One story retail building
114-08 BEACH CHANNEL DRIVE
💬 Discuss this project
1950Year Built
1Stories
K1Building Class
C8-1Zoning
14,850 sfGross Floor Area
12Units
0 Open ViolationsFDNY Report ↗
One story retail building · 48,621 sf lot · 0.31 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Roof13p · 8 filings · 20 docs
Floor 15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEACH CHANNEL DRIVE REALTY13507/08/2026
WALTER T. GORMAN, P.E., P.C.907/08/2026
BEACH CHANNEL DR REALTY L103/22/2026
BPLI303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REVANS DESIGN PE PC312/23/2025
CHUN FENG, ARCHITECT608/08/2025
WALTER T. GORMAN, P.E., P.C.306/08/2021
MACIEJ FIUTAK107/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R GERMAIN603/21/2026
HIGH QUALITY 3381203/21/2026
WALTER T GORMAN PE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MALBRO CONST SERVICES INCGeneral Contractor2207/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor307/08/2026
LEONID ARLYUKElectrical203/21/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REVANS DESIGN PE PC4617312/23/2025
NKM ENGINEERING PLLC6244408/08/2025
SQ. ARCH, LLC4802608/08/2025
WALTER T. GORMAN, P.E., P268306/08/2021
Building Lifecycle
All (101)Filed (13)Permit Issued (16)Signed Off (3)Violation (30)Inspection (5)Objection (4)Special Inspection (30)
02/21/2026
Violation issued (FDNY_NOV, closed)
12/24/2025
Signed off — Alteration
REPLACE (1) NEW 5 TON HVAC SYSTEM ON ROOF. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
Q01221172-I1
12/24/2025
Special inspection requirement — Mechanical Systems
PAUL REVANS
12/24/2025
Special inspection requirement — Final
PAUL REVANS
12/23/2025
Filed — Alteration
REPLACE (1) NEW 5 TON HVAC SYSTEM ON ROOF. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
Q01221172-P1
12/16/2025
Signed off — Alteration
INSTALL NEW SPLIT SYSTEM FOR COMMERCIAL SPACE. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
Q01221175-I1
12/14/2025
Special inspection requirement — Mechanical Systems
PAUL REVANS
12/14/2025
Special inspection requirement — Final
PAUL REVANS
11/07/2025
Permit issued — Mechanical Systems
Q01221172-I1-MS
10/02/2025
Signed off — Alteration
RENOVATION OF PROPOSED NAIL/FACIAL SPA WITH, RELOCATE SPRINKLER HEAD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169295-S1
09/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2025
Special inspection requirement — Fenestration areas
Chun Feng
08/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Chun Feng
08/11/2025
Special inspection requirement — Interior lighting power
Chun Feng
08/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Chun Feng
08/11/2025
Special inspection requirement — Fenestration air leakage
Chun Feng
08/11/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
08/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Chun Feng
08/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Chun Feng
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Chun Feng
08/11/2025
Special inspection requirement — Final
Chun Feng
08/11/2025
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
08/11/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Chun Feng
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
08/08/2025
Filed — Alteration
RENOVATION OF PROPOSED NAIL/FACIAL SPA WITH, RELOCATE SPRINKLER HEAD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169295-P3
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
08/07/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Chun Feng
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
08/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
08/07/2025
Special inspection requirement — Fenestration air leakage
Chun Feng
08/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Chun Feng
08/07/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
08/07/2025
Special inspection requirement — Fenestration areas
Chun Feng
08/07/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Chun Feng
08/07/2025
Special inspection requirement — Sprinkler Systems
NARESH MAHANGU
08/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
08/06/2025
Filed — Alteration
RENOVATION OF PROPOSED NAIL/FACIAL SPA WITH, RELOCATE SPRINKLER HEAD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169295-P1
08/06/2025
Filed — Alteration
RENOVATION OF PROPOSED NAIL/FACIAL SPA WITH, RELOCATE SPRINKLER HEAD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169295-P2
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
07/21/2025
Permit issued — Mechanical Systems
Q01221175-I1-MS
05/12/2025
Filed — Alteration
REPLACE (1) NEW 5 TON HVAC SYSTEM ON ROOF. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
Q01221172-I1
05/12/2025
Filed — Alteration
INSTALL NEW SPLIT SYSTEM FOR COMMERCIAL SPACE. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
Q01221175-I1
03/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/31/2025
Permit issued — Plumbing
Q01169295-S1-PL
01/31/2025
Permit issued — Sprinklers
Q01169295-S2-EW-SP
01/31/2025
Permit issued — Mechanical Systems
Q01169295-I1-GC
01/30/2025
Permit issued — General Construction
Q01169295-I1-MS
01/24/2025
Filed — Alteration
RENOVATION OF PROPOSED NAIL/FACIAL SPA WITH, RELOCATE SPRINKLER HEAD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169295-S1
01/24/2025
Filed — Alteration
RENOVATION OF PROPOSED NAIL/FACIAL SPA WITH, RELOCATE SPRINKLER HEAD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169295-S2
01/21/2025
Filed — Alteration
RENOVATION OF PROPOSED NAIL/FACIAL SPA WITH, RELOCATE SPRINKLER HEAD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169295-I1
10/26/2024
Violation issued (FDNY_NOV, closed)
03/21/2024
Violation issued (FDNY_NOV, closed)
04/26/2022
Permit issued — Mechanical Systems
Q00524680-I1-MS
04/26/2022
Permit issued — General Construction
Q00521745-I1-GC
04/14/2022
Violation issued (FDNY_NOV, closed)
07/12/2021
Permit issued — General Construction
Q00521745-I1-GC
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMALBRO CONST SERVICES INC11/07/2025
DOB NOWMechanical SystemsSigned-offMALBRO CONST SERVICES INC07/21/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.01/31/2025
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN01/31/2025
DOB NOWMechanical SystemsPermit IssuedHIGH QUALITY CONSTRUCTION01/31/2025
DOB NOWGeneral ConstructionPermit IssuedHIGH QUALITY CONSTRUCTION01/30/2025
DOB NOWMechanical SystemsPermit IssuedMALBRO CONST SERVICES INC04/26/2022
DOB NOWGeneral ConstructionPermit IssuedMALBRO CONST SERVICES INC04/26/2022
DOB NOWGeneral ConstructionPermit IssuedMALBRO CONST SERVICES INC07/12/2021
DOB NOWMechanical SystemsPermit IssuedMALBRO CONST SERVICES INC06/25/2021
DOB NOWMechanical SystemsPermit IssuedMALBRO CONST SERVICES INC06/17/2021
DOB NOWGeneral ConstructionPermit IssuedMALBRO CONST SERVICES INC05/17/2021
DOB NOWMechanical SystemsPermit IssuedMALBRO CONST SERVICES INC04/14/2021
DOB NOWMechanical SystemsPermit IssuedMALBRO CONST SERVICES INC03/25/2021
DOB NOWMechanical SystemsPermit IssuedMALBRO CONST SERVICES INC09/05/2019
DOB NOWMechanical SystemsPermit IssuedMALBRO CONST SERVICES INC07/28/2019
BISMHISSUEDVINO CONSTRUCTION INC12/13/2019
BISSPISSUEDHF GROUP PLMBG & SPNKLER11/14/2018
BISPLISSUEDSMART PLBG & HTG CORP11/14/2018
BISPLISSUEDMCMANUS MECH MAINT P&H INC10/22/2018
BISOTISSUEDMALBRO CONST SERVICES INC09/13/2018
BISOTISSUEDNYC DAYLIGHTING INC07/27/2018
BISOTISSUEDNYC DAYLIGHTING INC11/03/2017
BISPLISSUEDMCMANUS MECH MAINT P&H INC07/25/2017
BISMHISSUEDMALBRO CONST SERVICES INC05/15/2017
BISOTISSUEDMALBRO CONST SERVICES INC09/28/2016
BISMHISSUEDMALBRO CONST SERVICES INC06/02/2016
BISPLISSUEDMCMANUS MECH MAINT P&H INC05/20/2015
BISOTISSUEDG & L CONSTRUCTION INC04/23/2015
BISPLISSUEDMCMANUS MECH MAINT P&H INC03/04/2015
BISMHISSUEDMALBRO CONST SERVICES INC02/18/2015
BISOTISSUEDG & L CONSTRUCTION INC11/20/2014
BISMHISSUEDMALBRO CONST SERVICES INC10/15/2014
BIS—ISSUEDFIVE TOWN NEON SIGN CO IN12/31/2013
BIS—ISSUEDFIVE TOWN NEON SIGN CO IN04/25/2013
BISOTISSUEDNORTH AMERICAN CONTRACTIN01/04/2013
BISPLISSUEDH BRONNER & SON PLBG & HTG03/01/2012
BISSPISSUEDVIP FIRE SPRINKLER INC02/02/2012
BISPLISSUEDH BRONNER & SON PLBG & HTG02/02/2012
BISPLISSUEDMCMANUS MECH MAINT P&H INC02/01/2012
+ 26 more permits on file
3 projects · most recent 08/08/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/08/2025Permit IssuedHIGH QUALITY CONSTRUCTIONAir Conditioning Systems, Ventilation Systems
Cooling
Lg KUMXB361A 36,000 BTU · Vrf Outdoor ×2
KUMXB541A 54,000 BTU · Rooftop Unit ×2
06/08/2021Permit IssuedMALBRO CONST SERVICES INCAir Conditioning Systems, Heating Systems
Cooling
Fujitsu ASU36RLXB 33,000 BTU · Ahu ×1
Heating
Fujitsu AOU36RLXB 33,000 BTU · Heat Pump Outdoor ×1
01/24/2020Permit IssuedMALBRO CONST SERVICES INCAir Conditioning Systems, Heating Systems
Cooling
Fujitsu ASU38CLX1 33,000 BTU ×1
Heating
Fujitsu AOU36CLX1 33,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 08/08/2025
Sprinkler System
FiledStatusContractorScope
08/08/2025Signed-offAMERICAN STANDARD PLUMBINSprinkler System
1 project · most recent 08/08/2025
Water/Sanitary
FiledStatusContractorScope
08/08/2025Signed-offAMERICAN STANDARD P&H CORWater/Sanitary
2 projects · most recent 02/12/2025
General Wiring
FiledStatusContractorScope
02/12/2025Permit IssuedE D ELECTRICAL INCGeneral Wiring
11/16/2018CompleteENTERPRISES ELECTR CONTRGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
12/24/2025Mechanical SystemsPAUL REVANSspecial
12/24/2025FinalPAUL REVANSprogress
12/14/2025Mechanical SystemsPAUL REVANSspecial
12/14/2025FinalPAUL REVANSprogress
08/11/2025Fenestration areasChun Fengenergy_progress
08/11/2025HVAC-R and service water piping design and insulationChun Fengenergy_progress
08/11/2025Interior lighting powerChun Fengenergy_progress
08/11/2025HVAC-R and service water heating equipmentChun Fengenergy_progress
08/11/2025Fenestration air leakageChun Fengenergy_progress
08/11/2025Air barrier - visual inspectionChun Fengenergy_progress
08/11/2025HVAC-R and service water heating system controlsChun Fengenergy_progress
08/11/2025Fenestration and door U-factor and product ratingsChun Fengenergy_progress
08/11/2025Energy Code Compliance InspectionsChun Fengprogress
08/11/2025Fire-Resistance Rated ConstructionChun Fengprogress
08/11/2025FinalChun Fengprogress
08/11/2025Mechanical SystemsNARESH MAHANGUspecial
08/11/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Chun Fengspecial
08/11/2025Fire-Resistant Penetrations and JointsChun Fengspecial
08/07/2025Fire-Resistant Penetrations and JointsChun Fengspecial
08/07/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Chun Fengspecial
08/07/2025Fire-Resistant Penetrations and JointsChun Fengspecial
08/07/2025Energy Code Compliance InspectionsChun Fengprogress
08/07/2025Fenestration air leakageChun Fengenergy_progress
08/07/2025Fenestration and door U-factor and product ratingsChun Fengenergy_progress
08/07/2025Air barrier - visual inspectionChun Fengenergy_progress
Latest 25 of 52.
▾Documents — 613 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch11
08/27/2026Q00521745-I1Request digital key ↗
08/27/2026Q00524680-I1Request digital key ↗
08/20/2026Q01221175-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00192275-I1Request digital key ↗
08/14/2026Q00301374-I1Request digital key ↗
▸Applications & Permits119
▸BISWORK PERMIT APPLICATION72
12/19/2019421670472Open ↗
12/01/2018421670472Open ↗
11/19/2018421670472Open ↗
Showing 3 of 72 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION47
07/29/2019440176168Open ↗
06/12/2019421723308Open ↗
10/25/2018421670472Open ↗
Showing 3 of 47 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION2
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications158
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION64
02/14/2020421670472Open ↗
01/14/2020421670472Open ↗
12/05/2019421660553Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026Q00524680-I1Open ↗
09/01/2026Q00524680-I1Open ↗
09/01/2026Q00524680-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/01/2026Q01221172-I1Open ↗
09/01/2026Q00524680-I1Open ↗
09/01/2026Q01169295-S1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
04/17/2013420831960Open ↗
01/22/2013420803722Open ↗
Showing 2 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
10/25/2018421670472Open ↗
04/17/2013420831960Open ↗
01/22/2013420803722Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00192275-I1Open ↗
08/28/2026Q00301374-I1Open ↗
08/20/2026Q01221175-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
10/25/2018421670472Open ↗
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
11/20/2014440184756Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
11/20/2014440184756Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment70
▸BISSELF-CERT PLUMBING NOTICE30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING18
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
Showing 2 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS8
08/01/2019440176168Open ↗
08/01/2019440176168Open ↗
02/26/2018421426898Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
08/01/2019440176168Open ↗
02/26/2018421426898Open ↗
Showing 2 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
05/09/2013420257830Open ↗
05/01/2013420557301Open ↗
04/19/2013420557301Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/25/2018421670472Open ↗
10/25/2018421660553Open ↗
03/10/2017421426898Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/20/2026Q01221175-I1Open ↗
08/19/2026Q01169295-I1Open ↗
08/19/2026Q01169295-S2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
10/25/2018421670472Open ↗
10/25/2018421660553Open ↗
10/28/2017421399007Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
01/22/2013420803722Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/06/2017421399007Open ↗
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
01/14/2020421670472Open ↗
01/14/2020421670472Open ↗
11/15/2019421660553Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
01/14/2020421670472Open ↗
11/15/2019421660553Open ↗
04/10/2019421399007Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
11/20/2014440184756Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
10/14/2014440176168Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00301374-I1Open ↗
08/13/2026Q00524680-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
11/20/2014440184756Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs64
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
02/14/2020421670472Open ↗
02/13/2020421670472Open ↗
12/05/2019421660553Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
04/16/2013420831960Open ↗
01/22/2013420803722Open ↗
Showing 2 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
02/14/2018421426898Open ↗
02/14/2018421426898Open ↗
10/28/2017421399007Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
08/25/2016401942957Open ↗
▸Cost, Insurance & Ownership63
▸BISCOST AFFIDAVIT62
01/14/2020421670472Open ↗
11/15/2019421660553Open ↗
08/02/2019440176168Open ↗
Showing 3 of 62 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET23
03/18/2019421723308Open ↗
10/25/2018421670472Open ↗
10/25/2018421660553Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION5
03/30/2019421399007Open ↗
01/25/2019421670472Open ↗
01/30/2018421426898Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
04/22/2015440213421Open ↗
02/12/2015440200943Open ↗
11/20/2014440184756Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
11/21/2019421660553Open ↗
08/02/2019440176168Open ↗
01/22/2018421426898Open ↗
▸Other Documents5
▸BISDRY PIPE VALVE TEST : FP-102
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/19/2020421670472Open ↗