← Back
Two stories - detached, small or mid-size
114-23 176 STREET
QUEENS · St. Albans · BIN 4219826
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R2Zoning
2,808 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 14p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2018$651K—— → —$232/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.401/09/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NULITE FUEL OIL CO., LTDGeneral Contractor203/21/2026
NULITE FUEL OIL CO LTDPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808201/09/2020
Building Lifecycle
All (12)Filed (4)Permit Issued (2)Signed Off (2)Special Inspection (4)
02/25/2020
Signed off — Alteration
REPLACE GAS PIPING IN MECHANICAL ROOM FOR REPLACEMENT FURNACE AIR HANDLER UNIT. EXISTING GAS HOT WATER HEATER IN MECHANICAL ROOM. EXISTING GAS PIPING TO RANGE ON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00242278-I1
02/21/2020
Signed off — Alteration
INSTALL REPLACEMENT FURNACE AIR HANDLER AND CONDENSER UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00242240-I1
01/09/2020
Filed — Alteration
REPLACE GAS PIPING IN MECHANICAL ROOM FOR REPLACEMENT FURNACE AIR HANDLER UNIT. EXISTING GAS HOT WATER HEATER IN MECHANICAL ROOM. EXISTING GAS PIPING TO RANGE ON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00242278-P1
01/09/2020
Filed — Alteration
INSTALL REPLACEMENT FURNACE AIR HANDLER AND CONDENSER UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00242240-P1
01/09/2020
Special inspection requirement — Mechanical Systems
Joseph Bazini
01/09/2020
Special inspection requirement — Energy Code Compliance Inspections
Joseph Bazini
01/09/2020
Special inspection requirement — Final
Joseph Bazini
01/09/2020
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
11/15/2019
Permit issued — Plumbing
Q00242278-I1-PL
11/15/2019
Permit issued — Mechanical Systems
Q00242240-I1-MS
11/14/2019
Filed — Alteration
REPLACE GAS PIPING IN MECHANICAL ROOM FOR REPLACEMENT FURNACE AIR HANDLER UNIT. EXISTING GAS HOT WATER HEATER IN MECHANICAL ROOM. EXISTING GAS PIPING TO RANGE ON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00242278-I1
11/14/2019
Filed — Alteration
INSTALL REPLACEMENT FURNACE AIR HANDLER AND CONDENSER UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00242240-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNULITE FUEL OIL CO LTD11/15/2019
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD11/15/2019
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/09/2020Mechanical SystemsJoseph Bazinispecial
01/09/2020Energy Code Compliance InspectionsJoseph Baziniprogress
01/09/2020FinalJoseph Baziniprogress
01/09/2020HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00242240-I1Request digital key ↗
08/28/2026Q00242240-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00242278-I1Request digital key ↗
08/28/2026Q00242278-P1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00242278-I1Open ↗
08/28/2026Q00242278-P1Open ↗
08/28/2026Q00242240-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q00242240-I1Open ↗
08/25/2026Q00242240-I1Open ↗
08/25/2026Q00242240-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q00242240-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan4
08/28/2026Q00242278-P1Open ↗
08/28/2026Q00242278-I1Open ↗
08/28/2026Q00242240-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026Q00242278-P1Open ↗
08/28/2026Q00242278-I1Open ↗
08/28/2026Q00242240-P1Open ↗
Showing 3 of 4 on file for this type