← Back
Two stories - detached, small or mid-size
114-17 147 STREET
QUEENS · Baisley Park · BIN 4259519
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
896 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · Owner of record: 147TH ST QUEENS INC. · 2,000 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/02/2026$695K—147TH ST QUEENS INC. → Private party$776/sf building
06/13/2025$395K—CITIMORTGAGE, INC. → 147TH ST QUEENS INC.$441/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/28/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Violation (1)Special Inspection (5)
05/07/2026
Permit issued — Solar
Q01392466-I1-SL
04/28/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01392466-I1
04/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/28/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/24/2026
Special inspection requirement — Final
Walid Abdulla
12/01/1999
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/07/2026
2 projects · most recent 05/09/2026
General Wiring
FiledStatusContractorScope
05/09/2026CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
04/28/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/28/2026
FiledStatusContractorScope
04/28/2026Signed-offSUNRUN INSTALLATION SVC12 panels, 5.4 kw, 252.24 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/28/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/28/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/24/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/24/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/24/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01392466-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026Q01392466-I1Open ↗
08/22/2026Q01392466-I1Open ↗
08/22/2026Q01392466-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026Q01392466-I1Open ↗
08/22/2026Q01392466-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01392466-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01392466-I1Open ↗