← Back
BuildNYC
Two family converted from one family
114-15 208TH STREET
QUEENS · Queens Village · BIN 4237122
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3AZoning
1,188 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · 3,000 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed Photovoltaic Power System3p · 2 filings · 13 docs
Floor 14p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2023$720K—Private party → Private party$606/sf building
09/30/2021$475K—Private party → Private party$400/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering108/22/2024
Psarchitecture311/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Banji Awosika Architect603/21/2026
NY State Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSGeneral Contractor107/08/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841108/22/2024
Building Lifecycle
All (22)Filed (4)Permit Issued (2)Signed Off (2)Violation (3)Inspection (2)Objection (4)Special Inspection (5)
01/15/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01100535-I1
08/28/2024
Permit issued — Solar
Q01100535-I1-SL
08/22/2024
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01100535-I1
08/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
08/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
08/22/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
08/22/2024
Special inspection requirement — Final
ROBERT MASONE
08/22/2024
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
06/05/2023
Signed off — Alteration
LEGALIZE WATER AND WASTE LINES FOR EXISTING TWO BATHROOM FIXTURES RECTIFY VIO 34785106M
Q00658590-I1
05/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/30/2022
Filed — Alteration
LEGALIZE WATER AND WASTE LINES FOR EXISTING TWO BATHROOM FIXTURES RECTIFY VIO 34785106M
Q00658590-P2
09/13/2022
Filed — Alteration
LEGALIZE WATER AND WASTE LINES FOR EXISTING TWO BATHROOM FIXTURES RECTIFY VIO 34785106M
Q00658590-P1
06/28/2022
Permit issued — Plumbing
Q00658590-I1-PL
01/14/2022
Objection raised — Energy
01/14/2022
Objection resolved — Addressed
01/14/2022
Objection raised — Zoning
01/14/2022
Objection resolved — Addressed
01/12/2022
Filed — Alteration
LEGALIZE WATER AND WASTE LINES FOR EXISTING TWO BATHROOM FIXTURES RECTIFY VIO 34785106M
Q00658590-I1
10/14/2009
Violation issued (ECB, closed)
Construction
10/14/2009
Violation issued (ECB, closed)
Unknown
05/26/2009
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS08/28/2024
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating06/28/2022
1 project · most recent 09/27/2024
FiledStatusContractorScope
09/27/2024CompleteNY Solar Electrical—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/22/2024Fire-Resistant Penetrations and JointsROBERT MASONEspecial
08/22/2024Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
08/22/2024Energy Code Compliance InspectionsROBERT MASONEprogress
08/22/2024FinalROBERT MASONEprogress
08/22/2024Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00658590-P2Request digital key ↗
08/26/2026Q00658590-P1Request digital key ↗
08/21/2026Q01100535-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
06/23/2010420118385Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00658590-I1Open ↗
08/26/2026Q00658590-P1Open ↗
08/21/2026Q01100535-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q01100535-I1Open ↗
08/24/2026Q01100535-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/23/2010420118385Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q01100535-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/23/2010420118385Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/23/2010420118385Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01100535-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
06/23/2010420118385Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01100535-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/23/2010420118385Open ↗