1142 WHEELER AVENUE
BRONX · BIN 2023821
💬 Discuss this project
1929Year Built
2Stories
C3Building Class
R6Zoning
3,440 sfGross Floor Area
4Units
Rent Stabilized157 Active Violations 153 unresolved · 4 paperwork only ▸
Four families · Owner of record: MBD New Heights Apts Housing Development Fund Co · 2,500 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing work16p · 3 filings · 20 docs
Floor 2Plumbing work12p · 3 filings · 20 docs
Floor 1Plumbing work13p · 3 filings · 20 docs
CellarPlumbing work21p · 4 filings · 20 docs
Site & exteriorSidewalk shed2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MBD Community Housing407/08/2026
MBD New Heights Apts403/21/2026
MBD New Heights Apts Housing Development Fund Co103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joel Phagoo P.E103/30/2023
Rosenthal611/30/2022
Old Structures Engineering211/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting1603/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J-J PlumbingPlumbing407/08/2026
Notias ConstructionGeneral Contractor203/21/2026
J-J PlumbingFire Protection207/08/2026
Akm Construction NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab Co5344811/30/2022
Building Lifecycle
10/16/2026
Ftm bldg in a code compliant manner-obsvd @ EXP1 severly deteriorated mortar joints causing loose bricks & sagging window lintels under parapet,@…
DOB violation · open
10/16/2026
Corrective action plan req'd-obsvd @ EXP1 deteriorated mortar joints casing loose bricksm damaged awning, shattered window at cellar and sagging…
DOB violation · open
07/16/2026
Failure to maintain retaining wall in a safe condition.building is a s emi-detached 2 story + cellar residential building with a masonry wall along…
DOB violation · open
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
264 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJ-J Plumbing01/18/2024
DOB NOWSprinklersPermit IssuedJ-J Plumbing01/18/2024
DOB NOWBoiler EquipmentPermit IssuedJ-J Plumbing01/18/2024
DOB NOWSidewalk ShedSigned-offAkm Construction NY04/03/2023
DOB NOWBoiler EquipmentPermit IssuedJ-J Plumbing02/17/2023
DOB NOWPlumbingPermit IssuedJ-J Plumbing02/17/2023
DOB NOWSprinklersPermit IssuedJ-J Plumbing02/17/2023
DOB NOWStructuralPermit IssuedNotias Construction12/08/2022
BIS—ISSUEDNotias Construction11/29/2022
1 project · most recent 11/30/2022
Heating Systems Ventilation Systems
FiledStatusContractorScope
11/30/2022——Heating Systems, Ventilation Systems
1 project · most recent 01/18/2023
FiledStatusContractorScope
01/18/2023Permit IssuedHigh Quality Electric of—
1 project · most recent 11/23/2022
Steel Concrete Masonry
FiledStatusContractorScope
11/23/2022Permit IssuedNotias ConstructionSteel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
12/09/2022Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/09/2022Sprinkler SystemsMINA HANNAspecial
12/09/2022Energy Code Compliance InspectionsMINA HANNAprogress
12/09/2022HVAC insulation and sealing MINA HANNAenergy_progress
12/09/2022Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/09/2022Chimneys and ventsMINA HANNAspecial
12/09/2022Heating SystemsMINA HANNAspecial
12/09/2022Mechanical SystemsMINA HANNAspecial
12/09/2022Energy Code Compliance InspectionsMINA HANNAprogress
12/09/2022FinalMINA HANNAprogress
12/09/2022Shutoff dampersMINA HANNAenergy_progress
12/09/2022Maintenance informationMINA HANNAenergy_progress
12/09/2022HVAC insulation and sealing MINA HANNAenergy_progress
12/09/2022HVAC and service water heating equipment MINA HANNAenergy_progress
12/09/2022HVAC and service water heating system controls MINA HANNAenergy_progress
12/09/2022HVAC and service water heating equipment MINA HANNAenergy_progress
12/09/2022Maintenance informationMINA HANNAenergy_progress
12/09/2022HVAC and service water heating system controls MINA HANNAenergy_progress
12/09/2022Shutoff dampersMINA HANNAenergy_progress
12/09/2022Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/09/2022Heating SystemsMINA HANNAspecial
12/07/2022FinalMINA HANNAprogress
12/07/2022Concrete - Cast-In-PlaceMINA HANNAspecial
12/07/2022Structural Steel - High Strength BoltingMINA HANNAspecial
12/07/2022Structural Steel - DetailsMINA HANNAspecial
Latest 25 of 54.
111 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account