← Back
One family attached or semi-detached
114-12 SPRINGFIELD BLVD
QUEENS · BIN 4237287
💬 Discuss this project
1935Year Built
2Stories
A5Building Class
R3-2Zoning
1,224 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,800 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEDINA ENERGY GROUP, LLC212/30/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASLAM GENERAL CONSTRUCTIOGeneral Contractor107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
Building Lifecycle
All (17)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Inspection (4)Objection (6)
10/21/2022
Signed off — Alteration
DRIVEWAY RECONSTRUCTION AND RE-GRADING & CELLAR ENTRANCE CONSTRUCTION
Q00644901-I1
10/20/2022
Signed off — Alteration
Front Yard Stormwater Management System
Q00655394-I1
10/20/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/01/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/30/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/30/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/24/2022
Permit issued — Plumbing
Q00655394-I1-PL
08/19/2022
Permit issued — General Construction
Q00644901-I1-GC
12/30/2021
Filed — Alteration
Front Yard Stormwater Management System
Q00655394-I1
12/29/2021
Objection raised — Scope
12/29/2021
Objection resolved — Addressed
12/29/2021
Objection raised — Inspections
12/29/2021
Objection resolved — Addressed
12/29/2021
Objection raised — Scope
12/29/2021
Objection resolved — Addressed
12/23/2021
Filed — Alteration
DRIVEWAY RECONSTRUCTION AND RE-GRADING & CELLAR ENTRANCE CONSTRUCTION
Q00644901-I1
03/05/2007
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG08/24/2022
DOB NOWGeneral ConstructionSigned-offASLAM GENERAL CONSTRUCTIO08/19/2022
1 project · most recent 09/17/2021
General Wiring
FiledStatusContractorScope
09/17/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/20/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/01/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/30/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00655394-I1Request digital key ↗
08/15/2026Q00644901-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00644901-I1Open ↗
08/13/2026Q00655394-I1Open ↗