Two family brick
1146 MANOR AVENUE
BRONX · BIN 2023980
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
2,540 sfGross Floor Area
2Units
2 Open Violations 0 unresolved · 2 paperwork only ▸
Two family brick · 2,500 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J&H ELECTRICAL CONTRACTING INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/18/2024$1000K—— → —$394/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IAA ARCHITECTS PLLC302/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TASHEED BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SMM CONTRACTORS INCGeneral Contractor204/09/2026
J&H ELECTRICAL CONT INCElectrical103/22/2026
M&G PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOHAMMAD AHEAD - PROFESSI9286108/06/2025
Building Lifecycle
All (25)Filed (3)Permit Issued (3)Signed Off (2)Violation (4)Inspection (4)Objection (6)Special Inspection (3)
05/07/2026
Signed off — Alteration
Filing for Plumbing work in conjunction with the alt application , replace existing fixtures at restroom and kitchen, new lav and toilet in conjunction filed X01263490-I1. No change in use ,egress or occupancy
X01263490-I1
05/01/2026
Signed off — Alteration
Filing for Plumbing work in conjunction with the alt application , replace existing fixtures at restroom and kitchen, new lav and toilet in conjunction filed X01263490-I1. No change in use ,egress or occupancy
X01263490-S1
04/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2026
Filed — Alteration
Filing for Plumbing work in conjunction with the alt application , replace existing fixtures at restroom and kitchen, new lav and toilet in conjunction filed X01263490-I1. No change in use ,egress or occupancy
X01263490-P1
02/25/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Violation issued (ECB, closed)
Construction
11/20/2025
Violation issued (ECB, closed)
Construction
10/23/2025
Permit issued — Plumbing
X01263490-S1-PL
10/10/2025
Permit issued — General Construction
X01263490-I1-GC
09/26/2025
Filed — Alteration
Filing for Plumbing work in conjunction with the alt application , replace existing fixtures at restroom and kitchen, new lav and toilet in conjunction filed X01263490-I1. No change in use ,egress or occupancy
X01263490-S1
09/15/2025
Permit issued — General Construction
X01263490-I1-GC
09/02/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/21/2025
Objection raised — Other
08/19/2025
Objection raised — Other
08/19/2025
Objection raised — Cost
08/06/2025
Filed — Alteration
Filing for Plumbing work in conjunction with the alt application , replace existing fixtures at restroom and kitchen, new lav and toilet in conjunction filed X01263490-I1. No change in use ,egress or occupancy
X01263490-I1
08/03/2025
Special inspection requirement — Insulation placement and R values
IBRAHIM A ANSE
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD AHEAD
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM A ANSE
07/15/2025
Violation issued (ECB, open)
Construction
07/15/2025
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING10/23/2025
DOB NOWGeneral ConstructionSigned-offSMM CONTRACTORS INC10/10/2025
DOB NOWGeneral ConstructionSigned-offSMM CONTRACTORS INC09/15/2025
1 project · most recent 02/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/27/2026Signed-offM&G PLUMBING AND HEATINGGas, Water/Sanitary
1 project · most recent 04/10/2026
General Wiring
FiledStatusContractorScope
04/10/2026Permit IssuedJ&H ELECTRICAL CONT INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/03/2025Insulation placement and R valuesIBRAHIM A ANSEenergy_progress
07/29/2025Fire-Resistant Penetrations and JointsMOHAMMAD AHEADspecial
07/29/2025Energy Code Compliance InspectionsIBRAHIM A ANSEprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026X01263490-P1Request digital key ↗
08/17/2026X01263490-S1Request digital key ↗
08/17/2026X01263490-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026X01263490-P1Open ↗
08/13/2026X01263490-I1Open ↗
08/13/2026X01263490-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X01263490-I1Open ↗
08/25/2026X01263490-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026X01263490-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026X01263490-I1Open ↗
08/13/2026X01263490-P1Open ↗
08/13/2026X01263490-S1Open ↗