← Back
Two family frame
114-88 177 PLACE
QUEENS · BIN 4268706
💬 Discuss this project
1950Year Built
1.67Stories
B2Building Class
R3XZoning
—Gross Floor Area
2Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family frame · Owner of record: PSF REO LLC · 0.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
88HOMES209/14/2026
PSF REO LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT208/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAJINDRAH RAMRATTANElectrical103/21/2026
Building Lifecycle
All (11)Filed (2)Violation (4)Objection (4)Special Inspection (1)
09/14/2026
Objection raised — Other
09/14/2026
Objection raised — Cost
08/28/2026
Filed — Alteration
Application seeks to legalize the rear extension and address existing violations, as shown in the attached drawings. It also proposes the construction of a three-fixture bathroom at the cellar level. There will be no changes to egress, use, or occupancy.
Q01441176-S1
08/28/2026
Objection resolved — Addressed
08/26/2026
Objection raised — Other
08/12/2026
Filed — Alteration
Application seeks to legalize the rear extension and address existing violations, as shown in the attached drawings. It also proposes the construction of a three-fixture bathroom at the cellar level. There will be no changes to egress, use, or occupancy.
Q01441176-I1
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/27/2017
Violation issued (ECB, closed)
Construction
11/15/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2017
Violation issued (ECB, open)
Construction
08/24/2017
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDNEW BROWNSTONE NYC RENO*03/27/2019
BISPLISSUEDBT'S PLUMBING AND HEATING02/27/2018
BISOTISSUEDSJ EMPIRE CORP02/22/2018
1 project · most recent 08/28/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/28/2026——Ventilation Systems
Ventilation
Greenheck SP-A50-90-VG-L-QD 50 CFM · Exhaust Fan ×2
1 project · most recent 08/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/28/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/05/2026Fire-Resistant Penetrations and Joints—special
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01441176-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
04/03/2019421581103Open ↗
02/28/2018421581103Open ↗
02/23/2018421581103Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
01/25/2019421581103Open ↗
02/01/2018421581103Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
09/27/2026Q01441176-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/27/2026Q01441176-S1Open ↗
08/16/2026Q01441176-I1Open ↗
08/16/2026Q01441176-S1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/01/2018421581103Open ↗
02/01/2018421581103Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/01/2018421581103Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/01/2018421581103Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/01/2018421581103Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/01/2018421581103Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/27/2026Q01441176-S1Open ↗
08/16/2026Q01441176-I1Open ↗
08/16/2026Q01441176-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/01/2018421581103Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/01/2018421581103Open ↗
▸Inspections & Test Reports2
▸BISBORINGS / TEST PITS (TR-4) 27-7201
02/15/2018421581103Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/01/2018421581103Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/03/2019421581103Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/01/2018421581103Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
02/01/2018421581103Open ↗
▸BISADDITIONAL INFORMATION1
03/07/2019421581103Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
02/23/2018421581103Open ↗