Condo, residential unit in elevator building
114 LEXINGTON AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3056424
💬 Discuss this project
2022Year Built
5Stories
R4Building Class
R6BZoning
16,498 sfGross Floor Area
26Units
Rent Stabilized0 Open Violations
Condo, residential unit in elevator building · Owner of record: 114 LEXINGTON CONDOMINIUMS LLC · 7,275 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction59p · 2 filings · 20 docs
Floor 5Under Construction69p · 1 filing · 20 docs
Floor 4Under Construction67p · 1 filing · 20 docs
Floor 3Under Construction65p · 1 filing · 20 docs
Floor 2Under Construction72p · 1 filing · 20 docs
Floor 1Under Construction97p · 1 filing · 20 docs
CellarUnder Construction4p · 1 filing · 20 docs
Site & exterior23p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LE CAPITAL NYC3707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO502/09/2026
FABIAN CRUZ PE PLLC807/29/2023
R AND O ENGINEERING. P.C.303/21/2023
JOEL PHAGOO P.E. PLLC509/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO903/21/2026
PINE NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVESTA BUILDERS INCGeneral Contractor1104/09/2026
MNK ENTERPRISES LLCGeneral Contractor1007/08/2026
HD BUILDERS NY LLCGeneral Contractor804/09/2026
ROBERT BIANCHINIElectrical203/21/2026
MAC ELECTL CONTR INC 001937General Contractor103/22/2026
VILLAGE P & H NY INCFire Protection107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC62471302/09/2026
JOEL PHAGOO ,PE, PLLC2416209/09/2022
Building Lifecycle
All (177)Filed (20)Permit Issued (14)Signed Off (10)Violation (12)Inspection (11)Objection (80)Special Inspection (30)
07/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/06/2026
Special inspection requirement — Air barrier - visual inspection
Sunil Saigal
03/06/2026
Special inspection requirement — Fenestration areas
Sunil Saigal
03/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Sunil Saigal
03/06/2026
Special inspection requirement — Lighting controls
Sunil Saigal
03/06/2026
Special inspection requirement — Insulation placement and R values
Sunil Saigal
03/06/2026
Special inspection requirement — Electrical motors and elevators
Sunil Saigal
03/06/2026
Special inspection requirement — Fenestration air leakage
Sunil Saigal
03/06/2026
Special inspection requirement — Interior lighting power
Sunil Saigal
03/06/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
03/06/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
03/06/2026
Special inspection requirement — Metering
Younes Abouyaala
03/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Sunil Saigal
03/06/2026
Special inspection requirement — Exterior lighting power
Sunil Saigal
03/06/2026
Special inspection requirement — Lighting in dwelling units
Sunil Saigal
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
03/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Sunil Saigal
02/25/2026
Objection resolved — Addressed
02/17/2026
Objection raised — Other
02/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-A1
02/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Sunil Saigal
02/09/2026
Special inspection requirement — Fenestration air leakage
Sunil Saigal
02/09/2026
Special inspection requirement — Air barrier - visual inspection
Sunil Saigal
02/09/2026
Special inspection requirement — Fenestration areas
Sunil Saigal
02/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Sunil Saigal
02/09/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
02/09/2026
Special inspection requirement — Lighting controls
Sunil Saigal
02/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Sunil Saigal
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
02/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
02/09/2026
Special inspection requirement — Metering
Younes Abouyaala
02/09/2026
Special inspection requirement — Interior lighting power
Sunil Saigal
02/09/2026
Special inspection requirement — Exterior lighting power
Sunil Saigal
01/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-S5
10/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/16/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-S4
11/15/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-S3
09/26/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-S2
09/26/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-S7
09/26/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-S9
09/19/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/29/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-P7
07/14/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-P6
06/28/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
06/16/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
06/16/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/09/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/26/2023
Permit issued — Sprinklers
B00599176-S9-EW-SP
05/24/2023
Permit issued — Mechanical Systems
B00599176-S4-MS
05/23/2023
Permit issued — Curb Cut
B00599176-S7-CC
05/21/2023
Permit issued — General Construction
B00599176-I1-GC
05/18/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY FENCE AS PER PLANS. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00698021-I1
03/21/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION ON ADJACENT PROPERTY ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
B00771594-I1
03/21/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 5 STORY RESIDENTIAL BUILDING
B00599176-P5
03/06/2023
Signed off — Alteration
B00697701-I1
03/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AND NEEDLE BEAM PLATFORM AS PER PLANS. PIPE SCAFFOLD AND NEEDLE BEAM PLATFORM SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00748915-I1
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC05/26/2023
DOB NOWMechanical SystemsSigned-offAVESTA BUILDERS INC05/24/2023
DOB NOWCurb CutSigned-offAVESTA BUILDERS INC05/23/2023
DOB NOWGeneral ConstructionPermit IssuedAVESTA BUILDERS INC05/21/2023
DOB NOWGeneral ConstructionPermit IssuedAVESTA BUILDERS INC01/27/2023
DOB NOWGeneral ConstructionPermit IssuedHD BUILDERS NY LLC12/16/2022
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC08/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offMNK ENTERPRISES LLC07/11/2022
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES LLC07/05/2022
DOB NOWFoundationSigned-offHD BUILDERS NY LLC05/13/2022
DOB NOWGeneral ConstructionPermit IssuedHD BUILDERS NY LLC04/26/2022
DOB NOWStructuralSigned-offHD BUILDERS NY LLC04/25/2022
DOB NOWConstruction FenceSigned-offMNK ENTERPRISES LLC03/16/2022
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC03/16/2022
1 project · most recent 02/09/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/09/2026Signed-offAVESTA BUILDERS INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ HEAT PUMP 24,000 BTU · Vrf Outdoor ×24
MXZ SERIES HEAT PUMP 20,000 BTU · Vrf Outdoor ×8
MXZ-SM42NAMHZ-U1 42,000 BTU · Vrf Outdoor ×2
Heating
A.O. Smith As per plans 40,000 BTU · Water Heater ×16
Ventilation
Renewaire HE3XRT 1,750 CFM · Erv ×1
Carrier 62XR SERIES 107,000 BTU ×1
1 project · most recent 02/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/09/2026Signed-offVILLAGE P & H NY INCGas, Storm, Water/Sanitary
4 projects · most recent 06/26/2025
General Wiring
FiledStatusContractorScope
06/26/2025CompleteMAC ELECT'L CONTR. INC.General Wiring
05/23/2022CompleteSTAR ELEC'L CONTRACTORS C—
03/22/2022CompleteK.N.C ELECTRIC INC—
09/03/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
1 project · most recent 02/09/2026
Concrete
FiledStatusContractorScope
02/09/2026Signed-offVILLAGE P & H NY INCConcrete
1 project · most recent 02/09/2026
Fence
FiledStatusContractorScope
02/09/2026Signed-offVILLAGE P & H NY INCFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/28/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
06/16/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
03/06/2026Lighting in dwelling unitsSunil Saigalenergy_progress
03/06/2026Exterior lighting powerSunil Saigalenergy_progress
03/06/2026Fenestration and door U-factor and product ratingsSunil Saigalenergy_progress
03/06/2026Insulation placement and R valuesSunil Saigalenergy_progress
03/06/2026Electrical motors and elevatorsSunil Saigalenergy_progress
03/06/2026Energy Code Compliance InspectionsSunil Saigalprogress
03/06/2026Fire-Resistance Rated ConstructionSunil Saigalprogress
03/06/2026Fire-Resistant Penetrations and JointsSunil Saigalspecial
03/06/2026Exterior Insulation and Finish Systems (EIFS)Sunil Saigalspecial
03/06/2026Maintenance informationYounes Abouyaalaenergy_progress
03/06/2026MeteringYounes Abouyaalaenergy_progress
03/06/2026Fenestration air leakageSunil Saigalenergy_progress
03/06/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
03/06/2026Interior lighting powerSunil Saigalenergy_progress
03/06/2026Fenestration areasSunil Saigalenergy_progress
03/06/2026Air barrier - visual inspectionSunil Saigalenergy_progress
03/06/2026Lighting controlsSunil Saigalenergy_progress
02/09/2026Fenestration air leakageSunil Saigalenergy_progress
02/09/2026Interior lighting powerSunil Saigalenergy_progress
02/09/2026Fire-Resistance Rated ConstructionSunil Saigalprogress
02/09/2026Energy Code Compliance InspectionsSunil Saigalprogress
02/09/2026Fire-Resistant Penetrations and JointsSunil Saigalspecial
02/09/2026Exterior Insulation and Finish Systems (EIFS)Sunil Saigalspecial
02/09/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
02/09/2026Lighting in dwelling unitsSunil Saigalenergy_progress
Latest 25 of 121.
▾Documents — 165 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/30/2026B00697701-I1Request digital key ↗
08/30/2026B00698021-I1Request digital key ↗
08/29/2026B00748915-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
03/09/2023322160371Open ↗
05/17/2022340830042Open ↗
05/10/2022340830042Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/10/2022340830042Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
06/12/2023340830042Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00599176-I1Open ↗
08/13/2026B00599176-P1Open ↗
08/13/2026B00599176-A1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00599176-I1Open ↗
08/13/2026B00599176-P1Open ↗
08/13/2026B00599176-A1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/21/2023322160371Open ↗
05/10/2022340830042Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/21/2023322160371Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/21/2023322160371Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00599176-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/29/2026B00748915-I1Open ↗
08/18/2026B00599176-S4Open ↗
08/18/2026B00599176-A1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/06/2026B00599176-P7Open ↗
09/06/2026B00599176-P7Open ↗
09/01/2026B00599176-P6Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/06/2026B00599176-P7Open ↗
09/01/2026B00599176-P6Open ↗
09/01/2026B00599176-S2Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/10/2022340830042Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/10/2022340830042Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00599176-I1Open ↗
08/13/2026B00599176-P1Open ↗
08/13/2026B00599176-A1Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST2
07/12/2022340830042Open ↗
05/10/2022340830042Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/12/2022340830042Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/12/2022340830042Open ↗
▸BISSTREET TREE SIGNOFF1
06/09/2023340830042Open ↗
▸BISSTREET TREES SITE PLAN1
05/10/2022340830042Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00599176-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00599176-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00599176-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/18/2026B00599176-P7Open ↗
08/18/2026B00599176-P6Open ↗
08/18/2026B00599176-P5Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/10/2022340830042Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00599176-S5Open ↗
08/13/2026B00599176-S4Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00599176-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/21/2023322160371Open ↗
03/21/2023322160371Open ↗
03/21/2023322160371Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
06/14/2023340830042Open ↗
06/12/2023340830042Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
06/12/2023340830042Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
06/14/2023340830042Open ↗
07/07/2022340830042Open ↗
05/10/2022340830042Open ↗
▸BISEFILING COVER SHEET1
03/09/2023322160371Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/10/2022340830042Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00748915-P1Open ↗
▸Other Documents24
▸DOB NOWProperty Ownership Certification6
08/18/2026B00599176-P6Open ↗
08/18/2026B00599176-S5Open ↗
08/18/2026B00599176-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
06/14/2023340830042Open ↗
06/14/2023340830042Open ↗
06/12/2023340830042Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B00599176-P1Open ↗
08/13/2026B00599176-I1Open ↗
08/13/2026B00599176-A1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00599176-P1Open ↗
08/13/2026B00599176-A1Open ↗
08/13/2026B00599176-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/09/2023322160371Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/21/2023322160371Open ↗
▸BISPLOT DIAGRAM1
03/21/2023322160371Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/12/2023340830042Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
03/21/2023322160371Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00599176-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00599176-S3Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00599176-I1Open ↗