Public elementary, junior or senior high
Public School 67
114 WEST 46 STREET · BIN 1069583
💬 Discuss this project
1894Year Built
5Stories
W1Building Class
C6-5.5Zoning
54,649 sfGross Floor Area
1Units
LL97 Covered13 Open Violations 6 unresolved · 7 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 17,180 sf lot · 3.18 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 4 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCSCA3209/13/2026
NYC DEPARTMENT OF EDUCATION603/22/2026
DEPARTMENT OF EDUCATION203/22/2026
D.O.E. J. ONASSIS H.S. 0603/22/2026
DOE JK ONASSIS HS 040403/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
DOE 040103/22/2026
M 486 B.O.E. HIGH SCHOOL103/22/2026
BOARD OF EDUCATION 040103/22/2026
CITY OF NY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DSENY ENGINEERING SERVICES1203/21/2026
SBLM503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEL-TECH CONSTRUCTION INCGeneral Contractor707/08/2026
BRIAN CHEBUSKEElectrical103/21/2026
EVS ELECTRIC CORPElectrical103/22/2026
JOSHUA ANDERSONElectrical103/21/2026
MULTI-PHASE ELEC'L SVCSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KS ENGINEERS, P.C.7715304/20/2026
20/20 INSPECTIONS INC1471712/22/2025
JPC LOGISTICS DBA JPCL EN351203/27/2023
Building Lifecycle
All (135)Filed (16)Permit Issued (7)Signed Off (5)Violation (60)Inspection (1)Objection (16)Special Inspection (30)
06/22/2026
Violation issued (ECB, open)
Construction
06/22/2026
Violation issued (ECB, open)
Construction
06/22/2026
Violation issued (ECB, open)
Construction
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Mohamed Shahid
04/21/2026
Special inspection requirement — Maintenance information
Mohamed Shahid
04/21/2026
Special inspection requirement — Lighting controls
Mohamed Shahid
04/21/2026
Special inspection requirement — Interior lighting power
Mohamed Shahid
04/20/2026
Filed — Alteration
Replace light fixtures
M00975976-P2
04/16/2026
Special inspection requirement — Maintenance information
Mohamed Shahid
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Mohamed Shahid
04/16/2026
Special inspection requirement — Lighting controls
Mohamed Shahid
04/16/2026
Special inspection requirement — Interior lighting power
Mohamed Shahid
02/24/2026
Objection resolved — Addressed
02/11/2026
Signed off — Alteration
SOUTH WALL EMERGENCY REPAIR WORK - FILING HEREWITH FOR THE EMERGENCY REPAIRS OF THE EXISTING BUILDING. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M00916632-S1
02/11/2026
Signed off — Alteration
SOUTH WALL EMERGENCY REPAIR WORK - FILING HEREWITH FOR THE EMERGENCY REPAIRS OF THE EXISTING BUILDING. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M00916632-I1
02/11/2026
Objection raised — Other
02/10/2026
Signed off — Alteration
SF/JK ONASSIS - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED WITH DOB # M00916632, .NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00705534-I1
02/10/2026
Filed — Alteration
Replace light fixtures
M00975976-P1
02/10/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/06/2026
Special inspection requirement — Interior lighting power
Mohamed Shahid
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
02/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Mohamed Shahid
02/06/2026
Special inspection requirement — Maintenance information
Mohamed Shahid
02/06/2026
Special inspection requirement — Lighting controls
Mohamed Shahid
01/09/2026
Permit issued — Structural
M00916632-S1-ST
12/29/2025
Special inspection requirement — Final
JACOB HAAS
12/29/2025
Special inspection requirement — Masonry
JACOB HAAS
12/29/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
12/23/2025
Violation issued (ECB, open)
Elevators
12/22/2025
Filed — Alteration
SOUTH WALL EMERGENCY REPAIR WORK - FILING HEREWITH FOR THE EMERGENCY REPAIRS OF THE EXISTING BUILDING. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M00916632-P2
12/11/2025
Filed — Alteration
SOUTH WALL EMERGENCY REPAIR WORK - FILING HEREWITH FOR THE EMERGENCY REPAIRS OF THE EXISTING BUILDING. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M00916632-P3
12/04/2025
Signed off — Alteration
FN/JK ONASSIS - FOR TEMPORARY CONSTRUCTION EQUIPMENT (FENCE)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED WITH DOB # M00916632, .NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00801524-I1
12/04/2025
Signed off — Alteration
SH/JK ONASSIS - FOR TEMPORARY CONSTRUCTION EQUIPMENT ( SHED)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED WITH DOB # M00916632, .NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00705544-I1
11/03/2025
Special inspection requirement — Masonry
JACOB HAAS
11/03/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
11/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
09/30/2025
Permit issued — General Construction
M00916632-I1-GC
09/25/2025
Filed — Alteration
SOUTH WALL EMERGENCY REPAIR WORK - FILING HEREWITH FOR THE EMERGENCY REPAIRS OF THE EXISTING BUILDING. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M00916632-P1
09/23/2025
Special inspection requirement — Masonry
JACOB HAAS
09/23/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
09/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
09/23/2025
Special inspection requirement — Masonry
JACOB HAAS
09/23/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
09/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
09/23/2025
Special inspection requirement — Final
JACOB HAAS
08/15/2025
Permit issued — Construction Fence
M00801524-I1-FN
08/13/2025
Permit issued — Sidewalk Shed
M00705544-I1-SH
07/29/2025
Objection resolved — Addressed
07/11/2025
Violation issued (ECB, open)
Construction
07/11/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Objection raised — Other
05/12/2025
Filed — Alteration
SF/JK ONASSIS - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED WITH DOB # M00916632, .NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00705534-P1
01/23/2025
Permit issued — Supported Scaffold
M00705534-I1-SF
01/08/2025
Filed — Alteration
SH/JK ONASSIS - FOR TEMPORARY CONSTRUCTION EQUIPMENT ( SHED)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED WITH DOB # M00916632, .NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00705544-P1
01/08/2025
Filed — Alteration
FN/JK ONASSIS - FOR TEMPORARY CONSTRUCTION EQUIPMENT (FENCE)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED WITH DOB # M00916632, .NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00801524-P1
10/18/2024
Violation issued (ECB, open)
Elevators
10/18/2024
Violation issued (ECB, open)
Elevators
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offKEL-TECH CONSTRUCTION INC01/09/2026
DOB NOWGeneral ConstructionSigned-offKEL-TECH CONSTRUCTION INC09/30/2025
DOB NOWConstruction FenceSigned-offKEL-TECH CONSTRUCTION INC08/15/2025
DOB NOWSidewalk ShedSigned-offKEL-TECH CONSTRUCTION INC08/13/2025
DOB NOWSupported ScaffoldSigned-offKEL-TECH CONSTRUCTION INC01/23/2025
DOB NOWSidewalk ShedSigned-offKEL-TECH CONSTRUCTION INC08/20/2024
DOB NOWConstruction FenceSigned-offKEL-TECH CONSTRUCTION INC08/15/2024
BISOTISSUEDWDF INC06/09/2022
BISMHISSUEDWDF INC06/01/2020
BISOTISSUEDWDF INC06/05/2019
BISMHISSUEDWDF INC12/07/2018
BISMHISSUEDCHAPMAN & EVANS CONTRACT01/29/2013
BISEQISSUEDATLANTIC HOISTING & SCAFF01/04/2013
BISOTISSUEDDEBORAH BRADLEY CONS & MG12/18/2012
BISOTISSUEDSAFECON BUILDERS CORP11/20/2012
BISPLISSUEDATLANTIS PLBG&HTG CORP07/02/2012
BISOTISSUEDSAFECON BUILDERS CORP06/25/2012
BISMHISSUEDCHAPMAN & EVANS CONTRACT05/29/2012
BISOTISSUEDSAI SERVICE INC05/25/2012
BISOTISSUEDDEBORAH BRADLEY CONS & MG04/05/2012
BISPLISSUEDVARSITY PLBG AND HTG INC04/02/2012
BISEQISSUEDATLANTIC HOISTING & SCAFF03/06/2012
BISOTISSUEDSAI SERVICE INC03/02/2012
BISEQISSUEDATLANTIC HOISTING & SCAFF04/13/2011
BISEQISSUEDATLANTIC HOISTING&SCAFFOL01/04/2011
BISEQISSUEDMETROPOLITAN ENTERPR INC10/21/2009
BISPLISSUEDVARSITY PLBG AND HTG INC02/05/2009
BISOTISSUEDLO SARDO GENERAL CONTRACTORS01/16/2009
BISOTISSUEDLO SARDO GENERAL CONTRACTORS01/16/2009
BISPLISSUEDBROOK PLUMBING & HTG CORP11/20/2008
BISOTISSUEDVARDARIS TECH INCORPORATED10/24/2008
BISEQISSUEDVARDARIS TECH INCORPORATED10/24/2008
BISEQISSUEDMETROPOLITAN ENTERPRISES INC10/21/2008
BISOTISSUEDDEBORAH BRADLEY CONSTRUCTION10/16/2008
BISMHISSUEDM&J MECHANICAL CORPORATION10/16/2008
BISSPISSUEDLEVIATHAN MECHANICAL CORP05/05/2008
BISPLISSUEDVARSITY PLBG AND HTG INC01/22/2008
BISOTRE-ISSUEDLO SARDO GENERAL CONTRACTORS INC08/08/2007
BISOTISSUEDLO SARDO GENERAL CONTRACTORS INC08/08/2007
BISSPISSUEDCHARLES A DIMINO INCORPORATED09/27/2006
+ 15 more permits on file
10 projects · most recent 01/13/2025
General Wiring Lighting
FiledStatusContractorScope
01/13/2025CompleteSUNRISE ELEC'L SERVICESLighting
12/05/2024Permit IssuedJ.H.I. ELECTRIC LLCGeneral Wiring
08/19/2024Permit IssuedSTANCO SYSTEM ELEC'L CONT—
10/25/2023CompleteEVS ELECTRIC CORPGeneral Wiring
06/02/2023CompleteGEMINI ELECTRIC CO., INC.—
06/27/2022Permit IssuedP.S. MARCATO ELEV. CO INC—
03/31/2022CompleteMAC FHIONNGHAILE & SONS—
01/06/2022CompleteMULTI-PHASE ELEC'L SVCSGeneral Wiring
05/15/2019Permit IssuedVERDE ELECTRIC CORP.General Wiring
06/28/2018CompleteBARTH-GROSS ELEC. CO., INGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/10/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/21/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
04/21/2026Energy Code Compliance InspectionsMohamed Shahidprogress
04/21/2026Maintenance informationMohamed Shahidenergy_progress
04/21/2026Lighting controlsMohamed Shahidenergy_progress
04/21/2026Interior lighting powerMohamed Shahidenergy_progress
04/16/2026Maintenance informationMohamed Shahidenergy_progress
04/16/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
04/16/2026Energy Code Compliance InspectionsMohamed Shahidprogress
04/16/2026Lighting controlsMohamed Shahidenergy_progress
04/16/2026Interior lighting powerMohamed Shahidenergy_progress
02/06/2026Interior lighting powerMohamed Shahidenergy_progress
02/06/2026Fire-Resistant Penetrations and JointsMohamed Shahidspecial
02/06/2026Energy Code Compliance InspectionsMohamed Shahidprogress
02/06/2026Maintenance informationMohamed Shahidenergy_progress
02/06/2026Lighting controlsMohamed Shahidenergy_progress
12/29/2025FinalJACOB HAASprogress
12/29/2025MasonryJACOB HAASspecial
12/29/2025Post-installed AnchorsJACOB HAASspecial
12/29/2025Structural Stability – Alterations of existing buildingsJACOB HAASspecial
11/03/2025MasonryJACOB HAASspecial
11/03/2025Post-installed AnchorsJACOB HAASspecial
11/03/2025Structural Stability – Alterations of existing buildingsJACOB HAASspecial
09/23/2025MasonryJACOB HAASspecial
09/23/2025Post-installed AnchorsJACOB HAASspecial
09/23/2025Structural Stability – Alterations of existing buildingsJACOB HAASspecial
Latest 25 of 32.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.K. OnassisEducation—
Project M00975976 Alteration · Approved · 12/13/2023
Jk Onassis HsEducation—
Project M00705544 Alteration · LOC Issued · 12/20/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/31/2026M00845103-I1Request digital key ↗
08/25/2026M00705544-P1Request digital key ↗
08/25/2026M00801524-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit6
08/13/2026M00916632-P1Open ↗
08/13/2026M00916632-P2Open ↗
08/13/2026M00916632-P3Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/12/2011120566315Open ↗
08/11/2011120566315Open ↗
08/03/2011120566315Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
03/14/2012120566315Open ↗
04/18/2011120566315Open ↗
01/05/2011120566315Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/31/2026M00845103-I1Open ↗
08/25/2026M00705544-P1Open ↗
08/25/2026M00705544-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/22/2026M00975976-P1Open ↗
09/01/2026M00975976-I1Open ↗
09/01/2026M00916632-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/22/2026M00975976-P1Open ↗
09/22/2026M00975976-P1Open ↗
09/01/2026M00975976-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/28/2018120566315Open ↗
01/05/2011120566315Open ↗
08/03/2011120566315Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/03/2011120566315Open ↗
01/05/2011120566315Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/03/2011120566315Open ↗
01/05/2011120566315Open ↗
▸Safety & Tenant Protection6
▸DOB NOWNYCSCA - Approved Site Safety Plans6
08/13/2026M00801524-I1Open ↗
08/13/2026M00801524-P1Open ↗
08/13/2026M00705534-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/21/2026M00916632-I1Open ↗
08/21/2026M00916632-S1Open ↗
08/21/2026M00916632-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
08/03/2011120566315Open ↗
01/05/2011120566315Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026M00975976-I1Open ↗
08/17/2026M00975976-P2Open ↗
▸Approvals, Objections & Sign-offs39
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/31/2026M00845103-I1Open ↗
08/25/2026M00705544-P1Open ↗
08/25/2026M00801524-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/17/2026M00975976-P2Open ↗
08/13/2026M00705544-I1Open ↗
08/13/2026M00801524-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026M00705534-I1Open ↗
08/13/2026M00705544-I1Open ↗
08/13/2026M00801524-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/05/2011120566315Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/28/2018120566315Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
08/11/2011120566315Open ↗
01/05/2011120566315Open ↗
▸BISBOROUGH INTAKE FORM1
08/28/2018120566315Open ↗
▸BISEFILING COVER SHEET1
01/05/2011120566315Open ↗
▸Other Documents20
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
08/17/2026M00975976-P2Open ↗
08/13/2026M00801524-I1Open ↗
08/13/2026M00705544-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWNYCSCA Exhibit 25
08/13/2026M00705544-I1Open ↗
08/13/2026M00801524-I1Open ↗
08/13/2026M00916632-S1Open ↗
Showing 3 of 5 on file for this type