| Owner | Filings | Most Recent |
|---|---|---|
| ROYAL REALTY | 25 | 09/17/2026 |
| DURST ORGANIZATION | 313 | 09/13/2026 |
| SKYLINE SCAFFOLDING GROUP | 4 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | 9 | 03/22/2026 |
| DOLP 1133 PROPERTIES II | 1,460 | 03/22/2026 |
| DOLP PROPERTIES LLC | 1 | 03/22/2026 |
| CENTRAL PARKING SYSTEM | 4 | 03/22/2026 |
| 1133 PROPERTIES LLC. | 1 | 03/22/2026 |
| ROCKLEDER SCAFFOLD CORP | 2 | 03/22/2026 |
| 1120 AVE OF AMERICA ASSOC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| STUDIOS ARCHITECTURE | 2 | 08/24/2026 |
| JACK STONE ENGINEERS, PC | 2 | 08/07/2026 |
| WARE MALCOMB | 1 | 07/30/2026 |
| GENSLER | 7 | 07/22/2026 |
| ROBERT DERECTOR ASSOCIATES | 10 | 07/15/2026 |
| ME ENGINEERS | 5 | 04/09/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 2 | 04/08/2026 |
| MG ENGINEERING D.P.C. | 36 | 03/02/2026 |
| SEVERUD ASSOCIATES | 4 | 03/02/2026 |
| AMA CONSULTING ENGINEERS, PC | 3 | 03/02/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 02/27/2026 |
| TPG ARCHITECTURE, LLP | 4 | 01/30/2026 |
| ARCARI + IOVINO ARCHITECTS | 1 | 09/30/2025 |
| DESIGN REPUBLIC | 3 | 07/14/2025 |
| HOFFMANN ARCHITECTS, INC. | 4 | 10/30/2024 |
| FREDERICK HOAG | 1 | 07/02/2024 |
| MONTROY ARCHITECTURE PLLC | 4 | 04/23/2024 |
| STUDIO HUJI | 2 | 03/22/2024 |
| CAESAR BUSTAMANTE, AIA | 1 | 11/02/2023 |
| POWER CONTINUUM ENGINEERING, DPC | 1 | 06/09/2023 |
| JAROS BAUM & BOLLES | 6 | 02/16/2022 |
| ENV ARCHITECTS, DPC | 1 | 08/09/2021 |
| TOHFAZ UDDIN PE PC | 2 | 03/03/2021 |
| R.G. VANDERWEIL ENGINEERS, PC | 3 | 01/06/2021 |
| FISKAA ENGINEERING | 2 | 09/30/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 136 | 03/21/2026 |
| NH EXPEDITING AND CONSULTING LLC | 4 | 03/21/2026 |
| JM ZONING, LLC. | 4 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 18 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 16 | 03/21/2026 |
| DVA Advisors | 2 | 03/21/2026 |
| KAZAM CONSULTANTS | 4 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 4 | 03/21/2026 |
| CAESAR BUSTAMANTE, AIA | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CLUNE CONSTRUCTION CO LP | General Contractor | 31 | 08/14/2026 |
| JOHN GALLIN & SON, INC | General Contractor | 19 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 7 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 7 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 6 | 03/21/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 6 | 07/08/2026 |
| SPK/LEWIS CONSTRUCTION LL | General Contractor | 6 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 6 | 03/21/2026 |
| ROBERT PESTONE | Electrical | 3 | 03/21/2026 |
| A&A PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| KG SPRINKLER CORP | Fire Protection | 3 | 07/08/2026 |
| CELTIC SERVICES NYC INC | General Contractor | 3 | 07/08/2026 |
| THE GRENADIER CORPORATION | General Contractor | 3 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 3 | 07/08/2026 |
| CHARLES RANELLO | Electrical | 3 | 03/21/2026 |
| SKYLINE SCAFFOLDING GROUP | General Contractor | 2 | 07/08/2026 |
| SHIMIZU NORTH AMERICA LLC | General Contractor | 2 | 04/09/2026 |
| ABCO-PEERLESS SPRKLR | Plumbing | 2 | 03/22/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 2 | 07/08/2026 |
| HENEGAN CONSTRUCTION CO., | General Contractor | 2 | 03/21/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 2 | 07/08/2026 |
| A PLUS PLUMBING CORP | Fire Protection | 2 | 06/28/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 2 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 2 | 04/09/2026 |
| CONCEPT CONSTRUCTION SERV | General Contractor | 2 | 08/04/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| JL SPECIAL INSPECTIONS LL | 9500 | 3 | 08/07/2026 |
| AK ENGINEERING PC | 678 | 6 | 07/22/2026 |
| PROJECT TACTICAL SOLUTION | 5859 | 55 | 07/15/2026 |
| CONSULTING AND TESTING SE | 6152 | 2 | 07/14/2025 |
| COLE TECHNOLOGIES/CONTROL | 1290 | 4 | 10/30/2024 |
| MILROSE CONSULTANTS LLC | 2003 | 10 | 08/16/2024 |
| HRF SERVICES CORP | 5616 | 1 | 03/22/2024 |
| PROJECTIVE INC. | 6820 | 1 | 06/09/2023 |
| NEW AGE ENGINEERING PLLC | 7746 | 1 | 04/26/2022 |
| MEP INSPECTIONS, INC | 1102 | 3 | 02/01/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/13/2026 |
| DOB NOW | Structural | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | S. TIEGER PLBG. CO., INC | 08/07/2026 |
| DOB NOW | Mechanical Systems | Signed-off | CONCEPT CONSTRUCTION SERV | 08/03/2026 |
| DOB NOW | General Construction | Signed-off | CONCEPT CONSTRUCTION SERV | 08/03/2026 |
| DOB NOW | General Construction | Signed-off | CELTIC SERVICES NYC INC | 06/29/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/14/2026 |
| DOB NOW | General Construction | Permit Issued | CELTIC SERVICES NYC INC | 05/11/2026 |
| DOB NOW | General Construction | Permit Issued | CELTIC SERVICES NYC INC | 04/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | A PLUS PLUMBING CORP | 04/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | LAWRENCE J. LEVINE | 03/31/2026 |
| DOB NOW | Sprinklers | Signed-off | A PLUS PLUMBING CORP | 03/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MARLIN MECHANICAL INC | 03/25/2026 |
| DOB NOW | General Construction | Permit Issued | BENCHMARK BUILDERS LLC | 03/11/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 03/05/2026 |
| DOB NOW | Structural | Signed-off | BENCHMARK BUILDERS LLC | 03/04/2026 |
| DOB NOW | Structural | Permit Issued | CLUNE CONSTRUCTION CO LP | 03/03/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SKYLINE SCAFFOLDING GROUP | 03/02/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 02/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 02/10/2026 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 02/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 02/03/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SPK/LEWIS CONSTRUCTION LL | 11/24/2025 |
| DOB NOW | General Construction | Signed-off | SPK/LEWIS CONSTRUCTION LL | 11/24/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 10/20/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 10/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SHIMIZU NORTH AMERICA LLC | 10/02/2025 |
| DOB NOW | General Construction | Signed-off | SHIMIZU NORTH AMERICA LLC | 10/02/2025 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 08/25/2025 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 07/22/2025 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 07/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SPK/LEWIS CONSTRUCTION LL | 07/16/2025 |
| DOB NOW | General Construction | Signed-off | SPK/LEWIS CONSTRUCTION LL | 07/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 06/20/2025 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 06/18/2025 |
| DOB NOW | Structural | Permit Issued | CLUNE CONSTRUCTION CO LP | 06/18/2025 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 05/02/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 05/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 04/29/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/02/2026 | Permit Issued | MARLIN MECHANICAL INC | Air Conditioning Systems | Cooling Water Furnace V3AH030B 27,400 BTU · Packaged Unit ×2 V3AH018B 17,000 BTU · Packaged Unit ×1 V7AH036B 26,100 BTU · Crac Unit ×1 |
| 06/12/2025 | Permit Issued | CLUNE CONSTRUCTION CO LP | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | — | — | 4 heads |
| 04/09/2026 | Permit Issued | A PLUS PLUMBING CORP | Sprinkler System |
| 03/04/2026 | Signed-off | A PLUS PLUMBING CORP | Sprinkler System |
| 06/12/2025 | Permit Issued | KG SPRINKLER CORP | 366 heads |
| 10/24/2019 | — | — | 1 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Permit Issued | DENKO MECHANICAL INC | — |
| 07/15/2026 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 03/02/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/15/2026 | Permit Issued | M.C. ELECTRICAL NY INC | General Wiring |
| 04/17/2026 | Permit Issued | M.C. ELECTRICAL NY INC | General Wiring |
| 03/12/2026 | Permit Issued | ROCKMOR ELEC. ENTERPR INC | General Wiring |
| 11/06/2025 | Complete | RONAN ELECTRICAL LLC | General Wiring |
| 08/15/2025 | Complete | M.C. ELECTRICAL NY INC | General Wiring |
| 08/11/2025 | Complete | FRED GELLER ELEC'L INC. | General Wiring |
| 07/15/2024 | Complete | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 05/01/2024 | Complete | M.C. ELECTRICAL NY INC | General Wiring |
| 09/25/2023 | Complete | M.C. ELECTRICAL NY INC | General Wiring |
| 06/08/2023 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| 07/07/2022 | Complete | SRM ELECTRICAL SVC INC | — |
| 06/06/2022 | Permit Issued | P.E. STONE INC | General Wiring |
| 02/23/2022 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 02/17/2022 | Complete | SRM ELECTRICAL SVC INC | — |
| 02/10/2022 | Permit Issued | JRD ELECTRIC CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | Signed-off | CONCEPT CONSTRUCTION SERV | 1 scope_items |
| 03/02/2026 | Permit Issued | PAR PLUMBING CO., INC | 1 scope_items |
| 06/12/2025 | Permit Issued | CLUNE CONSTRUCTION CO LP | Steel |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/10/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/05/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/05/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/26/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 05/18/2026 | Fail-Final PL - Up to 9 Requested Floors | Fail | View ↗ |
| 04/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/06/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/31/2026 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 03/31/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/26/2026 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 03/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/05/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/08/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/16/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/01/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/01/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/23/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/23/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 07/23/2026 | Final | Stephanie Lan | progress |
| 07/21/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | Max Lee | special |
| 07/21/2026 | Post-installed Anchors | Max Lee | special |
| 07/21/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 07/21/2026 | Final | Stephanie Lan | progress |
| 07/15/2026 | Fire-Resistant Penetrations and Joints | Max Lee | special |
| 07/15/2026 | Post-installed Anchors | Max Lee | special |
| 07/02/2026 | Fire-Resistant Penetrations and Joints | Joshua Lowrance | special |
| 07/02/2026 | Final | Joshua Lowrance | progress |
| 07/02/2026 | Sprinkler Systems | Joshua Lowrance | special |
| 03/31/2026 | Final | Max Lee | progress |
| 03/31/2026 | Post-installed Anchors | Max Lee | special |
| 03/31/2026 | Fire-Resistant Penetrations and Joints | Max Lee | special |
| 03/31/2026 | Sprinkler Systems | Max Lee | special |
| 03/31/2026 | Fire-Resistant Penetrations and Joints | Max Lee | special |
| 03/03/2026 | Interior lighting power | Max Lee | energy_progress |
| 03/03/2026 | Lighting controls | Max Lee | energy_progress |
| 03/03/2026 | Energy Code Compliance Inspections | Max Lee | progress |
| 03/03/2026 | Final | Max Lee | progress |
| 03/03/2026 | Mechanical Systems | Max Lee | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| ING | Office | Floors 10, 11 | Project M01351499 |
| Steptoe | Office | Floors 43–45 | Project M01344161 Project M01344177 Project M01344185 Project M01344197 |
| Chiba Bank | Office | Floor 15 | Project M01287117 |
| LPL Financial | Office | Floors 33–35 | Project M01229658 Project M01229684 Project M01229692 Project M01232708 |
| Interactive Brokers | Office | Floors 35, 36 | Project M01071305 Project M00882332 |
| Take-Two Interactive Software | Office | Floor 2 | Project M00921247 |
| HSBC | Office | Floor 1 | Project M00264004 |
| Steinway & Sons | Retail | Floor 1 | Project M00122754 |