Three families
South Bushwick Neighborhood Homes
1143 HANCOCK STREET · BIN 3077905
💬 Discuss this project
2025Year Built
4Stories
C0Building Class
R6Zoning
5,512 sfGross Floor Area
3Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: RESTORED HOMES HOUSING DEVELOPMENT FUND CORP · 2,000 sf lot · 2.76 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 15 docs
Floor 4Under Construction5p · 2 filings · 20 docs
Floor 3Under Construction6p · 2 filings · 20 docs
Floor 2Under Construction6p · 2 filings · 20 docs
Floor 1Under Construction6p · 2 filings · 20 docs
CellarUnder Construction5p · 2 filings · 20 docs
1 job · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026Permit IssuedTARGET PIPING NY LLC60 heads
1 job · most recent 08/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Permit IssuedTARGET PIPING NY LLCStorm, Water/Sanitary
2 jobs · most recent 04/24/2026
General Wiring
FiledStatusContractorScope
04/24/2026CompleteSOLAS ELECTRICAL CORP—
07/16/2025CompleteNAPSTAR ELECTRIC INCGeneral Wiring
1 job · most recent 08/08/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/08/2025Signed-offAMBROSINO CONST CORPSteel, Concrete, Masonry
1 job · most recent 06/09/2025
Fence
FiledStatusContractorScope
06/09/2025Signed-offAMBROSINO CONST CORPFence
Building Lifecycle
All (84)Filed (13)Permit Issued (12)Signed Off (6)Violation (6)Inspection (5)Objection (12)Special Inspection (30)
09/17/2026
Permit issued — Plumbing
B00510760-I1-PL
09/16/2026
Permit issued — Plumbing
B00510760-I1-EW-SP
09/02/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/13/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
08/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
08/13/2026
Special inspection requirement — Sprinkler Systems
EDWIN HOPKINS
08/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
EDWIN HOPKINS
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
08/03/2026
Filed — Alteration
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH NB# 321598179
B00510760-P2
07/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01317606-I1
07/27/2026
Signed off — Alteration
B01317611-I1
07/27/2026
Signed off — Alteration
B01317603-I1
07/24/2026
Signed off — Alteration
B01317593-I1
07/23/2026
Signed off — Alteration
Install a temporary 8'-0" high construction fence in conjunction with New Building #321598179
B01235721-I1
07/20/2026
Signed off — Alteration
PROPOSE STRUCTURAL SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 321598179.
B00510719-I1
07/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
EDWIN HOPKINS
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
07/13/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
07/13/2026
Special inspection requirement — Sprinkler Systems
EDWIN HOPKINS
06/16/2026
Permit issued — Construction Fence
B01235721-I1-FN
04/24/2026
Violation issued (ECB, open)
Construction
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
04/24/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
04/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
04/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
04/24/2026
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
04/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
04/24/2026
Special inspection requirement — Final
EDWIN HOPKINS
04/24/2026
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
04/17/2026
Filed — Alteration
B00510747-P1
04/17/2026
Filed — Alteration
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH NB# 321598179
B00510760-P1
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Final
EDWIN HOPKINS
04/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
03/05/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/05/2026
Permit issued — Protection and Mechanical Methods
B01317611-I1-PMM
11/13/2025
Permit issued — Supported Scaffold
B01317603-I1-SF
11/13/2025
Permit issued — Sidewalk Shed
B01317593-I1-SH
11/13/2025
Permit issued — Protection and Mechanical Methods
B01317606-I1-PMM
11/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01317606-I1
11/12/2025
Filed — Alteration
B01317611-I1
11/12/2025
Filed — Alteration
B01317603-I1
11/12/2025
Filed — Alteration
B01317593-I1
10/29/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/04/2025
Permit issued — Plumbing
B00510760-I1-EW-SP
09/04/2025
Permit issued — Plumbing
B00510760-I1-PL
08/08/2025
Filed — Alteration
PROPOSE STRUCTURAL SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 321598179.
B00510719-P2
06/13/2025
Permit issued — Structural
B00510719-I1-ST
Latest 60 of 84 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEIGHBORHOOD RESTORE HDFC2209/18/2026
RESTORED HOMES HDFC407/08/2026
OWNERS REP904/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1003/21/2026
AE DESIGN SOLUTION803/21/2026
AMBROSINO CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMBROSINO CONST CORPGeneral Contractor707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor604/09/2026
TARGET PIPING NY LLCFire Protection209/17/2026
B&B MECH PLBG & HTG LLCPlumbing209/18/2026
VINCENZO NAPOLITANOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES9731608/03/2026
CROSSCHECK INSPECTION SER544208/08/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedB&B MECH PLBG & HTG LLC09/17/2026
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC09/16/2026
DOB NOWConstruction FenceSigned-offAMBROSINO CONST CORP06/16/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/05/2026
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC11/13/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC11/13/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/13/2025
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC09/04/2025
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC09/04/2025
DOB NOWStructuralSigned-offAMBROSINO CONST06/13/2025
DOB NOWConstruction FenceSigned-offAMBROSINO CONST06/10/2025
DOB NOWMechanical SystemsSigned-offAMBROSINO CONST06/09/2025
BIS—ISSUEDAMBROSINO CONST CORP06/13/2025
BIS—ISSUEDAMBROSINO CONST CORP06/13/2025
BISEQISSUEDHERITAGE V LLC06/23/2017
BIS—ISSUEDHERITAGE V LLC06/23/2017
BIS—ISSUEDHERITAGE V LLC06/23/2017
BISEQISSUEDSCALA CONTRACTING CO INC05/12/2006
BIS—ISSUEDSCALA CONTRACTING CO INC05/12/2006
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/02/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/05/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/29/2025Pass-Final PL - UndergroundPassView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
08/13/2026Maintenance informationEDWIN HOPKINSenergy_progress
08/13/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
08/13/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
08/13/2026Sprinkler SystemsEDWIN HOPKINSspecial
08/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEDWIN HOPKINSspecial
08/13/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
07/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEDWIN HOPKINSspecial
07/13/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
07/13/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
07/13/2026Maintenance informationEDWIN HOPKINSenergy_progress
07/13/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
07/13/2026Sprinkler SystemsEDWIN HOPKINSspecial
04/24/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
04/24/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
04/24/2026Maintenance informationEDWIN HOPKINSenergy_progress
04/24/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
04/24/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
04/24/2026Shutoff dampersEDWIN HOPKINSenergy_progress
04/24/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
04/24/2026FinalEDWIN HOPKINSprogress
04/24/2026Mechanical SystemsEDWIN HOPKINSspecial
04/02/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
04/02/2026Mechanical SystemsEDWIN HOPKINSspecial
04/02/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
04/02/2026FinalEDWIN HOPKINSprogress
Latest 25 of 54.
▾Documents — 177 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/21/2026B00510719-P2Request digital key ↗
08/21/2026B00510719-P1Request digital key ↗
08/21/2026B00510719-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION17
02/19/2026321190536Open ↗
08/04/2025321598179Open ↗
06/09/2025340345816Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION7
06/13/2025321598179Open ↗
06/13/2025321598179Open ↗
06/13/2025321598179Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
02/13/2026340345816Open ↗
07/08/2025340345816Open ↗
02/16/2016340345816Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM4
10/11/2024321598179Open ↗
11/18/2022321598179Open ↗
01/06/2022321598179Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
11/03/2021321598179Open ↗
04/21/2016321190536Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
11/03/2021321598179Open ↗
04/21/2016321190536Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/12/2016321190536Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/21/2026B01235721-I1Open ↗
08/19/2026B01317603-I1Open ↗
08/19/2026B01317606-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00510719-I1Open ↗
08/30/2026B00510719-P1Open ↗
08/28/2026B00510719-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00510719-I1Open ↗
08/30/2026B00510719-P1Open ↗
08/28/2026B00510719-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/26/2017321190536Open ↗
06/26/2017321190536Open ↗
06/26/2017321190536Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/16/2016340345816Open ↗
▸Trade Schedules & Equipment3
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
05/12/2016321190536Open ↗
▸BISSCHEDULE B - PLUMBING1
04/06/2016321190536Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
01/06/2022321598179Open ↗
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST6
11/17/2022321598179Open ↗
01/06/2022321598179Open ↗
11/03/2021321598179Open ↗
Showing 3 of 6 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/26/2017321190536Open ↗
06/26/2017321190536Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
06/13/2025321598179Open ↗
06/26/2017321190536Open ↗
▸BISSTREET TREES SITE PLAN1
01/06/2022321598179Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/07/2016340345816Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/03/2025321598179Open ↗
06/12/2025321598179Open ↗
01/06/2022321598179Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/26/2017321190536Open ↗
06/26/2017321190536Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY18
11/14/2025321598179Open ↗
11/14/2025321598179Open ↗
06/13/2025321598179Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
06/04/2025321598179Open ↗
11/03/2021321598179Open ↗
04/21/2016321190536Open ↗
▸BISSOIL REPORT2
06/04/2025321598179Open ↗
05/12/2016321190536Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/26/2017321190536Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/26/2017321190536Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
06/12/2025321598179Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/12/2025321598179Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
06/12/2025321598179Open ↗
▸BISHYDRO FLOW TEST LETTER1
05/12/2016321190536Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/19/2026B01317603-I1Open ↗
08/17/2026B00510747-P1Open ↗
08/17/2026B00510760-P2Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/17/2022321598179Open ↗
11/03/2021321598179Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
01/05/2022321598179Open ↗
06/23/2016321190536Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/12/2025321598179Open ↗
06/26/2017321190536Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/26/2017321190536Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION11
09/10/2025321598179Open ↗
08/19/2025340345816Open ↗
07/11/2025340345816Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET4
09/28/2020321598179Open ↗
05/18/2016321389298Open ↗
11/17/2015321190536Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/16/2016340345816Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
11/03/2021321598179Open ↗
04/21/2016321190536Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/16/2016340345816Open ↗
▸BISSupporting Document: Fee Deferment1
04/21/2016321190536Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/03/2021321598179Open ↗