Two family brick
114-29 DALIAN COURT
QUEENS · College Point · BIN 4463687
💬 Discuss this project
2001Year Built
3Stories
B1Building Class
C3Zoning
2,400 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 1,400 sf lot · 1.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Edgewater Development503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2025$1.2M—Private party → Private party$500/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul J. Angelides, P.E.201/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Build Assist Planning and Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hands on Restorationspecialty_contractor407/08/2026
Master PLG HeatingPlumbing103/21/2026
Bond and Walsh ConstructionGeneral Contractor211/29/2001
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Paul J. Angelides, P.E.3980201/05/2024
Building Lifecycle
08/21/2024
Closed: Masonry of the jamb of 1ST floor window was dislodged & end of lintel of the 1ST floor window opening unsupported. Also window at the 2ND floor is…
DOB violation · closed on the city's record
07/26/2024
Closed: Structure rendered non-compliant due to vehicle impacted the building knocking out the cmu knee wall and three windows, section damaged is 6 feet…
DOB violation · closed on the city's record
04/17/2024
Signed off — Alteration
REMOVE AND RECONSTRUCT 10'-0" WIDE BY 6'-4" HIGH AREA OF EXTERIOR BRICK VENEER, CONCRETE BLOCK,AND WOOD FRAMED WALL ON FIRST FLOOR TO MATCH EXISTING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00982376-I1
01/23/2024
Permit issued — General Construction
Q00982376-I1-GC-CX
01/23/2024
Failure to comply with the commissioner's order in DOB violation VIO23-01841,dated 6/12/2023.respondent was required to submit an engineer'sreport…
ECB violation · closed
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHands on Restoration01/23/2024
DOB NOWStructuralSigned-offHands on Restoration08/15/2023
BISPLISSUEDMaster PLB and Heating01/08/2002
BIS—ISSUEDBond and Walsh Construction11/29/2001
BIS—ISSUEDBond and Walsh Construction08/14/2001
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/26/2023Fire-Resistant Penetrations and JointsPAUL ANGELIDESspecial
12/26/2023MasonryPAUL ANGELIDESspecial
12/26/2023Structural Stability – Alterations of existing buildingsPAUL ANGELIDESspecial
12/26/2023Energy Code Compliance InspectionsAdam Casselprogress
12/26/2023FinalAdam Casselprogress
12/26/2023Air barrier - visual inspectionAdam Casselenergy_progress
12/26/2023Insulation placement and R valuesAdam Casselenergy_progress
12/26/2023Fenestration air leakageAdam Casselenergy_progress
12/26/2023Fenestration and door U-factor and product ratingsAdam Casselenergy_progress