← Back
BuildNYC
Three families
1137 NOBLE AVENUE
BRONX · BIN 2024158
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R6Zoning
2,992 sfGross Floor Area
3Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸
Three families · 2,633 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarLegalize removed plumbing fixtures and basement layout3p · 2 filings · 8 docs
BasementLegalize removed plumbing fixtures and basement layout1p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ADH103/22/2026
Rodriguez103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates304/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HT Plumbing & HeatingPlumbing507/08/2026
N.Y. Concepts ComGeneral Contractor303/21/2026
Conde ElectricElectrical103/21/2026
Chen & Lin Arch Engineering ServicesElectrical103/21/2026
Empire Lic Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ramirez Engineering8679112/09/2024
Building Lifecycle
06/05/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/03/2025
Signed off — Alteration
NO CHANGE IN USE, EGRESS OR OCCUPANCY. LEGALIZE REMOVED PLUMBING FIXTURES, & BASEMENT LAYOUT. ALL WORK IN RESPONSE TO VIOLATION #34936964Y, & 34983958J.
X01046543-I1
05/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
35 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHT Plumbing & Heating05/13/2025
DOB NOWGeneral ConstructionSigned-offN.Y. Concepts Com08/27/2024
BISOTISSUEDSunpower Corporation, Systems02/10/2022
3 projects · most recent 09/30/2025
General Wiring
FiledStatusContractorScope
09/30/2025CompleteConde ElectricGeneral Wiring
05/08/2025Permit IssuedEmpire Lic Electrical ContractorsGeneral Wiring
07/27/2022Permit IssuedD.R.P. Electrical Contracting—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/18/2025Fire-Resistant Penetrations and JointsAmauris Ramirezspecial
12/20/2023FinalAmauris Ramirezprogress
75 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account