Columbia University Main Campus
1140 AMSTERDAM AVENUE · Morningside Heights · BIN 1082159
💬 Discuss this project
1901Year Built
7Stories
W6Building Class
R8Zoning
1,368,870 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 1 unresolved · 1 paperwork only ▸
Other college and university · Owner of record: Columbia University · 734,180 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofColumbia University Main Campus1p · 1 filing · 3 docs
Floor 7Columbia University Main Campus19p · 2 filings · 14 docs
Floor 6Columbia University Main Campus19p · 2 filings · 14 docs
Floor 5Columbia University Main Campus19p · 2 filings · 14 docs
Floor 4Columbia University Main CampusUnder Construction27p · 3 filings · 17 docs
Floor 3Columbia University Main CampusUnder Construction30p · 2 filings · 14 docs
Floor 2Columbia University Main CampusUnder Construction36p · 6 filings · 17 docs
Floor 1Columbia University Main CampusUnder Construction53p · 6 filings · 17 docs
MezzanineColumbia University Main CampusUnder Construction32p · 4 filings · 17 docs
Site & exteriorColumbia University Main Campus32p · 5 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Columbia University4810/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dennis Kim103/21/2026
Renaissance Code Consultants403/21/2026
Synergy Building Consultants403/21/2026
Outsource Consultants603/21/2026
Rigid Structural Design603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPK/Lewis ConstructionGeneral Contractor509/01/2026
Manengeering BureauFire Protection408/18/2026
Ceprine ConstructionScaffold407/08/2026
Matros Automated ElectricalElectrical303/21/2026
Manengeering BureauPlumbing303/22/2026
Siteworks Contracting Co*General Contractor203/21/2026
Par Plumbing CoPlumbing108/30/2026
Sega ContractingGeneral Contractor106/28/2026
Greenway USAGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544505/15/2026
Outsource Special Inspection2827404/02/2026
Cole Technologies/Control1290110/08/2020
Building Lifecycle
All (142)Filed (25)Permit Issued (17)Signed Off (8)Violation (54)Inspection (2)Objection (6)Special Inspection (30)
08/31/2026
Permit issued — Structural
M01364932-S1-ST
08/27/2026
Permit issued — Plumbing
M01364336-S2-PL
08/27/2026
Permit issued — General Construction
M01364336-I1-GC
08/17/2026
Permit issued — Sprinklers
M01364336-S3-EW-SP
06/23/2026
Signed off — Alteration
Repairs within existing below grade utility tunnel including concrete rehabilitation including concrete removal and patching, reinforcement repair/replacement, and recoating of existing steel elements. No changes to use, occupancy, or structural configure
M01400348-I1
05/26/2026
Permit issued — General Construction
M01364932-I1-GC
05/26/2026
Special inspection requirement — Final
JONAR MADRIAGA
05/20/2026
Filed — Alteration
INTERIOR RENOVATION AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
M01364932-P1
05/20/2026
Permit issued — General Construction
M01400348-I1-GC
05/15/2026
Filed — Alteration
Repairs within existing below grade utility tunnel including concrete rehabilitation including concrete removal and patching, reinforcement repair/replacement, and recoating of existing steel elements. No changes to use, occupancy, or structural configure
M01400348-I1
04/10/2026
Objection raised — Other
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection raised — Other
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection raised — Structural
04/10/2026
Objection resolved — Resolved
04/08/2026
Permit issued — Sprinklers
M01364336-S3-EW-SP
04/03/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
04/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
04/03/2026
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
04/02/2026
Filed — Alteration
ADDITION AND MODIFICATION TO EXSITING SPRINKLER SYSTEM AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE
M01364336-P1
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
04/01/2026
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
04/01/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
03/20/2026
Filed — Alteration
ADDITION AND MODIFICATION TO EXSITING SPRINKLER SYSTEM AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE
M01364336-S3
03/20/2026
Filed — Alteration
ADDITION AND MODIFICATION TO EXSITING SPRINKLER SYSTEM AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE
M01364336-S2
03/19/2026
Filed — Alteration
INTERIOR RENOVATION AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
M01364932-I1
03/19/2026
Filed — Alteration
ADDITION AND MODIFICATION TO EXSITING SPRINKLER SYSTEM AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE
M01364336-S4
03/19/2026
Filed — Alteration
INTERIOR RENOVATION AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
M01364932-S1
03/19/2026
Filed — Alteration
ADDITION AND MODIFICATION TO EXSITING SPRINKLER SYSTEM AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE
M01364336-I1
03/16/2026
Permit issued — Mechanical Systems
M01370044-I1-MS
03/16/2026
Special inspection requirement — Lighting controls
JONAR MADRIAGA
03/16/2026
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
03/16/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
03/16/2026
Special inspection requirement — Structural Steel - High Strength Bolting
JONAR MADRIAGA
03/16/2026
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
03/16/2026
Special inspection requirement — Final
JONAR MADRIAGA
03/16/2026
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
03/13/2026
Filed — Alteration
M01370044-I1
03/10/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
03/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Electrical motors and elevators
EUGENE BIFULCO
03/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
02/26/2026
Special inspection requirement — Final
JONAR MADRIAGA
07/03/2024
Signed off — Alteration
INSTALLATION OF VOLUNTARY NEW SPRINKLER SYSTEM AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00877961-I1
06/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/25/2024
Signed off — Alteration
GENERAL CONSTRUCTION AS SHOWN ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00891292-I1
03/11/2024
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
03/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/11/2024
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
03/05/2024
Filed — Alteration
INSTALLATION OF VOLUNTARY NEW SPRINKLER SYSTEM AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00877961-P1
02/15/2024
Signed off — Alteration
M00956509-I1
01/29/2024
Signed off — Alteration
M00874547-I1
01/25/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00874543-I1
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSPK/Lewis Construction08/31/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co08/27/2026
DOB NOWGeneral ConstructionPermit IssuedSPK/Lewis Construction08/27/2026
DOB NOWSprinklersPermit IssuedManengeering Bureau08/17/2026
DOB NOWGeneral ConstructionPermit IssuedSPK/Lewis Construction05/26/2026
DOB NOWGeneral ConstructionSigned-offSega Contracting05/20/2026
DOB NOWSprinklersPermit IssuedManengeering Bureau04/08/2026
DOB NOWMechanical SystemsPermit IssuedSPK/Lewis Construction03/16/2026
DOB NOWGeneral ConstructionSigned-offGreenway USA11/08/2023
DOB NOWSprinklersSigned-offManengeering Bureau08/17/2023
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction07/13/2023
DOB NOWSprinklersSigned-offManengeering Bureau07/13/2023
DOB NOWSidewalk ShedSigned-offCeprine Construction05/18/2023
DOB NOWSupported ScaffoldSigned-offCeprine Construction05/18/2023
DOB NOWSidewalk ShedSigned-offCeprine Construction06/16/2022
DOB NOWSupported ScaffoldSigned-offCeprine Construction06/16/2022
DOB NOWStructuralPermit IssuedSiteworks Contracting Co*10/08/2020
BISMHISSUEDH.M. Hughes Co12/10/2020
BISOTISSUEDH.M. Hughes Co12/10/2020
BISOTISSUEDHenry Restoration01/31/2020
BISOTISSUEDHenry Restoration01/29/2020
BISOTISSUEDSiteworks Contracting Co*01/28/2020
BISOTISSUEDH.M. Hughes Co09/06/2019
BISMHISSUEDH.M. Hughes Co09/06/2019
BISMHISSUEDBiltmore General Contractors06/09/2017
BISOTISSUEDBiltmore General Contractors06/09/2017
BISMHISSUEDLegacy Builders/Developers06/29/2016
BISOTISSUEDLegacy Builders/Developers06/29/2016
BISOTISSUEDLegacy Builders/Developers06/29/2016
BISPLISSUEDMega Plumbing12/14/2015
BISOTISSUEDLegacy Builders/Developers12/08/2015
BISMHISSUEDLegacy Builders/Developers12/08/2015
BISOTISSUEDLegacy Builders/Developers12/08/2015
BISMHISSUEDFresh Meadow Mechanical10/10/2014
BISOTISSUEDSiteworks Contracting Co*01/28/2014
BISOTISSUEDFresh Meadow Mechnical09/23/1999
BISPLISSUEDReem PLG & Heating10/05/1995
BIS—ISSUEDTorcon06/07/1995
BISPLRE-ISSUEDLakeside Technical Plumbing01/25/1995
BISOTISSUEDNAC11/22/1994
+ 12 more permits on file
1 project · most recent 04/02/2026
Sprinkler System
FiledStatusContractorScope
04/02/2026Permit IssuedManengeering BureauSprinkler System
1 project · most recent 04/02/2026
Water/Sanitary
FiledStatusContractorScope
04/02/2026Permit IssuedPar Plumbing CoWater/Sanitary
8 projects · most recent 04/15/2026
General Wiring
FiledStatusContractorScope
04/15/2026Permit IssuedTF ElectricalGeneral Wiring
02/20/2026Permit IssuedMatros Automated ElectricalGeneral Wiring
06/05/2024CompleteR. GunzerGeneral Wiring
06/29/2023CancelledNash Electric Services—
06/01/2023CompleteBorowide Elect'l Contractors—
06/21/2022CompleteBorowide Elect'l Contractors—
06/19/2020Permit IssuedArcadia Elect'l CoGeneral Wiring
01/16/2019Permit IssuedDifazio Electric NYGeneral Wiring
2 projects · most recent 05/20/2026
Steel Concrete
FiledStatusContractorScope
05/20/2026Permit IssuedSPK/Lewis ConstructionSteel
04/02/2026Permit IssuedPar Plumbing CoSteel, Concrete
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
05/26/2026FinalJONAR MADRIAGAprogress
04/03/2026Post-installed AnchorsJONAR MADRIAGAspecial
04/03/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
04/03/2026Sprinkler SystemsJONAR MADRIAGAspecial
04/01/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
04/01/2026Sprinkler SystemsJONAR MADRIAGAspecial
04/01/2026Post-installed AnchorsJONAR MADRIAGAspecial
03/16/2026Lighting controlsJONAR MADRIAGAenergy_progress
03/16/2026Structural Steel - DetailsJONAR MADRIAGAspecial
03/16/2026Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
03/16/2026Post-installed AnchorsJONAR MADRIAGAspecial
03/16/2026Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
03/16/2026Structural Steel - WeldingJONAR MADRIAGAspecial
03/16/2026FinalJONAR MADRIAGAprogress
03/16/2026Interior lighting powerJONAR MADRIAGAenergy_progress
03/10/2026FinalEUGENE BIFULCOprogress
03/10/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
03/10/2026Maintenance informationEUGENE BIFULCOenergy_progress
03/10/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
03/10/2026Mechanical SystemsEUGENE BIFULCOspecial
03/10/2026Electrical motors and elevatorsEUGENE BIFULCOenergy_progress
03/10/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
03/10/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
02/26/2026FinalJONAR MADRIAGAprogress
03/11/2024Post-installed AnchorsEUGENE BIFULCOspecial
Latest 25 of 39.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Columbia University Main CampusEducationEntire building
Project M01400348 Alteration · LOC Issued · 05/15/2026
Project M01364336 Alteration · Permit Entire · 03/19/2026
Project M01364932 Alteration · Permit Entire · 03/19/2026
Project M01370044 Alteration · Permit Entire · 03/13/2026
Project M00956509 Alteration · LOC Issued · 11/02/2023
Project M00891292 Alteration · LOC Issued · 06/23/2023
Project M00877961 Alteration · LOC Issued · 05/25/2023
Project M00874543 Alteration · LOC Issued · 05/17/2023
Project M00874547 Alteration · LOC Issued · 05/17/2023
Project M00758574 Alteration · LOC Issued · 06/16/2022
Project M00754409 Alteration · LOC Issued · 06/15/2022
Project M00272671 Alteration · Permit Entire · 10/08/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 300 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch25
09/02/2026M00754409-P1Request digital key ↗
09/02/2026M00754409-I1Request digital key ↗
09/02/2026M00758574-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00272671-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION27
01/30/2020123797702Open ↗
06/06/2019123764630Open ↗
06/06/2019123764630Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION14
02/03/2020123797702Open ↗
01/30/2020123797702Open ↗
01/28/2020123834244Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications98
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
01/30/2020123797702Open ↗
01/30/2020123797702Open ↗
01/30/2020123797702Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/02/2026M00758574-P1Open ↗
09/02/2026M00758574-I1Open ↗
08/31/2026M00877961-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026M01364336-S3Open ↗
09/23/2026M01364336-S3Open ↗
09/23/2026M01364336-S3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/30/2026M00956509-I1Open ↗
09/01/2026M01364932-S1Open ↗
09/01/2026M01364336-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
01/30/2020123797702Open ↗
06/06/2019123764630Open ↗
04/03/2019123834244Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/06/2019123764630Open ↗
06/06/2019123764630Open ↗
04/03/2019123834244Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/18/2013121843149Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA2
12/02/2020123332107Open ↗
04/10/2018122348325Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/23/2015122340430Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026M00956509-I1Open ↗
08/18/2026M01370044-I1Open ↗
08/18/2026M01364932-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/30/2020123797702Open ↗
09/06/2019123764630Open ↗
04/03/2019123834244Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/13/2019122348325Open ↗
12/30/2015122340430Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/31/2026M00877961-I1Open ↗
08/30/2026M00891292-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
11/18/2013121843149Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
09/06/2019123764630Open ↗
04/03/2019123834244Open ↗
02/19/2019121292564Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/04/2023123797702Open ↗
11/23/2020123834244Open ↗
02/19/2019121292564Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/18/2024123797702Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/18/2024123797702Open ↗
12/04/2023123797702Open ↗
12/04/2023123797702Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/30/2020123797702Open ↗
02/19/2019121292564Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/30/2020123797702Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/22/2024123797702Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
02/19/2019121292564Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/18/2026M01364932-P1Open ↗
08/18/2026M01364336-P2Open ↗
08/17/2026M01400348-I1Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
09/20/2021123332107Open ↗
11/23/2020123834244Open ↗
05/13/2019122348325Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M00891292-I1Open ↗
08/13/2026M00877961-I1Open ↗
▸BISFINAL1
07/18/2024123797702Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
11/23/2020123834244Open ↗
01/30/2020123797702Open ↗
06/06/2019123764630Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/18/2024123797702Open ↗
09/20/2021123332107Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET14
01/30/2020123797702Open ↗
06/06/2019123764630Open ↗
06/06/2019123764630Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION9
09/24/2018121292564Open ↗
08/08/2018121292564Open ↗
03/16/2018121292564Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM6
05/13/2019122348325Open ↗
02/21/2019123332107Open ↗
02/19/2019121292564Open ↗
Showing 3 of 6 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
01/30/2020123797702Open ↗
06/05/2019123764630Open ↗
04/03/2019123834244Open ↗
Showing 3 of 7 on file for this type