← Back
Two family converted from one family
114 DONLEY AVENUE
STATEN ISLAND · Rosebank-Shore Acres-Park Hill · BIN 5044808
💬 Discuss this project
1935Year Built
2.5Stories
B3Building Class
R3-2Zoning
2,959 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 213p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Basement13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVS CONSTRUCTION MGMT603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALFRED V SAULO, ARCHITECT PC807/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VSS CONSULTANTS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVS CONSTRUCTION MGMT INCGeneral Contractor1407/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing307/08/2026
RITE-FLO P.H.& COOLING INPlumbing107/08/2026
RR PLUMBING SERVICES COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANSELMO S. GENOVESE ARCHI2377307/19/2023
ALFRED V SAULO, ARCHITECT1905105/31/2022
Building Lifecycle
All (105)Filed (8)Permit Issued (14)Signed Off (3)Violation (6)Inspection (6)Objection (38)Special Inspection (30)
02/07/2024
Signed off — Alteration CO
Structural Steel posts and Beams associated with Alt. C/O (bolted steel connections) at all floor levels from Basement to Second Floor.
S00586460-S2
02/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/02/2024
Permit issued — Plumbing
S00586460-S2-PL
01/09/2024
Signed off — Alteration
application filed to obtain fence permit for 114 donley avenue
S00535865-I1
11/30/2023
Permit issued — Plumbing
S96387456-S2-PL
08/03/2023
Special inspection requirement — Lighting in dwelling units
Anselmo Genovese
08/03/2023
Special inspection requirement — Air barrier - visual inspection
Anselmo Genovese
08/03/2023
Special inspection requirement — Interior lighting power
Anselmo Genovese
08/03/2023
Special inspection requirement — Insulation placement and R values
Anselmo Genovese
08/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anselmo Genovese
08/03/2023
Special inspection requirement — Concrete - Cast-In-Place
Anselmo Genovese
08/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anselmo Genovese
08/03/2023
Special inspection requirement — Subgrade Inspections
Anselmo Genovese
08/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
Anselmo Genovese
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Anselmo Genovese
08/03/2023
Special inspection requirement — Fenestration areas
Anselmo Genovese
07/19/2023
Filed — Alteration CO
Structural Steel posts and Beams associated with Alt. C/O (bolted steel connections) at all floor levels from Basement to Second Floor.
S00586460-P2
07/19/2023
Special inspection requirement — Air barrier - visual inspection
Anselmo Genovese
07/19/2023
Special inspection requirement — Fenestration areas
Anselmo Genovese
07/19/2023
Special inspection requirement — Concrete - Cast-In-Place
Anselmo Genovese
07/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anselmo Genovese
07/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anselmo Genovese
07/19/2023
Special inspection requirement — Subgrade Inspections
Anselmo Genovese
07/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Anselmo Genovese
07/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
Anselmo Genovese
07/19/2023
Special inspection requirement — Interior lighting power
Anselmo Genovese
07/19/2023
Special inspection requirement — Insulation placement and R values
Anselmo Genovese
07/19/2023
Special inspection requirement — Lighting in dwelling units
Anselmo Genovese
06/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/30/2023
Permit issued — Plumbing
S96387456-S2-PL
02/13/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/10/2023
Permit issued — General Construction
S00586460-I1-GC
02/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/07/2023
Permit issued — Construction Fence
S00535865-I1-FN
12/28/2022
Permit issued — Plumbing
S96387456-S2-PL
11/07/2022
Permit issued — Plumbing
S00586460-S2-PL
09/30/2022
Filed — Alteration CO
Structural Steel posts and Beams associated with Alt. C/O (bolted steel connections) at all floor levels from Basement to Second Floor.
S00586460-S2
09/28/2022
Signed off — Alteration
S00541350-I1
08/05/2022
Filed — Alteration CO
Structural Steel posts and Beams associated with Alt. C/O (bolted steel connections) at all floor levels from Basement to Second Floor.
S00586460-P1
08/04/2022
Special inspection requirement — Energy Code Compliance Inspections
Anselmo Genovese
08/04/2022
Special inspection requirement — Subgrade Inspections
Anselmo Genovese
08/04/2022
Special inspection requirement — Concrete - Cast-In-Place
Anselmo Genovese
08/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anselmo Genovese
08/04/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anselmo Genovese
08/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
Anselmo Genovese
08/04/2022
Special inspection requirement — Air barrier - visual inspection
Anselmo Genovese
08/04/2022
Special inspection requirement — Interior lighting power
Anselmo Genovese
07/01/2022
Permit issued — Construction Fence
S00535865-I1-FN
06/14/2022
Permit issued — General Construction
S00586460-I1-GC
06/08/2022
Objection raised — Scope
06/08/2022
Objection raised — Inspections
06/07/2022
Objection raised — Zoning
06/07/2022
Objection resolved — Addressed
05/31/2022
Filed — Alteration
Obtain CC Permit for (shared) 18ft Curb Cut to provide access to new detached garage filed per DOB NOW Job No. S00626590-I1 & Alt C/O per DOB NOW Job No. S00586460-I1
S00747852-I1
05/31/2022
Filed — Alteration CO
Structural Steel posts and Beams associated with Alt. C/O (bolted steel connections) at all floor levels from Basement to Second Floor.
S00586460-S1
04/26/2022
Violation issued (ECB, closed)
Construction
04/21/2022
Permit issued — General Construction
S00541350-I1-FO
04/08/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC02/02/2024
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC11/30/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC05/30/2023
DOB NOWGeneral ConstructionPermit IssuedAVS CONSTRUCTION MGMT INC02/10/2023
DOB NOWConstruction FenceSigned-offAVS CONSTRUCTION MGMT INC02/07/2023
DOB NOWPlumbingSigned-offRR PLUMBING SERVICES CO12/28/2022
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR11/07/2022
DOB NOWConstruction FenceSigned-offAVS CONSTRUCTION MGMT INC07/01/2022
DOB NOWGeneral ConstructionPermit IssuedAVS CONSTRUCTION MGMT INC06/14/2022
DOB NOWGeneral ConstructionSigned-offAVS CONSTRUCTION MGMT INC04/21/2022
DOB NOWFoundationSigned-offAVS CONSTRUCTION MGMT INC10/25/2021
DOB NOWFoundationSigned-offAVS CONSTRUCTION MGMT INC08/10/2021
DOB NOWFoundationSigned-offAVS CONSTRUCTION MGMT INC08/10/2021
DOB NOWConstruction FenceSigned-offAVS CONSTRUCTION MGMT INC06/14/2021
1 project · most recent 01/24/2024
General Wiring
FiledStatusContractorScope
01/24/2024CompleteFICHERA ELECTRIC, INCGeneral Wiring
1 project · most recent 07/19/2023
Steel
FiledStatusContractorScope
07/19/2023Signed-offA-1 UNDERGRND PLMBNG CONSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/13/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/03/2023Lighting in dwelling unitsAnselmo Genoveseenergy_progress
08/03/2023Air barrier - visual inspectionAnselmo Genoveseenergy_progress
08/03/2023Interior lighting powerAnselmo Genoveseenergy_progress
08/03/2023Insulation placement and R valuesAnselmo Genoveseenergy_progress
08/03/2023Fire-Resistant Penetrations and JointsAnselmo Genovesespecial
08/03/2023Concrete - Cast-In-PlaceAnselmo Genovesespecial
08/03/2023Structural Stability – Alterations of existing buildingsAnselmo Genovesespecial
08/03/2023Subgrade InspectionsAnselmo Genovesespecial
08/03/2023Fire-Resistance Rated ConstructionAnselmo Genoveseprogress
08/03/2023Energy Code Compliance InspectionsAnselmo Genoveseprogress
08/03/2023Fenestration areasAnselmo Genoveseenergy_progress
07/19/2023Air barrier - visual inspectionAnselmo Genoveseenergy_progress
07/19/2023Fenestration areasAnselmo Genoveseenergy_progress
07/19/2023Concrete - Cast-In-PlaceAnselmo Genovesespecial
07/19/2023Fire-Resistant Penetrations and JointsAnselmo Genovesespecial
07/19/2023Structural Stability – Alterations of existing buildingsAnselmo Genovesespecial
07/19/2023Subgrade InspectionsAnselmo Genovesespecial
07/19/2023Energy Code Compliance InspectionsAnselmo Genoveseprogress
07/19/2023Fire-Resistance Rated ConstructionAnselmo Genoveseprogress
07/19/2023Interior lighting powerAnselmo Genoveseenergy_progress
07/19/2023Insulation placement and R valuesAnselmo Genoveseenergy_progress
07/19/2023Lighting in dwelling unitsAnselmo Genoveseenergy_progress
08/04/2022Energy Code Compliance InspectionsAnselmo Genoveseprogress
08/04/2022Subgrade InspectionsAnselmo Genovesespecial
08/04/2022Concrete - Cast-In-PlaceAnselmo Genovesespecial
Latest 25 of 35.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026S00535865-I1Request digital key ↗
08/25/2026S00541350-I1Request digital key ↗
08/23/2026S00586460-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
02/01/2022540207667Open ↗
09/30/2021540207667Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/30/2021540207667Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00586460-P1Open ↗
08/13/2026S00586460-I1Open ↗
08/13/2026S00586460-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00586460-I1Open ↗
08/13/2026S00586460-P1Open ↗
08/13/2026S00586460-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00586460-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature21
09/20/2026S00586460-P1Open ↗
09/20/2026S00586460-P1Open ↗
09/20/2026S00586460-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/20/2026S00586460-P1Open ↗
09/20/2026S00586460-P1Open ↗
09/20/2026S00586460-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00541350-I1Open ↗
08/13/2026S00586460-P2Open ↗
08/13/2026S00586460-P1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/30/2021540207667Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2021540207667Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00586460-P2Open ↗
08/13/2026S00586460-I1Open ↗
08/13/2026S00586460-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/13/2026S00586460-I1Open ↗
08/13/2026S00586460-P1Open ↗
08/13/2026S00586460-P2Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
09/30/2021540207667Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00586460-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026S00541350-I1Open ↗
08/13/2026S00586460-S2Open ↗
08/13/2026S00586460-P2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00541350-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/30/2021540207667Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
02/01/2022540207667Open ↗
09/30/2021540207667Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/30/2021540207667Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification3
08/13/2026S00586460-P1Open ↗
08/13/2026S00586460-P2Open ↗
08/13/2026S00586460-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026S00586460-P2Open ↗
08/13/2026S00586460-P1Open ↗
08/13/2026S00586460-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00586460-I1Open ↗
08/13/2026S00586460-P1Open ↗
08/13/2026S00586460-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026S00586460-P2Open ↗
08/13/2026S00586460-P1Open ↗
08/13/2026S00586460-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
02/01/2022540207667Open ↗
09/30/2021540207667Open ↗