ECB07/25/2012FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. INSTALLATION OF PLUMBING MATERIALS. NOTED: A 3" WHITE PVC PIPE ROOTED FROM BLDG AT S/E CORNER OF PROPERTY IN DRIVEWAY TO CURB CONTINUOUSLY BAILING WATER INNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 4,336 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.