← Back
BuildNYC
Two family frame
114 PLEASANT PLAINS AVENUE
STATEN ISLAND · BIN 5177207
💬 Discuss this project
2013Year Built
2Stories
B2Building Class
R3XZoning
2,922 sfGross Floor Area
2Units
Two family frame · 5,821 sf lot · 0.5 FAR built
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 2Installation of new fire sprinkler systemUnder Construction6p · 2 filings · 20 docs
Floor 1Installation of new fire sprinkler systemUnder Construction6p · 2 filings · 20 docs
BasementUnder Construction4p · 1 filing · 20 docs
Sub-BasementInstallation of new fire sprinkler systemUnder Construction1p · 1 filing · 2 docs
Site & exteriorTemporary construction fence installationUnder Construction3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Metal Warehouse Holdings203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Think Design Architecture609/11/2026
A Tech Engineering NYC105/15/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Think Design Architecture303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Duo Plumbing & HeatingPlumbing211/07/2026
Stout HomesGeneral Contractor107/02/2026
Stout HomesScaffold108/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738101/16/2026
Building Lifecycle
10/14/2026
Permit issued — Plumbing
S01385125-I1-PL
09/11/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF 8'-0' HIGH TEMPORARY CONSTRUCTION FENCE AROUND LOTS 185, 85, 84, 83, 82 and 81. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION
S01264127-P1
08/28/2026
Permit issued — Construction Fence
S01264127-I1-FN
08/19/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDuo Plumbing & Heating10/14/2026
DOB NOWConstruction FencePermit IssuedStout Homes08/28/2026
DOB NOWPlumbingPermit IssuedDuo Plumbing & Heating07/07/2026
DOB NOWFoundationPermit IssuedStout Homes06/30/2026
2 projects · most recent 03/27/2026
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScope
03/27/2026Permit IssuedStout HomesHeating and Air Conditioning Systems, Ventilation Systems
08/19/2025——Ventilation Systems
3 projects · most recent 05/15/2026
Water/Sanitary Storm Plumbing-Sprinkler
FiledStatusContractorScope
05/15/2026Permit IssuedDuo Plumbing & HeatingPlumbing-Sprinkler, Water/Sanitary
03/27/2026Permit IssuedDuo Plumbing & HeatingStorm, Water/Sanitary
08/19/2025——Storm, Water/Sanitary
1 project · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026Permit IssuedLMS ElectricalGeneral Wiring
2 projects · most recent 03/27/2026
Wood Concrete
FiledStatusContractorScope
03/27/2026Permit IssuedDuo Plumbing & HeatingConcrete, Wood
08/19/2025——Wood
1 project · most recent 09/11/2026
Fence
FiledStatusContractorScope
09/11/2026Permit IssuedStout HomesFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/19/2026Pass-Final PL - UndergroundPassView ↗
08/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
01/09/2026Concrete - Cast-In-Placeanthony santorospecial
01/09/2026Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
01/09/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
01/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
01/09/2026Subgrade Inspectionsanthony santorospecial
01/09/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
01/09/2026Mechanical Systemsanthony santorospecial
01/09/2026Energy Code Compliance Inspectionsanthony santoroprogress
01/09/2026Fire-Resistance Rated Constructionanthony santoroprogress
01/09/2026Structural Wood Frameanthony santoroprogress
01/09/2026Finalanthony santoroprogress
01/09/2026Footing and Foundationanthony santoroprogress
01/09/2026Air barrier — testing anthony santoroenergy_progress
01/09/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
01/09/2026Permanent certificateanthony santoroenergy_progress
01/09/2026Fenestration air leakageanthony santoroenergy_progress
01/09/2026Air barrier - visual inspectionanthony santoroenergy_progress
01/09/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
01/09/2026Protection of exposed foundation insulationanthony santoroenergy_progress
01/09/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
01/09/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
01/09/2026Insulation placement and R valuesanthony santoroenergy_progress
01/09/2026Ventilation and air distribution systemanthony santoroenergy_progress
01/09/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
01/09/2026Interior lighting poweranthony santoroenergy_progress
Latest 25 of 29.
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account