← Back
Two family brick
115-01 LINDEN BOULEVARD
QUEENS · BIN 4250321
💬 Discuss this project
1970Year Built
2Stories
B1Building Class
R4AZoning
1,890 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: WHITESTONE HOMES LLC · 2,967 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS1207/08/2026
WHITESTONE HOMES LLC.103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/19/2025$890K—PLAZA GARDENS REAL ESTATE CORP → Private party$471/sf building
09/06/2024$475K—Private party → HANCOCK BEDFORD LLC$251/sf building
09/06/2024$475K—Private party → HANCOCK BEDFORD LLC$251/sf building
09/06/2024$475K—Private party → HANCOCK BEDFORD LLC$251/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.403/24/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177403/24/2025
Building Lifecycle
All (38)Filed (4)Permit Issued (2)Signed Off (2)Violation (7)Inspection (5)Objection (8)Special Inspection (10)
08/11/2025
Signed off — Alteration
PROPOSE TO REMOVE ILLEGAL PARTITIONS, RESIDENTIAL SINK, AND ELECTRIC STOVE IN THE 1ST FLOOR, LEGALIZE THREE FIXTURE BATHROOM IN THE CELLAR, LEGALIZE EXISTING BATHROOM IN THE 1ST FLOOR, REMOVE ILLEGAL CARPORT CANOPY ON THE REAR YARD. RESOLVE ECB VIOLATIONS
Q01147657-S1
08/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/30/2025
Signed off — Alteration
PROPOSE TO REMOVE ILLEGAL PARTITIONS, RESIDENTIAL SINK, AND ELECTRIC STOVE IN THE 1ST FLOOR, LEGALIZE THREE FIXTURE BATHROOM IN THE CELLAR, LEGALIZE EXISTING BATHROOM IN THE 1ST FLOOR, REMOVE ILLEGAL CARPORT CANOPY ON THE REAR YARD. RESOLVE ECB VIOLATIONS
Q01147657-I1
07/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/27/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/09/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
04/01/2025
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
03/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
03/24/2025
Filed — Alteration
PROPOSE TO REMOVE ILLEGAL PARTITIONS, RESIDENTIAL SINK, AND ELECTRIC STOVE IN THE 1ST FLOOR, LEGALIZE THREE FIXTURE BATHROOM IN THE CELLAR, LEGALIZE EXISTING BATHROOM IN THE 1ST FLOOR, REMOVE ILLEGAL CARPORT CANOPY ON THE REAR YARD. RESOLVE ECB VIOLATIONS
Q01147657-P2
03/24/2025
Filed — Alteration
PROPOSE TO REMOVE ILLEGAL PARTITIONS, RESIDENTIAL SINK, AND ELECTRIC STOVE IN THE 1ST FLOOR, LEGALIZE THREE FIXTURE BATHROOM IN THE CELLAR, LEGALIZE EXISTING BATHROOM IN THE 1ST FLOOR, REMOVE ILLEGAL CARPORT CANOPY ON THE REAR YARD. RESOLVE ECB VIOLATIONS
Q01147657-P1
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
03/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
03/06/2025
Permit issued — Plumbing
Q01147657-S1-PL
03/01/2025
Permit issued — General Construction
Q01147657-I1-GC
02/07/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
01/10/2025
Objection raised — Cost
01/10/2025
Objection raised — Other
01/10/2025
Objection raised — Scope
01/10/2025
Objection raised — Admin
01/02/2025
Filed — Alteration
PROPOSE TO REMOVE ILLEGAL PARTITIONS, RESIDENTIAL SINK, AND ELECTRIC STOVE IN THE 1ST FLOOR, LEGALIZE THREE FIXTURE BATHROOM IN THE CELLAR, LEGALIZE EXISTING BATHROOM IN THE 1ST FLOOR, REMOVE ILLEGAL CARPORT CANOPY ON THE REAR YARD. RESOLVE ECB VIOLATIONS
Q01147657-S1
01/02/2025
Filed — Alteration
PROPOSE TO REMOVE ILLEGAL PARTITIONS, RESIDENTIAL SINK, AND ELECTRIC STOVE IN THE 1ST FLOOR, LEGALIZE THREE FIXTURE BATHROOM IN THE CELLAR, LEGALIZE EXISTING BATHROOM IN THE 1ST FLOOR, REMOVE ILLEGAL CARPORT CANOPY ON THE REAR YARD. RESOLVE ECB VIOLATIONS
Q01147657-I1
04/12/2014
Violation issued (ECB, closed)
Construction
04/12/2014
Violation issued (ECB, closed)
Construction
04/12/2014
Violation issued (ECB, closed)
Construction
11/19/2008
Violation issued (ECB, closed)
Construction
09/05/2008
Violation issued (ECB, closed)
Construction
09/05/2008
Violation issued (ECB, closed)
Quality of Life
07/27/2008
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/06/2025
DOB NOWGeneral ConstructionSigned-offPRECISION HOME DEV INC03/01/2025
BISOTISSUEDCASTLE CONSTRUCTION & DESIGN10/15/2008
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/27/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/01/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
04/01/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
03/31/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
03/31/2025Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
03/31/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
03/21/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
03/21/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
03/21/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
03/21/2025Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
03/21/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026Q01147657-I1Request digital key ↗
08/21/2026Q01147657-P2Request digital key ↗
08/21/2026Q01147657-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
09/12/2025410179649Open ↗
06/09/2014410179649Open ↗
05/30/2014410179649Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
10/15/2008410179649Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q01147657-I1Open ↗
08/21/2026Q01147657-S1Open ↗
08/13/2026Q01147657-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026Q01147657-P1Open ↗
08/27/2026Q01147657-P2Open ↗
08/26/2026Q01147657-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q01147657-P1Open ↗
08/27/2026Q01147657-P2Open ↗
08/26/2026Q01147657-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/14/2008410179649Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/14/2008410179649Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/15/2008410179649Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q01147657-S1Open ↗
08/21/2026Q01147657-I1Open ↗
08/13/2026Q01147657-P2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/14/2008410179649Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
10/14/2008410179649Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/14/2008410179649Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/14/2008410179649Open ↗