7 Open Violations 6 unresolved · 1 paperwork only▸
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
ECB05/17/2010PLUMBING WORK W.O PERMIT. NOTED: AT REAR YARD OF PREMISES NEWLY INSTALLED COPPER WATER LINES APPROX 100' FT ATTACHED INTO WALL OF ADJ STRUCTURE AND PVC PIPE INSTALLED INTO GROUND AT VARIOUS AREA IN YARD. DOB RENothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 1,862 sf lot · 1.74 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.