← Back
Two family brick
114-26 SPRINGFIELD BLVD
QUEENS · Cambria Heights · BIN 4237299
💬 Discuss this project
1935Year Built
2Stories
B1Building Class
R3-2Zoning
1,224 sfGross Floor Area
2Units
5 Open Violations ▸FDNY Report ↗
Two family brick · 1,800 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/31/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/31/2024
Building Lifecycle
All (13)Filed (1)Permit Issued (1)Signed Off (1)Violation (5)Special Inspection (5)
02/02/2026
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 7 Panels, 2.46 kW
Q01161489-I1
08/04/2025
Violation issued (ECB, open)
Construction
08/04/2025
Violation issued (ECB, open)
Construction
08/04/2025
Violation issued (ECB, open)
Construction
08/04/2025
Violation issued (ECB, open)
Unknown
08/04/2025
Violation issued (ECB, open)
Construction
01/06/2025
Permit issued — Solar
Q01161489-I1-SL
12/31/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 7 Panels, 2.46 kW
Q01161489-I1
12/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/31/2024
Special inspection requirement — Final
Mina Makar
12/31/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR01/06/2025
2 projects · most recent 12/31/2024
FiledStatusContractorScope
12/31/2024CompleteISLAND ELECTRIC CORP—
08/19/2024Permit IssuedTRIANGLE ELECTRIC INC.2 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/31/2024Fire-Resistant Penetrations and JointsMina Makarspecial
12/31/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
12/31/2024Energy Code Compliance InspectionsMina Makarprogress
12/31/2024FinalMina Makarprogress
12/31/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01161489-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q01161489-I1Open ↗
08/31/2026Q01161489-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01161489-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026Q01161489-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01161489-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01161489-I1Open ↗