← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
114-40 FARMERS BOULEVARD
QUEENS · BIN 4623266
💬 Discuss this project
2021Year Built
2Stories
RMBuilding Class
R5BZoning
8,182 sfGross Floor Area
2Units
2 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 114-46 FARMERS LLC · 8,782 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREWER CAPITAL MGMT2407/08/2026
TOPLINE NYC CONTRACTING403/22/2026
EMPIRE GROUP NYC303/22/2026
NYC BUILDING SOLUTIONS CO203/22/2026
114-46 FARMERS603/22/2026
BX HERING LLCBREWER CAPITAL MAAG103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KYU LEE ARCHITECT, PC1001/05/2023
SYED ENGINEERING, P.C.101/05/2022
SEAD ENGINEERING, PC211/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KYU LEE ARCHITECT P C403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor903/21/2026
FOUR POINTS P & H CORPPlumbing407/08/2026
CEMENTO CONTRACTING INCGeneral Contractor303/21/2026
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
R & M CONTRACTORS CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415801/05/2023
Building Lifecycle
All (86)Filed (13)Permit Issued (10)Signed Off (7)Violation (9)Inspection (9)Objection (8)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2024
Signed off — Alteration
Q00656585-I1
04/11/2023
Signed off — Alteration
subsequent filing for structural work including foundation and shoring in conjunction with 440633129.
Q00486945-I1
04/07/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/06/2023
Signed off — Alteration
NEW CONSTRUCTION OF TWO STORY BUILDING FOR MIXED USE
Q00424871-I1
04/06/2023
Signed off — Alteration
Boiler installation in conjunction with NB application 440633129
Q00444119-I1
04/06/2023
Signed off — Alteration
NEW CONSTRUCTION OF TWO STORY BUILDING FOR MIXED USE
Q00424561-I1
04/05/2023
Signed off — Alteration
Boiler installation in conjunction with NB application 440633129
Q00444119-S2
03/17/2023
Permit issued — Mechanical Systems
Q00424871-I1-MS
03/10/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/02/2023
Signed off — Alteration
Q00424931-I1
01/30/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/23/2023
Permit issued — Boiler Equipment
Q00444119-I1-BE
01/19/2023
Permit issued — Boiler Equipment
Q00444119-S2-BE
01/15/2023
Special inspection requirement — HVAC and service water heating equipment
DOYUN KIM
01/15/2023
Special inspection requirement — Maintenance information
DOYUN KIM
01/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
01/15/2023
Special inspection requirement — Heating Systems
DOYUN KIM
01/15/2023
Special inspection requirement — HVAC and service water heating system controls
DOYUN KIM
01/12/2023
Objection resolved — Addressed
01/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
01/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
01/12/2023
Special inspection requirement — Maintenance information
DOYUN KIM
01/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
01/11/2023
Objection raised — Admin
01/05/2023
Filed — Alteration
Boiler installation in conjunction with NB application 440633129
Q00444119-S2
01/05/2023
Filed — Alteration
Boiler installation in conjunction with NB application 440633129
Q00444119-P4
01/05/2023
Special inspection requirement — Heating Systems
DOYUN KIM
01/04/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
12/16/2022
Permit issued — Boiler Equipment
Q00444119-S1-BE
12/11/2022
Special inspection requirement — Maintenance information
DOYUN KIM
12/11/2022
Special inspection requirement — HVAC and service water heating equipment
DOYUN KIM
12/11/2022
Special inspection requirement — HVAC and service water heating system controls
DOYUN KIM
12/11/2022
Special inspection requirement — HVAC insulation and sealing
DOYUN KIM
12/11/2022
Special inspection requirement — Energy Code Compliance Inspections
Kyumyeon Lee
12/11/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DOYUN KIM
12/06/2022
Filed — Alteration
NEW CONSTRUCTION OF TWO STORY BUILDING FOR MIXED USE
Q00424561-P3
12/05/2022
Special inspection requirement — HVAC and service water heating system controls
DOYUN KIM
12/05/2022
Special inspection requirement — HVAC and service water heating equipment
DOYUN KIM
12/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Kyumyeon Lee
12/05/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DOYUN KIM
12/05/2022
Special inspection requirement — HVAC insulation and sealing
DOYUN KIM
12/05/2022
Special inspection requirement — Maintenance information
DOYUN KIM
10/14/2022
Objection resolved — Addressed
10/14/2022
Special inspection requirement — Maintenance information
DOYUN KIM
10/14/2022
Special inspection requirement — Heating Systems
DOYUN KIM
10/14/2022
Special inspection requirement — Mechanical Systems
DOYUN KIM
10/14/2022
Special inspection requirement — Final
DOYUN KIM
10/14/2022
Special inspection requirement — Permanent certificate
DOYUN KIM
10/14/2022
Special inspection requirement — HVAC and service water heating equipment
DOYUN KIM
10/14/2022
Special inspection requirement — Shutoff dampers
DOYUN KIM
10/14/2022
Special inspection requirement — HVAC and service water heating system controls
DOYUN KIM
10/11/2022
Filed — Alteration
NEW CONSTRUCTION OF TWO STORY BUILDING FOR MIXED USE
Q00424871-P1
09/27/2022
Objection raised — Scope
09/20/2022
Filed — Alteration
NEW CONSTRUCTION OF TWO STORY BUILDING FOR MIXED USE
Q00424561-P2
08/31/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/25/2022
Violation issued (ECB, closed)
Construction
08/25/2022
Violation issued (ECB, closed)
Construction
07/27/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNYC BUILDING SOLUTIONS CO03/17/2023
DOB NOWBoiler EquipmentSigned-offFOUR POINTS P & H CORP01/23/2023
DOB NOWBoiler EquipmentSigned-offFOUR POINTS P & H CORP01/19/2023
DOB NOWBoiler EquipmentPermit IssuedFOUR POINTS P & H CORP12/16/2022
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP04/11/2022
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO02/01/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING01/05/2022
DOB NOWStructuralSigned-offNYC BUILDING SOLUTIONS CO09/22/2021
DOB NOWConstruction FenceSigned-offCEMENTO CONTRACTING INC05/12/2021
DOB NOWConstruction FenceSigned-offR & M CONTRACTORS CORP04/08/2021
BISOTISSUEDADVANCED SOLAR SOLUTIONS02/09/2023
BIS—ISSUEDNYC BUILDING SOLUTIONS CO12/30/2022
BIS—ISSUEDNYC BUILDING SOLUTIONS CO10/28/2022
BIS—ISSUEDNYC BUILDING SOLUTIONS CO06/15/2022
BIS—ISSUEDEMPIRE GROUP NYC LLC10/04/2021
BIS—ISSUEDEMPIRE GROUP NYC LLC09/29/2021
BIS—ISSUEDHALAL BUILDING & CONSTRU*05/20/2021
3 projects · most recent 01/25/2023
General Wiring
FiledStatusContractorScope
01/25/2023CompleteKJK ELECTRIC INCGeneral Wiring
11/04/2022CompleteVILLAGE ELECTL CONTRS INC—
01/06/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/07/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2023Pass-Final Boiler Equipment InspectionPassView ↗
01/04/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
08/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
01/15/2023HVAC and service water heating equipment DOYUN KIMenergy_progress
01/15/2023Maintenance informationDOYUN KIMenergy_progress
01/15/2023HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
01/15/2023Heating SystemsDOYUN KIMspecial
01/15/2023HVAC and service water heating system controls DOYUN KIMenergy_progress
01/12/2023HVAC-R and service water heating equipmentDOYUN KIMenergy_progress
01/12/2023HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
01/12/2023Maintenance informationDOYUN KIMenergy_progress
01/12/2023HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
01/05/2023Heating SystemsDOYUN KIMspecial
12/11/2022Maintenance informationDOYUN KIMenergy_progress
12/11/2022HVAC and service water heating equipment DOYUN KIMenergy_progress
12/11/2022HVAC and service water heating system controls DOYUN KIMenergy_progress
12/11/2022HVAC insulation and sealing DOYUN KIMenergy_progress
12/11/2022Energy Code Compliance InspectionsKyumyeon Leeprogress
12/11/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDOYUN KIMspecial
12/05/2022HVAC and service water heating system controls DOYUN KIMenergy_progress
12/05/2022HVAC and service water heating equipment DOYUN KIMenergy_progress
12/05/2022Energy Code Compliance InspectionsKyumyeon Leeprogress
12/05/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDOYUN KIMspecial
12/05/2022HVAC insulation and sealing DOYUN KIMenergy_progress
12/05/2022Maintenance informationDOYUN KIMenergy_progress
10/14/2022Maintenance informationDOYUN KIMenergy_progress
10/14/2022Heating SystemsDOYUN KIMspecial
10/14/2022Mechanical SystemsDOYUN KIMspecial
Latest 25 of 54.
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026Q00424561-P3Request digital key ↗
08/25/2026Q00424561-P1Request digital key ↗
08/25/2026Q00424561-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch4
08/27/2026Q00486945-P1Request digital key ↗
08/26/2026Q00656585-I1Request digital key ↗
08/25/2026Q00444119-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/25/2026Q00444119-I1Request digital key ↗
08/14/2026Q00444119-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00424871-P1Request digital key ↗
08/27/2026Q00424871-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00424931-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION15
09/27/2023440633129Open ↗
05/22/2023440641879Open ↗
01/20/2023440633129Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION7
02/09/2023440753837Open ↗
12/28/2022440633129Open ↗
09/19/2022440633129Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISTOPO STAMP PD11
09/23/2022421812649Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/16/2022421812649Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/16/2022421812649Open ↗
▸BISVERIFY TAX LOT1
02/02/2023440633129Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026Q00424871-I1Open ↗
08/27/2026Q00444119-P4Open ↗
08/27/2026Q00424931-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026Q00444119-S2Open ↗
08/31/2026Q00424561-P3Open ↗
08/31/2026Q00424561-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026Q00444119-S2Open ↗
08/31/2026Q00424561-P3Open ↗
08/29/2026Q00424561-P2Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
11/28/2022440753837Open ↗
05/04/2021440641879Open ↗
10/01/2020440633129Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/28/2022440753837Open ↗
▸Trade Schedules & Equipment9
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
02/15/2023440633129Open ↗
09/03/2021440633129Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
07/07/2021421936454Open ↗
07/07/2021421936454Open ↗
▸BISGAS CUT-OFF1
07/07/2021421936454Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/06/2023440633129Open ↗
▸BISELECTRIC CUT-OFF1
07/07/2021421936454Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/06/2023440633129Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/30/2021440633129Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
08/30/2021440633129Open ↗
05/03/2021440641879Open ↗
10/01/2020440633129Open ↗
▸BISSTREET TREE SIGNOFF2
05/10/2023440641879Open ↗
05/10/2023440633129Open ↗
▸BISSTREET TREES SITE PLAN2
09/26/2023440633129Open ↗
05/04/2021440641879Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/07/2021421936454Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/23/2021440633129Open ↗
▸Environmental & Asbestos20
▸DOB NOWOER: Notice to Proceed12
08/27/2026Q00424871-I1Open ↗
08/13/2026Q00424561-P1Open ↗
08/13/2026Q00424561-P2Open ↗
Showing 3 of 12 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
11/28/2022440753837Open ↗
02/22/2021440633129Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/28/2022440753837Open ↗
12/17/2020421936454Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
05/10/2023440641879Open ↗
11/21/2022440633129Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q00424561-I1Open ↗
08/13/2026Q00444119-S2Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
03/15/2023440753837Open ↗
02/09/2023440753837Open ↗
11/28/2022440753837Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00424871-I1Open ↗
08/13/2026Q00424561-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/06/2023440633129Open ↗
▸BISINTERIOR LIGHTING POWER1
02/06/2023440633129Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/15/2023440753837Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/06/2023440633129Open ↗
▸BISFENESTRATION AREAS1
02/06/2023440633129Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
02/06/2023440633129Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/28/2022440753837Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/15/2023440753837Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/15/2023440753837Open ↗
02/09/2023440753837Open ↗
11/28/2022440753837Open ↗
Showing 3 of 7 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS1
02/06/2023440633129Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/17/2023440633129Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/06/2023440633129Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/06/2023440633129Open ↗
▸BISMASONRY1
02/06/2023440633129Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/06/2023440633129Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION8
09/06/2023440641879Open ↗
11/02/2022421812649Open ↗
09/16/2022421812649Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
12/09/2022440633129Open ↗
08/31/2021440633129Open ↗
06/30/2021440633129Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/24/2023440753837Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
07/07/2021421936454Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/28/2022440633129Open ↗
09/23/2021440633129Open ↗
▸BISCOST AFFIDAVIT2
03/15/2023440753837Open ↗
11/28/2022440753837Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
09/19/2022440633129Open ↗
07/07/2021421936454Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION10
02/07/2023440753837Open ↗
02/03/2023440641879Open ↗
01/26/2023440633129Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/28/2022440753837Open ↗
05/04/2021440641879Open ↗
10/01/2020440633129Open ↗
▸BISEFILING COVER SHEET2
11/02/2022421812649Open ↗
12/17/2020421936454Open ↗
▸BISBOROUGH INTAKE FORM2
11/02/2022421812649Open ↗
07/07/2021421936454Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/04/2021440641879Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION3
10/30/2020440641879Open ↗
10/30/2020440641879Open ↗
10/30/2020440641879Open ↗
▸BISSHUTOFF DAMPERS1
02/06/2023440633129Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
08/30/2021440633129Open ↗
▸BISLOWEST FLOOR ELEVATION1
02/06/2023440633129Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
02/06/2023440633129Open ↗
▸BISMAINTENANCE INFORMATION1
02/06/2023440633129Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/16/2022421812649Open ↗
▸BISTax Abatement Miscellaneous1
03/24/2023440753837Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00486945-I1Open ↗