← Back
Predominantly retail with other uses
1142 FLATBUSH AVENUE
BROOKLYN · Flatbush · BIN 3118847
💬 Discuss this project
1910Year Built
3Stories
K4Building Class
R7AZoning
3,363 sfGross Floor Area
3Units
44 Open Violations 40 unresolved · 4 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 1142 FLATBUSH SUITES LLC · 2,165 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof4p · 1 filing · 3 docs
Floor 34p · 1 filing · 3 docs
Floor 26p · 2 filings · 20 docs
Floor 14p · 1 filing · 3 docs
Cellar8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TALOTSING3707/08/2026
NEW AMERICAN CONSTRUCTION INC404/09/2026
1142 FLATBUSH SUITES LLC1203/22/2026
1142 FLATBUSH AVE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEVILLE ENGINEERING GROUP1110/19/2022
ANTHONY GENNARO, PE209/07/2022
ENTHINK ENGINEERS LLC102/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SCARANO ARCHITECT2403/21/2026
IMA EXPEDITNG103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKIE LAWRENCEGeneral Contractor807/08/2026
JOE PARZIALE PLUMBING COPlumbing207/08/2026
RM ELECTRIC CO., INC.Electrical103/22/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413510/19/2022
INTERNATIONAL GEOTEHCNICA1795103/29/2022
Building Lifecycle
All (136)Filed (14)Permit Issued (7)Signed Off (1)Violation (55)Inspection (1)Objection (35)Special Inspection (23)
03/03/2026
Violation issued (ECB, open)
Construction
03/03/2026
Violation issued (ECB, open)
Construction
02/27/2026
Signed off — Alteration
B00686690-I1
11/24/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
05/22/2024
Violation issued (ECB, open)
Construction
11/28/2023
Violation issued (HPD, open)
I
08/04/2023
Violation issued (ECB, open)
Construction
07/07/2023
Violation issued (ECB, closed)
Construction
05/17/2023
Violation issued (ECB, open)
Construction
03/03/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/17/2022
Violation issued (HPD, open)
I
10/21/2022
Special inspection requirement — Final
CAESAR BUSTAMANTE
10/19/2022
Filed — Alteration
Proposed restoration of front facade from 2nd floor to roof, including masonry repair and repointing of entire as well as lintel & sill replacement. No change to use, occupancy or egress under this application.
B00696259-P1
10/19/2022
Filed — Alteration
Proposed instal. of new non-bearing partitions, fixtures, finishes, cabinetry & casework, incl. the replacement of exist. fl. joists on all levels, as per plans, & describe the temp. bulkhead at the roof level, filed with #B00694342. No change to u, o. ,e
B00703780-P3
09/07/2022
Filed — Alteration
Proposed instal. of new non-bearing partitions, fixtures, finishes, cabinetry & casework, incl. the replacement of exist. fl. joists on all levels, as per plans, & describe the temp. bulkhead at the roof level, filed with #B00694342. No change to u, o. ,e
B00703780-S2
09/07/2022
Special inspection requirement — Final
09/07/2022
Special inspection requirement — Structural Cold-Formed Steel
09/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/07/2022
Special inspection requirement — Structural Wood Frame
08/17/2022
Filed — Alteration
Proposed instal. of new non-bearing partitions, fixtures, finishes, cabinetry & casework, incl. the replacement of exist. fl. joists on all levels, as per plans, & describe the temp. bulkhead at the roof level, filed with #B00694342. No change to u, o. ,e
B00703780-P2
08/16/2022
Special inspection requirement — Energy Code Compliance Inspections
CAESAR BUSTAMANTE
08/16/2022
Special inspection requirement — Lighting controls
CAESAR BUSTAMANTE
08/16/2022
Special inspection requirement — Lighting in dwelling units
CAESAR BUSTAMANTE
08/16/2022
Special inspection requirement — Final
CAESAR BUSTAMANTE
08/16/2022
Special inspection requirement — Interior lighting power
CAESAR BUSTAMANTE
08/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
08/01/2022
Permit issued — General Construction
B00684387-I1-EA
08/01/2022
Permit issued — Structural
B00684387-I1-ST
08/01/2022
Permit issued — General Construction
B00684387-I1-GC
07/16/2022
Permit issued — Plumbing
B00703863-I1-PL
07/08/2022
Objection raised — Fire_Protection
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Scope
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Structural
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Accessibility
07/08/2022
Objection resolved — Addressed
07/07/2022
Permit issued — General Construction
B00696259-I1-GC
07/01/2022
Filed — Alteration
Proposed instal. of new non-bearing partitions, fixtures, finishes, cabinetry & casework, incl. the replacement of exist. fl. joists on all levels, as per plans, & describe the temp. bulkhead at the roof level, filed with #B00694342. No change to u, o. ,e
B00703780-P1
07/01/2022
Filed — Alteration
B00703863-I1
06/29/2022
Special inspection requirement — Final
CAESAR BUSTAMANTE
06/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
06/29/2022
Special inspection requirement — Energy Code Compliance Inspections
CAESAR BUSTAMANTE
06/29/2022
Special inspection requirement — Lighting in dwelling units
CAESAR BUSTAMANTE
06/29/2022
Special inspection requirement — Interior lighting power
CAESAR BUSTAMANTE
06/29/2022
Special inspection requirement — Lighting controls
CAESAR BUSTAMANTE
05/25/2022
Objection raised — Scope
05/25/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Scope
05/25/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Scope
05/25/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Energy
05/25/2022
Objection resolved — Addressed
05/19/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/18/2022
Permit issued — Plumbing
B00694342-S1-PL
05/18/2022
Violation issued (ECB, open)
Construction
05/18/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAKIE LAWRENCE08/01/2022
DOB NOWStructuralSigned-offAKIE LAWRENCE08/01/2022
DOB NOWGeneral ConstructionPermit IssuedAKIE LAWRENCE08/01/2022
DOB NOWPlumbingPermit IssuedJOE PARZIALE PLUMBING CO07/16/2022
DOB NOWGeneral ConstructionPermit IssuedAKIE LAWRENCE07/07/2022
DOB NOWPlumbingSigned-offJOE PARZIALE PLUMBING CO05/18/2022
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION03/09/2022
1 project · most recent 04/28/2022
Water/Sanitary
FiledStatusContractorScope
04/28/2022Signed-offJOE PARZIALE PLUMBING COWater/Sanitary
2 projects · most recent 04/17/2022
General Wiring
FiledStatusContractorScope
04/17/2022Permit IssuedRM ELECTRIC CO., INC.General Wiring
02/25/2022Permit IssuedRICHARD NEU—
2 projects · most recent 10/19/2022
FiledStatusContractorScope
10/19/2022——1 scope_items
03/29/2022——1 scope_items
1 project · most recent 03/15/2022
Scaffold
FiledStatusContractorScope
03/15/2022——Scaffold
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
10/21/2022FinalCAESAR BUSTAMANTEprogress
09/07/2022Final—progress
09/07/2022Structural Cold-Formed Steel—special
09/07/2022Structural Stability – Alterations of existing buildings—special
09/07/2022Structural Wood Frame—progress
08/16/2022Energy Code Compliance InspectionsCAESAR BUSTAMANTEprogress
08/16/2022Lighting controlsCAESAR BUSTAMANTEenergy_progress
08/16/2022Lighting in dwelling unitsCAESAR BUSTAMANTEenergy_progress
08/16/2022FinalCAESAR BUSTAMANTEprogress
08/16/2022Interior lighting powerCAESAR BUSTAMANTEenergy_progress
08/16/2022Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
06/29/2022FinalCAESAR BUSTAMANTEprogress
06/29/2022Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
06/29/2022Energy Code Compliance InspectionsCAESAR BUSTAMANTEprogress
06/29/2022Lighting in dwelling unitsCAESAR BUSTAMANTEenergy_progress
06/29/2022Interior lighting powerCAESAR BUSTAMANTEenergy_progress
06/29/2022Lighting controlsCAESAR BUSTAMANTEenergy_progress
03/19/2022UnderpinningMICHAEL KARANTINIDIS, P.E.special
03/19/2022Structural Stability – Alterations of existing buildingsMICHAEL KARANTINIDIS, P.E.special
03/10/2022Footing and FoundationMICHAEL KARANTINIDIS, P.E.progress
03/10/2022FinalMICHAEL KARANTINIDIS, P.E.progress
03/10/2022Post-installed Anchors—special
03/09/2022FinalNEVILLE PATELprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026B00686690-I1Request digital key ↗
08/31/2026B00684387-I1Request digital key ↗
08/30/2026B00694342-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/31/2026B00686690-I1Open ↗
08/31/2026B00684387-I1Open ↗
08/30/2026B00693451-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026B00696259-I1Open ↗
08/31/2026B00703780-P2Open ↗
08/31/2026B00703780-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B00703780-P2Open ↗
08/23/2026B00703780-P1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/29/2026B00703780-P2Open ↗
08/29/2026B00703863-I1Open ↗
08/28/2026B00696259-I1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00684387-I1Open ↗