Elevator apt, fireproof without stores
1145 EAST 229TH STREET
BRONX · BIN 2094152
💬 Discuss this project
1951Year Built
14Stories
D3Building Class
R5Zoning
1,028,976 sfGross Floor Area
1,019Units
LL97 CoveredRent Stabilized133 Active Violations 121 unresolved · 12 paperwork only 31 old, status unconfirmed ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: CSA Preservation Partners · 1,003,262 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNew York City Housing AuthorityUnder Construction2 filings
Site & exteriorCsa Preservation Partners LLC3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CSA Preservation Partners6110/21/2026
New York City Housing Authority3209/16/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rand Engineering & Arch403/21/2026
Rigid Structural Design103/21/2026
JM Zoning2203/21/2026
AE Design Solution203/21/2026
A1 Expediting Service803/21/2026
New York & Company203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
River City BuildersGeneral Contractor910/21/2026
Rockledge ScaffoldScaffold507/08/2026
4 Brothers & Sons FenceScaffold403/21/2026
MPC Plumbing & HeatingPlumbing409/16/2026
Thorn ElectricElectrical203/21/2026
Capone Electrical ContractorsElectrical203/22/2026
Star Electrical ContractorsElectrical103/22/2026
Selectric Electrical Cont Co IElectrical103/21/2026
Lawrence J. LevineFire Protection103/21/2026
Levine LawrenceGeneral Contractor103/21/2026
Par PlumbingGeneral Contractor103/21/2026
Vik XS ServicesScaffold104/09/2026
Hay Mechanical SolutionsPlumbing106/28/2026
Inpro PlumbingPlumbing109/16/2026
Par Plumbing CoPlumbing110/01/2026
S & A Electrical CompanyElectrical103/21/2026
Wiretech ElectricElectrical103/21/2026
Five Borough ElectricElectrical103/22/2026
Stanco System Electrical ContElectrical103/21/2026
Eia ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons1061404/22/2026
Rand Engineering & Architects266208/28/2025
Leo Y Lee Associates2481108/12/2024
New York Engineering Associates851101/05/2024
Building Lifecycle
All (203)Filed (25)Permit Issued (26)Signed Off (3)Facade (FISP) (16)Violation (60)Inspection (5)Objection (38)Special Inspection (30)
10/20/2026
Permit issued — Foundation
X08053901-S7-GC-CX
09/15/2026
Permit issued — Plumbing
X08053901-S6-PL
09/15/2026
Permit issued — Plumbing
X08053901-S1-PL
08/03/2026
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-P7
07/21/2026
Permit issued — Mechanical Systems
X08053901-S2-MS
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/22/2026
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-P6
04/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/06/2026
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-P5
03/26/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
03/26/2026
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
03/19/2026
Cycle 10 facade report signed — SAFE
03/18/2026
Permit issued — General Construction
X08053901-I1-GC
03/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2026
Permit issued — Plumbing
X08053901-S5-PL
02/13/2026
Cycle 10 facade report submitted
02/10/2026
Violation issued (HPD, open)
C
01/30/2026
Cycle 10 facade inspection completed
01/26/2026
Signed off — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00885983-I1
01/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/08/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/05/2026
Permit issued — Plumbing
X08053901-S4-PL
12/22/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-S7
12/03/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-P4
11/18/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-S4
11/12/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
11/12/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
11/12/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
11/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/28/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-S9
10/28/2025
Permit issued — Suspended Scaffold
X08053901-S9-SC
10/17/2025
Permit issued — Suspended Scaffold
X08053901-S8-SC
10/16/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-S8
10/15/2025
Permit issued — Plumbing
X08053901-S6-PL
10/14/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-S5
10/06/2025
Permit issued — Sidewalk Shed
X00936668-I1-SH
09/28/2025
Violation issued (HPD, closed)
C
09/28/2025
Violation issued (HPD, closed)
C
09/24/2025
Signed off — Alteration
Installation of suspended scaffold for facade work or inspection
X01094220-I1
09/23/2025
Permit issued — Suspended Scaffold
X01094220-I1-SC
09/11/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
X08053901-P3
09/05/2025
Special inspection requirement — Masonry
John Monroe
09/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
09/05/2025
Special inspection requirement — Final
John Monroe
09/05/2025
Special inspection requirement — Post-installed Anchors
John Monroe
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
08/28/2025
Filed — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00885983-P1
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Admin
08/12/2025
Objection raised — Plumbing
08/12/2025
Objection raised — Plumbing
08/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
08/12/2025
Special inspection requirement — Final
John Monroe
08/12/2025
Special inspection requirement — Masonry
John Monroe
Latest 60 of 203 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedRiver City Builders10/20/2026
DOB NOWPlumbingPermit IssuedMPC Plumbing & Heating09/15/2026
DOB NOWPlumbingPermit IssuedInpro Plumbing09/15/2026
DOB NOWMechanical SystemsPermit IssuedRiver City Builders07/21/2026
DOB NOWGeneral ConstructionPermit IssuedRiver City Builders03/18/2026
DOB NOWPlumbingPermit IssuedHay Mechanical Solutions02/26/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co01/05/2026
DOB NOWSuspended ScaffoldPermit IssuedVik XS Services10/28/2025
DOB NOWSuspended ScaffoldPermit IssuedVik XS Services10/17/2025
DOB NOWPlumbingPermit IssuedMPC Plumbing & Heating10/15/2025
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold10/06/2025
DOB NOWSuspended ScaffoldSigned-offM & A Projects09/23/2025
DOB NOWGeneral ConstructionPermit IssuedRiver City Builders02/14/2025
DOB NOWGeneral ConstructionSigned-offRiver City Builders02/04/2025
DOB NOWConstruction FencePermit Issued4 Brothers Sons Fence10/31/2024
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold10/08/2024
DOB NOWConstruction FencePermit IssuedRockledge Scaffold10/07/2024
DOB NOWSuspended ScaffoldSigned-offM & A Projects08/21/2024
DOB NOWGeneral ConstructionSigned-offRiver City Builders05/13/2024
DOB NOWGeneral ConstructionPermit IssuedRiver City Builders05/13/2024
DOB NOWGeneral ConstructionPermit IssuedRiver City Builders02/05/2024
DOB NOWGeneral ConstructionSigned-offRiver City Builders02/01/2024
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn01/11/2024
DOB NOWConstruction FencePermit Issued4 Brothers Sons Fence10/26/2023
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold10/11/2023
DOB NOWConstruction FencePermit IssuedRockledge Scaffold10/11/2023
BISEQISSUEDB & S Restoration05/23/2013
BISOTISSUEDGem-Quality04/24/2013
BISEQISSUEDTechnico Construction03/01/2013
BISEQISSUEDB & S Restoration01/28/2013
BISEQISSUEDB & S Restoration01/17/2013
BISEQISSUEDGem-Quality01/16/2013
BISPLISSUEDCatalano Plumbing & Heating06/19/2012
BISEQISSUEDTechnico Construction03/22/2012
BISEQISSUEDTechnico Construction04/07/2011
BISOTISSUEDNational Enviromental Safety08/23/2010
BISPLISSUEDNeptune Mechanical06/18/2010
BISEQISSUEDTechnico Construction06/15/2010
BISOTISSUEDNational Enviromental Safety01/08/2010
BISOTISSUEDNational Enviromental Safety06/29/2009
+ 3 more permits on file
1 project · most recent 08/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026Permit IssuedRiver City BuildersHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTQ60TAVJU 57,000 BTU · Vrf Outdoor ×8
RK36WMVJU9 34,400 BTU · Heat Pump Outdoor ×2
Ventilation
Greenheck SQ-70 70 CFM · Exhaust Fan ×6
SQ-90-VG 220 CFM · Exhaust Fan ×6
EDJ 401 220 CFM · Exhaust Fan ×5
ESD 635 150 CFM · Exhaust Fan ×3
SQ-95-VG 250 CFM · Exhaust Fan ×3
AER-20-03-0615-VG 500 CFM · Exhaust Fan ×2
Cooling
Daikin RXTQ60TAVJU 57,000 BTU · Vrf Outdoor ×8
RK36WMVJU9 34,400 BTU · Heat Pump Outdoor ×2
1 project · most recent 08/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Permit IssuedMadison Pipe ConsultingGas, Storm, Water/Sanitary
7 projects · most recent 10/27/2025
General Wiring
FiledStatusContractorScope
10/27/2025Permit IssuedFive Borough Electric—
09/13/2025CompleteWiretech ElectricGeneral Wiring
08/12/2025Permit IssuedCapone Electrical ContractorsGeneral Wiring
02/29/2024Permit IssuedStar Electrical Contractors—
12/21/2023CompleteLaura Electrical Lighting—
10/10/2023Permit IssuedAnthony G Ferry—
08/15/2018CompleteJemco Electric ContractorsGeneral Wiring
1 project · most recent 08/03/2026
Concrete
FiledStatusContractorScope
08/03/2026Permit IssuedRiver City BuildersConcrete
2 projects · most recent 09/19/2024
Fence Sidewalk Shed
FiledStatusContractorScope
09/19/2024Permit IssuedRockledge ScaffoldFence, Sidewalk Shed
10/25/2023Permit Issued4 Brothers & Sons FenceFence
1 project · most recent 08/03/2026
Suspended Scaffold
FiledStatusContractorScope
08/03/2026Permit IssuedRiver City BuildersSuspended Scaffold
1 project · most recent 08/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/03/2026Permit IssuedRiver City BuildersSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/08/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/19/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/09/2026Tenant Protection Plan Compliance—special
04/14/2026Tenant Protection Plan Compliance—special
04/14/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
03/26/2026FinalGEORGE GHEBRYALprogress
03/26/2026Tenant Protection Plan Compliance—special
03/26/2026Mechanical SystemsGEORGE GHEBRYALspecial
03/26/2026Heating SystemsGEORGE GHEBRYALspecial
11/12/2025FinalGEORGE GHEBRYALprogress
11/12/2025Heating SystemsGEORGE GHEBRYALspecial
11/12/2025Mechanical SystemsGEORGE GHEBRYALspecial
11/12/2025Tenant Protection Plan Compliance—special
09/05/2025MasonryJohn Monroespecial
09/05/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
09/05/2025FinalJohn Monroeprogress
09/05/2025Post-installed AnchorsJohn Monroespecial
09/05/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
08/12/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
08/12/2025FinalJohn Monroeprogress
08/12/2025MasonryJohn Monroespecial
08/12/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
08/12/2025Post-installed AnchorsJohn Monroespecial
07/22/2025Tenant Protection Plan Compliance—special
07/01/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
07/01/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationGEORGE GHEBRYALspecial
06/11/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
Latest 25 of 41.
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/22/2026X00885983-P1Request digital key ↗
08/22/2026X00885983-I1Request digital key ↗
08/22/2026X00936668-P1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits24
▸BISWORK PERMIT APPLICATION15
05/24/2013220248408Open ↗
04/25/2013220199158Open ↗
03/07/2013220067503Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
01/29/2013220248408Open ↗
01/18/2013220235029Open ↗
01/16/2013220224889Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X08053901-P2Open ↗
▸Seals & Professional Certifications76
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/22/2026X00885983-P1Open ↗
08/22/2026X00885983-I1Open ↗
08/22/2026X00936668-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
07/01/2014220067503Open ↗
04/18/2014220199158Open ↗
03/28/2014220199158Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026X00982835-I1Open ↗
09/23/2026X00982835-I1Open ↗
09/01/2026X08053901-P2Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
02/12/2013220003289Open ↗
01/29/2013220248408Open ↗
01/18/2013220235029Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
01/29/2013220248408Open ↗
01/18/2013220235029Open ↗
01/16/2013220224889Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026X08053901-P2Open ↗
08/31/2026X00885983-P1Open ↗
08/24/2026X00885983-I1Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE5
09/19/2012220162954Open ↗
08/31/2012220162954Open ↗
08/24/2012220162954Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
01/11/2012220162954Open ↗
03/23/2011220003289Open ↗
04/23/2009220003289Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
07/03/2013220162954Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/17/2026X08053901-P6Open ↗
08/17/2026X08053901-P4Open ↗
08/17/2026X08053901-P3Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/16/2010220067503Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/11/2012220162954Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/28/2014220199158Open ↗
▸BISASBESTOS INSPECTION REPORT1
04/23/2009220003289Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/22/2026X00885983-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/28/2014220199158Open ↗
07/25/2012220199158Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/28/2014220199158Open ↗
07/13/2013220162954Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/11/2012220162954Open ↗
▸Inspections & Test Reports1
▸BISBORINGS - TEST PITS (TR-4) 27-7201
06/16/2010220067503Open ↗
▸Approvals, Objections & Sign-offs51
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/22/2026X00885983-I1Open ↗
08/22/2026X00885983-P1Open ↗
08/17/2026X08053901-P7Open ↗
Showing 3 of 23 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
07/01/2014220067503Open ↗
04/18/2014220199158Open ↗
12/18/2013220248408Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
01/29/2013220248408Open ↗
01/18/2013220235029Open ↗
01/16/2013220224889Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
07/02/2013220162954Open ↗
02/12/2013220003289Open ↗
02/12/2013220003289Open ↗
Showing 3 of 7 on file for this type
▸BISSHED LETTER3
05/24/2013220248408Open ↗
03/23/2012220067503Open ↗
04/08/2011220067503Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
03/07/2013220067503Open ↗
03/07/2013220067503Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/22/2026X00885983-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
03/28/2014220199158Open ↗
07/13/2013220162954Open ↗
07/25/2012220199158Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
01/29/2013220248408Open ↗
01/18/2013220235029Open ↗
01/16/2013220224889Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
02/12/2013220003289Open ↗
09/12/2012220003289Open ↗
▸Other Documents17
▸DOB NOWProof of Historic Building5
08/13/2026X00885983-I1Open ↗
08/13/2026X08053901-P1Open ↗
08/13/2026X08053901-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026X08053901-S9Open ↗
08/13/2026X01094220-I1Open ↗
08/13/2026X08053901-S8Open ↗
▸DOB NOWCalculations3
08/13/2026X08053901-S8Open ↗
08/13/2026X01094220-I1Open ↗
08/13/2026X08053901-S9Open ↗
▸DOB NOWPlot Diagram2
08/13/2026X08053901-I1Open ↗
08/13/2026X08053901-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X08053901-I1Open ↗
08/13/2026X08053901-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026X08053901-I1Open ↗
08/13/2026X08053901-P2Open ↗