Two family frame
114 LEXINGTON AVENUE
STATEN ISLAND · Port Richmond · BIN 5024604
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R3AZoning
1,919 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family frame · 2,500 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic1 filing · 8 docs
Cellar1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Wei Studio207/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JP & Son ElectricElectrical103/22/2026
Timing Construction Team*General Contractor107/09/2026
American Standard P&H CororpPlumbing107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Wei Studio7998207/02/2026
Building Lifecycle
10/16/2026
Closed: Work at cellar and attic level noted; at cellar roughage water and wastelines installed for toilet, sink and shower. At attic level installed water…
DOB violation · closed on the city's record
10/16/2026
Closed: As per DOB records property to be 2 family 2.5 story with attic as ordinary use. At time of inspection at attic level observed full class a…
DOB violation · closed on the city's record
09/23/2026
Signed off — Alteration
GENERAL RENOVATION OF 2-FAMILY HOUSE WITH REMOVE PLUMBING FIXTURES AS PER PLAN. REMOVE ECB VIOLATION # 39113252K, AND 39113253M. AND SUPERSEDE DOB NOW LAA #S01055058-I1.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01424475-S1
09/23/2026
Signed off — Alteration
GENERAL RENOVATION OF 2-FAMILY HOUSE WITH REMOVE PLUMBING FIXTURES AS PER PLAN. REMOVE ECB VIOLATION # 39113252K, AND 39113253M. AND SUPERSEDE DOB NOW LAA #S01055058-I1.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01424475-I1
07/07/2026
Permit issued — General Construction
S01424475-I1-GC
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTiming Construction Team*07/07/2026
1 project · most recent 07/02/2026
Water/Sanitary
FiledStatusContractorScope
07/02/2026——Water/Sanitary
3 projects · most recent 05/22/2024
General Wiring
FiledStatusContractorScope
05/22/2024Permit IssuedJP & Son ElectricGeneral Wiring
05/22/2024Permit IssuedJP & Son Electric—
05/17/2018Permit IssuedHigh Beam Electric—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsRuoyu Weispecial
06/30/2026Energy Code Compliance InspectionsRuoyu Weiprogress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account