← Back
Large suburban residence
114 FOUR CORNERS ROAD
STATEN ISLAND · BIN 5022907
💬 Discuss this project
1986Year Built
2Stories
A3Building Class
R1-1Zoning
3,326 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 10,179 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 23p · 2 filings · 19 docs
Floor 13p · 2 filings · 19 docs
Cellar4p · 2 filings · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANNA & LOCCISANO ARCHITECTS, PC503/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARBUTUS HYLAN REALTY CORPGeneral Contractor603/21/2026
CAPITAL CONTR P&H CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738303/31/2023
Building Lifecycle
All (36)Filed (5)Permit Issued (4)Violation (2)Inspection (7)Special Inspection (18)
10/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/19/2023
Permit issued — Plumbing
S00510778-I1-PL
07/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/18/2023
Permit issued — Mechanical Systems
S00848402-I1-MS
04/03/2023
Special inspection requirement — Structural Steel - Details
anthony santoro
04/03/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/03/2023
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
04/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
04/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/03/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
04/03/2023
Special inspection requirement — Final
anthony santoro
04/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/03/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/03/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/03/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
04/03/2023
Special inspection requirement — Interior lighting power
anthony santoro
04/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/03/2023
Special inspection requirement — Fenestration areas
anthony santoro
03/31/2023
Filed — Alteration
S00510627-P1
03/31/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/30/2023
Filed — Alteration
MECHANICAL WORK TYPE FILED FOR ADDITION OF (1) FURNACE IN ATTIC. THIS APPLICATION IS IN CONJUNCTION WITH # S00510627 & S00510778
S00848402-I1
03/30/2023
Filed — Alteration
FILE PLUMBING APPLICATION W/ DOBNOW IN CONJUNCTION W/ ALT. APPLICATION S00510627. SEE COMMENTS FOR FULL DESCRIPTION FOR THIS PLUMBING FILING. PAA FILED TO REVISE PLUMBING PLANS AND PAPERWORK.
S00510778-P1
03/17/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
06/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/16/2022
Permit issued — Structural
S00510627-I1-GC-CX
05/13/2022
Permit issued — Plumbing
S00510778-I1-PL
07/26/2021
Filed — Alteration
S00510627-I1
07/26/2021
Filed — Alteration
FILE PLUMBING APPLICATION W/ DOBNOW IN CONJUNCTION W/ ALT. APPLICATION S00510627. SEE COMMENTS FOR FULL DESCRIPTION FOR THIS PLUMBING FILING. PAA FILED TO REVISE PLUMBING PLANS AND PAPERWORK.
S00510778-I1
09/05/2003
Violation issued (ECB, closed)
Construction
08/08/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCAPITAL CONTR P&H CORP07/19/2023
DOB NOWMechanical SystemsPermit IssuedARBUTUS HYLAN REALTY CORP04/18/2023
DOB NOWStructuralPermit IssuedARBUTUS HYLAN REALTY CORP05/16/2022
DOB NOWPlumbingPermit IssuedCAPITAL CONTR P&H CORP05/13/2022
BISPLISSUEDAJIT ONE MECH&GEN'L CONTR10/05/2006
BISOTISSUEDJOT GENRAL CONTRACTING INC08/17/2004
1 project · most recent 07/18/2022
General Wiring
FiledStatusContractorScope
07/18/2022Permit IssuedRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/09/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/03/2023Structural Steel - Detailsanthony santorospecial
04/03/2023Concrete - Cast-In-Placeanthony santorospecial
04/03/2023Structural Steel - High Strength Boltinganthony santorospecial
04/03/2023Structural Stability – Alterations of existing buildingsanthony santorospecial
04/03/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
04/03/2023Structural Wood Frameanthony santoroprogress
04/03/2023Finalanthony santoroprogress
04/03/2023Fire-Resistance Rated Constructionanthony santoroprogress
04/03/2023Energy Code Compliance Inspectionsanthony santoroprogress
04/03/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/03/2023Fenestration air leakageanthony santoroenergy_progress
04/03/2023Interior lighting poweranthony santoroenergy_progress
04/03/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/03/2023Fenestration areasanthony santoroenergy_progress
03/31/2023Energy Code Compliance Inspectionsanthony santoroprogress
03/31/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/17/2023Energy Code Compliance Inspectionsanthony santoroprogress
03/17/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00510778-I1Request digital key ↗
08/23/2026S00510778-P1Request digital key ↗
08/23/2026S00848402-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026S00510627-I1Open ↗
08/31/2026S00510627-I1Open ↗
08/24/2026S00510778-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00510778-P1Open ↗
08/23/2026S00510778-I1Open ↗
08/23/2026S00510627-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026S00510627-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026S00510778-P1Open ↗
08/23/2026S00510778-I1Open ↗
08/23/2026S00510627-I1Open ↗
Showing 3 of 4 on file for this type