2 Open Violations 1 unresolved · 1 paperwork only▸
ECB04/22/2024FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39026380J ISSUED ON 8/5/2020, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERTIF$1K due
ECB08/05/2020GARAGE EXTENDED ON THE LEFT SIDE APPROX. 10 FEET WIDE X 10 FEET DEEP X 10.5 FEET HIGH AND IT IS ON THE REAR PROPERTY LINE. INSTALLED AN ENTRY DOOR AND A WINDOW AT FRONT OF THE EXTENSION AND ANOTHER DOOR OPENEDNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 3,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.