed)
Construction
07/22/2021
Violation issued (ECB, closed)
Construction
07/22/2021
Violation issued (ECB, closed)
Unknown
07/22/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Violation issued (ECB, closed)
Construction
07/09/2021
Violation issued (ECB, closed)
Unknown
07/09/2021
Violation issued (ECB, closed)
Construction
07/09/2021
Violation issued (ECB, closed)
Construction
07/09/2021
Violation issued (ECB, closed)
Construction
06/14/2021
Filed — Alteration
B00489700-P3
06/14/2021
Special inspection requirement — Final
RAFI HAMID
06/10/2021
Filed — Alteration
B00489700-P2
06/09/2021
Permit issued — Supported Scaffold
B00524400-I1-SF
06/08/2021
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00524400-I1
05/13/2021
Filed — Alteration
B00489700-P1
05/12/2021
Signed off — Alteration
SOE WORKTYPE IN CONJUNCTION WITH ALT 1 JOB #340780033
B00451533-S1
05/12/2021
Permit issued — Mechanical Systems
B00509250-I1-MS
05/11/2021
Signed off — Alteration
SOE WORKTYPE IN CONJUNCTION WITH ALT 1 JOB #340780033
B00451533-S2
05/11/2021
Permit issued — Structural
B00425770-I1-ST
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING06/09/2021
DOB NOWMechanical SystemsSigned-offBRUKLYN BUILDERS INC05/12/2021
DOB NOWStructuralSigned-offBRUKLYN BUILDERS INC05/11/2021
DOB NOWFoundationSigned-offBRUKLYN BUILDERS INC05/11/2021
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/05/2021
DOB NOWSupport of ExcavationSigned-offBRUKLYN BUILDERS INC04/29/2021
DOB NOWPlumbingSigned-offYG SERVICES INC04/27/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING03/21/2021
DOB NOWConstruction FenceSigned-offBRUKLYN BUILDERS INC02/18/2021
BIS—ISSUEDBRUKLYN BUILDERS INC07/14/2021
BIS—ISSUEDSUPERB CONSTRUCTION MGT03/17/2021
2 projects · most recent 06/17/2021
General Wiring
FiledStatusContractorScope
06/17/2021CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
03/20/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/02/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/31/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/30/2021HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/30/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
09/30/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/30/2021Maintenance informationYounes Abouyaalaenergy_progress
09/30/2021HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/30/2021HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/30/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/24/2021Sprinkler SystemsYounes Abouyaalaspecial
08/24/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/20/2021HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
08/20/2021HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/20/2021Maintenance informationYounes Abouyaalaenergy_progress
08/20/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/20/2021Sprinkler SystemsYounes Abouyaalaspecial
08/20/2021HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
08/20/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/20/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
08/20/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/11/2021FinalRAFI HAMIDprogress
06/14/2021FinalRAFI HAMIDprogress
04/30/2021FinalNAVEEN KUMARprogress
04/30/2021Structural Steel - DetailsYounes Abouyaalaspecial
04/30/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/30/2021MasonryYounes Abouyaalaspecial
04/30/2021Structural Steel - WeldingYounes Abouyaalaspecial
Latest 25 of 37.
▾Documents — 181 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch10
09/01/2026B00489700-P3Request digital key ↗
09/01/2026B00489700-P1Request digital key ↗
09/01/2026B00489700-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/01/2026B00447602-P1Request digital key ↗
09/01/2026B00447602-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation1
08/14/2026B00451533-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
08/14/2026B00451533-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00451533-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION25
02/11/2022340780033Open ↗
02/09/2022340780033Open ↗
11/24/2021340780033Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION6
07/15/2021340780033Open ↗
06/04/2021340780033Open ↗
05/27/2021340780033Open ↗
Showing 3 of 6 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/11/2021340780033Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/25/2021340813347Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/02/2021340780033Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/11/2021340780033Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
02/11/2022340780033Open ↗
02/26/2021340780033Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026B00451533-S2Open ↗
08/14/2026B00451533-S1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/12/2021340780033Open ↗
▸BISVERIFY TAX LOT1
08/19/2021340780033Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/19/2021340780033Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/12/2021340780033Open ↗
▸Seals & Professional Certifications52
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026B00447602-P1Open ↗
09/02/2026B00447602-P1Open ↗
08/28/2026B00493119-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026B00489700-I1Open ↗
08/30/2026B00524400-I1Open ↗
08/29/2026B00451533-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00451533-I1Open ↗
09/01/2026B00451533-S1Open ↗
09/01/2026B00451533-S2Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/01/2021340813347Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/01/2021340813347Open ↗
▸Trade Schedules & Equipment2
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
01/28/2021340780033Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/1
02/11/2022340780033Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
08/25/2021340813347Open ↗
01/28/2021340780033Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/25/2021340813347Open ↗
▸BISSTREET TREE SIGNOFF1
11/25/2021340780033Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/26/2021340780033Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00493119-P2Open ↗
09/01/2026B00447602-I1Open ↗
09/01/2026B00447602-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/12/2021340780033Open ↗
01/28/2021340780033Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/19/2021340780033Open ↗
07/12/2021340780033Open ↗
01/28/2021340780033Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026B00493119-I1Open ↗
08/13/2026B00509250-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/19/2021340780033Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/19/2021340780033Open ↗
07/12/2021340780033Open ↗
02/26/2021340780033Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/14/2026B00451533-S2Open ↗
08/14/2026B00451533-S1Open ↗
▸DOB NOWTR4 Plot Diagram2
08/14/2026B00451533-S2Open ↗
08/14/2026B00451533-S1Open ↗
▸DOB NOWSOIL REPORT2
08/14/2026B00451533-S2Open ↗
08/14/2026B00451533-S1Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE8
10/27/2021340780033Open ↗
10/26/2021340780033Open ↗
05/24/2021340780033Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/25/2022340780033Open ↗
05/27/2021340780033Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/24/2021340813347Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT (FINAL): PW31
11/25/2021340780033Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
02/26/2021340780033Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/15/2021340780033Open ↗
▸BISCOST AFFIDAVIT1
03/04/2022340780033Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION8
03/07/2022340780033Open ↗
02/11/2022340780033Open ↗
12/10/2021340780033Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/01/2021340813347Open ↗
▸Other Documents14
▸BISBPP - SUPPORTING DOCUMENTATION4
09/14/2021340813347Open ↗
09/14/2021340813347Open ↗
08/25/2021340813347Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/31/2022340780033Open ↗
01/31/2022340780033Open ↗
02/12/2021340780033Open ↗
▸BISTCO - Supporting Documents2
01/31/2022340780033Open ↗
01/31/2022340780033Open ↗
▸DOB NOWPlot Diagram2
08/14/2026B00451533-S2Open ↗
08/14/2026B00451533-S1Open ↗
▸BISPLOT DIAGRAM1
01/28/2021340780033Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
01/28/2021340780033Open ↗
▸DOB NOWAdjoining Owners Notification1
08/14/2026B00451533-S2Open ↗