← Back
Walk-up apt, over six families with stores
1135 HOE AVENUE
BRONX · BIN 2006069
💬 Discuss this project
1925Year Built
6Stories
C7Building Class
R7-1Zoning
25,254 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized14 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 1613 REALTY, LTD. · 5,000 sf lot · 5.05 FAR built · Flood zone X
Locations of Work
PlumbingGeneral
Roof2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXCLUSIVE REALTY3507/08/2026
APEX GROUP NY407/08/2026
TOTAL NY CONSTRUCTION1607/08/2026
1613 REALTY703/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)803/21/2026
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
SANDEEP KAUR603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOTAL NY CONSTRUCTION CORPGeneral Contractor707/08/2026
WARD PLUMBING CORPPlumbing607/08/2026
NATIONWIDE MECHANICAL INCPlumbing307/08/2026
STEAMFITTERSElectrical203/21/2026
CRUZ, GEORGEElectrical203/21/2026
APEX GROUP NY CORPGeneral Contractor107/08/2026
L J ELEC'L SERV. INC.Electrical103/22/2026
ALEXANDER EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEDER-LUIS ARCHITECTURAL1553808/17/2022
NEW YORK ENGINEERING ASSO851112/07/2021
AP PROFESSIONAL ENGINEERI5974211/23/2021
Building Lifecycle
All (123)Filed (17)Permit Issued (11)Signed Off (6)Violation (60)Inspection (6)Objection (8)Special Inspection (15)
08/05/2026
Violation issued (ECB, open)
Plumbing
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
C
11/23/2025
Violation issued (HPD, open)
B
11/23/2025
Violation issued (HPD, open)
A
11/23/2025
Violation issued (HPD, open)
B
11/23/2025
Violation issued (HPD, open)
B
11/25/2024
Violation issued (FDNY_ORDER, closed)
05/21/2024
Signed off — Alteration
X01017538-I1
04/16/2024
Violation issued (FDNY_ORDER, closed)
04/16/2024
Violation issued (FDNY_ORDER, closed)
03/11/2024
Filed — Alteration
X01017538-I1
03/11/2024
Permit issued — Sidewalk Shed
X01017538-I1-SH
12/07/2023
Violation issued (HPD, closed)
C
12/07/2023
Violation issued (HPD, closed)
C
12/07/2023
Violation issued (HPD, closed)
C
12/07/2023
Violation issued (HPD, closed)
C
11/15/2023
Violation issued (HPD, open)
C
10/25/2023
Violation issued (HPD, closed)
I
10/06/2023
Violation issued (HPD, closed)
C
10/06/2023
Violation issued (HPD, closed)
C
10/06/2023
Violation issued (HPD, closed)
C
10/06/2023
Violation issued (HPD, closed)
C
10/06/2023
Violation issued (HPD, closed)
C
10/06/2023
Violation issued (HPD, closed)
C
10/06/2023
Violation issued (HPD, closed)
C
06/13/2023
Violation issued (ECB, closed)
Construction
06/13/2023
Violation issued (ECB, closed)
Construction
02/11/2023
Violation issued (HPD, closed)
C
01/18/2023
Signed off — Alteration
X00537033-I1
01/13/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/11/2022
Signed off — Alteration
Replace water piping and plumbing fixtures,Gas repipe entire builidng, Remove meters from aparments and install new gas meters in cellar and incorporate allwork filed under LAA Application # X00400071 and X00420466.
X00318709-I1
08/17/2022
Filed — Alteration
Replace water piping and plumbing fixtures,Gas repipe entire builidng, Remove meters from aparments and install new gas meters in cellar and incorporate allwork filed under LAA Application # X00400071 and X00420466.
X00318709-A1
08/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/2022
Objection resolved — Addressed
07/22/2022
Objection raised — Scope
07/21/2022
Filed — Alteration
Replace water piping and plumbing fixtures,Gas repipe entire builidng, Remove meters from aparments and install new gas meters in cellar and incorporate allwork filed under LAA Application # X00400071 and X00420466.
X00318709-P9
07/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
07/07/2022
Filed — Alteration
Replace water piping and plumbing fixtures,Gas repipe entire builidng, Remove meters from aparments and install new gas meters in cellar and incorporate allwork filed under LAA Application # X00400071 and X00420466.
X00318709-P8
06/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
06/08/2022
Permit issued — Plumbing
X00318709-I1-PL
05/18/2022
Filed — Alteration
Replace water piping and plumbing fixtures,Gas repipe entire builidng, Remove meters from aparments and install new gas meters in cellar and incorporate allwork filed under LAA Application # X00400071 and X00420466.
X00318709-P7
05/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julio Leder-Luis
04/18/2022
Objection resolved — Addressed
04/11/2022
Signed off — Alteration
REPLACE GAS BOILER WITH BOILER AND GAS BURNER.
X00633780-I1
04/11/2022
Signed off — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER/BURNER. CAP AND REMOVE GAS WATER HEATER AND HOT WATER STORAGE TANK.
X00633818-I1
04/04/2022
Objection raised — Other
04/01/2022
Filed — Alteration
Replace water piping and plumbing fixtures,Gas repipe entire builidng, Remove meters from aparments and install new gas meters in cellar and incorporate allwork filed under LAA Application # X00400071 and X00420466.
X00318709-P6
03/24/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/22/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/10/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
X00383466-I1
03/07/2022
Permit issued — Sidewalk Shed
X00383466-I1-SH
03/04/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
X00383466-P2
02/22/2022
Filed — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BOILER/BURNER. CAP AND REMOVE GAS WATER HEATER AND HOT WATER STORAGE TANK.
X00633818-P1
02/22/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
02/10/2022
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
02/10/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP03/11/2024
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC06/08/2022
DOB NOWSidewalk ShedSigned-offTOTAL NY CONSTRUCTION COR03/07/2022
DOB NOWPlumbingSigned-offWARD PLUMBING CORP01/28/2022
DOB NOWBoiler EquipmentSigned-offWARD PLUMBING CORP01/28/2022
DOB NOWPlumbingSigned-offWARD PLUMBING CORP12/14/2021
DOB NOWBoiler EquipmentSigned-offWARD PLUMBING CORP12/14/2021
DOB NOWGeneral ConstructionSigned-offTOTAL NY CONSTRUCTION COR07/18/2021
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC07/01/2021
DOB NOWSidewalk ShedSigned-offTOTAL NY CONSTRUCTION COR08/17/2020
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC07/09/2020
BISOTISSUEDCDC DEVELOPMENT INC07/08/2020
BISOTISSUEDRICKY & BROS CONSTRUCT IN07/02/2009
BISEQISSUEDRICKY & BROS CONSTRUCT IN07/02/2009
BISEQISSUEDJ & K CONSTRUCTION CONSULTANT05/31/2001
BISBLISSUEDWARD MECHANICAL04/03/1990
4 projects · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024CompleteHIGH QUALITY ELECTRIC OF—
11/05/2021Permit IssuedMONTE ELECTRIC CO.—
09/22/2020CompleteL J ELEC'L SERV. INC.General Wiring
08/12/2020Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/24/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/22/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/10/2022Fail-Final Boiler Equipment InspectionFailView ↗
02/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/08/2022Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
07/12/2022Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
06/15/2022Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
05/16/2022Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
02/22/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
02/10/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
11/18/2021Maintenance informationLOUIS ARENAenergy_progress
11/18/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/18/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/18/2021Heating SystemsLOUIS ARENAspecial
11/01/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
10/01/2021MasonryGURVINDER SINGHspecial
10/01/2021FinalGURVINDER SINGHprogress
10/01/2021Structural Stability – Alterations of existing buildingsGURVINDER SINGHspecial
03/22/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch - Plumbing8
08/25/2026X00318709-I1Request digital key ↗
08/25/2026X00318709-P7Request digital key ↗
08/25/2026X00318709-A1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch6
08/25/2026X00537033-I1Request digital key ↗
08/25/2026X00537033-P1Request digital key ↗
08/25/2026X00633818-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/26/2026X00383466-P1Request digital key ↗
08/26/2026X00383466-I1Request digital key ↗
08/15/2026X00383466-P2Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
03/18/2020220725687Open ↗
03/10/2020220725687Open ↗
03/10/2020220725687Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
07/08/2020220725687Open ↗
07/07/2009220016042Open ↗
07/07/2009220016863Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/26/2026X00383466-P2Open ↗
08/26/2026X00383466-P1Open ↗
08/26/2026X00383466-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026X00633780-I1Open ↗
08/29/2026X00318709-P9Open ↗
08/26/2026X00318709-A1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X00633780-I1Open ↗
09/23/2026X00633780-I1Open ↗
09/23/2026X00633780-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/18/2020220725687Open ↗
11/13/2009220016042Open ↗
11/13/2009220016863Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/02/2009220016863Open ↗
06/30/2009220016042Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/02/2009220016863Open ↗
06/30/2009220016042Open ↗
▸Safety & Tenant Protection13
▸DOB NOWTenant Protection Plan11
08/13/2026X00318709-P4Open ↗
08/13/2026X00318709-I1Open ↗
08/13/2026X00318709-A1Open ↗
Showing 3 of 11 on file for this type
▸BISSTREET TREE CHECKLIST1
02/10/2020220725687Open ↗
▸BISTenant Protection Plan and Notes1
03/18/2020220725687Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/25/2026X00318709-I1Open ↗
08/25/2026X00318709-P5Open ↗
08/25/2026X00318709-A1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
07/02/2009220016863Open ↗
06/30/2009220016042Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/18/2020220725687Open ↗
▸Energy Compliance10
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/26/2022220725687Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/18/2020220725687Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/26/2022220725687Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/26/2022220725687Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/26/2022220725687Open ↗
▸BISFENESTRATION AREAS1
09/26/2022220725687Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/26/2022220725687Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/26/2022220725687Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00633780-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00633780-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/26/2022220725687Open ↗
07/08/2020220725687Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/26/2022220725687Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/27/2022220725687Open ↗
11/13/2009220016042Open ↗
11/13/2009220016863Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/13/2009220016042Open ↗
11/13/2009220016863Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/02/2009220016863Open ↗
06/30/2009220016042Open ↗
▸BISFINAL1
09/26/2022220725687Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
02/10/2020220725687Open ↗
11/13/2009220016863Open ↗
07/02/2009220016863Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/12/2022220725687Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
02/10/2020220725687Open ↗
07/02/2009220016863Open ↗
06/30/2009220016042Open ↗