← Back
Two family converted from one family
114-20 168 STREET
QUEENS · Baisley Park · BIN 4267120
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3AZoning
2,398 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Floor 29p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
Site & exterior11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VARG CONSTRUCTION907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2023$1.3M—168 STREET BUILDERS CORP. → Private party$530/sf building
04/11/2022$480K—Private party → TARAB LLC$200/sf building
04/11/2022$100K—TARAB LLC → 168 STREET BUILDERS CORP.$42/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.403/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor707/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781303/10/2023
TRIANGLE INSPECTION & TES7495108/11/2022
Building Lifecycle
All (48)Filed (4)Permit Issued (4)Signed Off (2)Violation (1)Inspection (7)Special Inspection (30)
11/16/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/22/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00752524-I1
Q00752524-S1
03/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/20/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT APPLICATION TO BE FILED. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Q00723695-I1
03/15/2023
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Metering
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/15/2023
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Masonry
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
03/15/2023
Special inspection requirement — Air barrier — testing
CHRISTIAN LOZADA
03/10/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00752524-I1
Q00752524-P1
11/22/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/10/2022
Permit issued — Plumbing
Q00752524-S1-PL
11/09/2022
Permit issued — Earth Work
Q00752524-I1-GC-CX
10/12/2022
Permit issued — Structural
Q00752524-I1-GC-CX
09/15/2022
Permit issued — Construction Fence
Q00723695-I1-FN
08/11/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00752524-I1
Q00752524-S1
06/27/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00752524-I1
Q00752524-I1
04/22/2022
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT APPLICATION TO BE FILED. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Q00723695-I1
06/13/2013
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR11/10/2022
DOB NOWEarth WorkPermit IssuedJ&J DESIGNS INC11/09/2022
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC10/12/2022
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC09/15/2022
1 project · most recent 03/17/2023
General Wiring
FiledStatusContractorScope
03/17/2023CompleteAYYUB ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/22/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/22/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
03/15/2023Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
03/15/2023Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
03/15/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
03/15/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
03/15/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
03/15/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/15/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
03/15/2023MeteringCHRISTIAN LOZADAenergy_progress
03/15/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/15/2023Heating SystemsCHRISTIAN LOZADAspecial
03/15/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
03/15/2023Mechanical SystemsCHRISTIAN LOZADAspecial
03/15/2023Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
03/15/2023Subgrade InspectionsCHRISTIAN LOZADAspecial
03/15/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/15/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/15/2023Structural Steel - DetailsCHRISTIAN LOZADAspecial
03/15/2023Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
03/15/2023Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
03/15/2023Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
03/15/2023MasonryCHRISTIAN LOZADAspecial
03/15/2023Structural Wood FrameCHRISTIAN LOZADAprogress
03/15/2023Footing and FoundationCHRISTIAN LOZADAprogress
03/15/2023FinalCHRISTIAN LOZADAprogress
03/15/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
Latest 25 of 41.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00723695-I1Request digital key ↗
08/26/2026Q00752524-P1Request digital key ↗
08/26/2026Q00752524-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00752524-I1Open ↗
08/13/2026Q00752524-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00752524-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026Q00752524-I1Open ↗
08/25/2026Q00752524-I1Open ↗
08/23/2026Q00752524-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00752524-I1Open ↗
08/26/2026Q00752524-P1Open ↗
08/26/2026Q00752524-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00752524-I1Open ↗
08/25/2026Q00752524-I1Open ↗
08/23/2026Q00752524-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00752524-I1Open ↗
08/26/2026Q00752524-S1Open ↗
08/26/2026Q00752524-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00752524-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00752524-I1Open ↗
08/13/2026Q00752524-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00752524-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026Q00752524-I1Open ↗
08/13/2026Q00752524-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00752524-P1Open ↗
08/13/2026Q00752524-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/26/2026Q00752524-I1Open ↗
08/26/2026Q00752524-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00752524-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00752524-I1Open ↗