← Back
One story - permanent living quarter
115-08 231 STREET
QUEENS · BIN 4243631
💬 Discuss this project
1945Year Built
1.5Stories
A2Building Class
R2AZoning
1,324 sfGross Floor Area
1Units
6 Open Violations ▸FDNY Report ↗
One story - permanent living quarter · 4,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/19/2021$385K—Private party → Private party$291/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAHMAL SABAHA PE CONSULTING ENGR305/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS DRAFTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCO PLBG AND HTG INCPlumbing307/08/2026
Building Lifecycle
All (19)Filed (3)Permit Issued (3)Signed Off (1)Violation (8)Special Inspection (4)
06/14/2021
Signed off — Alteration
PROP. CAP AND REMOVAL OF 3 PIECE BATHROOM, KIT. SINK AND GAS RANGE AT THE CEL. PROP 1/2 BATHROOM, ONE LAV AND ONE WC AT CEL. APPLICATION FILED TO RESOLVE ECB # 35071820L. FILED IN LIEU WITH DOB JOB#440603973. NO CHANGE TO USE,BULK OR EGRESS.
Q00364518-I1
05/25/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/25/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
05/19/2021
Filed — Alteration
PROP. CAP AND REMOVAL OF 3 PIECE BATHROOM, KIT. SINK AND GAS RANGE AT THE CEL. PROP 1/2 BATHROOM, ONE LAV AND ONE WC AT CEL. APPLICATION FILED TO RESOLVE ECB # 35071820L. FILED IN LIEU WITH DOB JOB#440603973. NO CHANGE TO USE,BULK OR EGRESS.
Q00364518-P4
04/30/2021
Permit issued — Plumbing
Q00364518-I1-PL
01/06/2021
Permit issued — Plumbing
Q00364518-I1-PL
10/19/2020
Filed — Alteration
PROP. CAP AND REMOVAL OF 3 PIECE BATHROOM, KIT. SINK AND GAS RANGE AT THE CEL. PROP 1/2 BATHROOM, ONE LAV AND ONE WC AT CEL. APPLICATION FILED TO RESOLVE ECB # 35071820L. FILED IN LIEU WITH DOB JOB#440603973. NO CHANGE TO USE,BULK OR EGRESS.
Q00364518-P3
10/19/2020
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/19/2020
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/12/2020
Permit issued — Plumbing
Q00364518-I1-PL
06/30/2020
Filed — Alteration
PROP. CAP AND REMOVAL OF 3 PIECE BATHROOM, KIT. SINK AND GAS RANGE AT THE CEL. PROP 1/2 BATHROOM, ONE LAV AND ONE WC AT CEL. APPLICATION FILED TO RESOLVE ECB # 35071820L. FILED IN LIEU WITH DOB JOB#440603973. NO CHANGE TO USE,BULK OR EGRESS.
Q00364518-I1
11/04/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/14/2015
Violation issued (ECB, closed)
Construction
07/02/2015
Violation issued (HPD, open)
I
06/17/2015
Violation issued (HPD, open)
B
06/17/2015
Violation issued (HPD, open)
B
06/17/2015
Violation issued (HPD, open)
B
06/17/2015
Violation issued (HPD, open)
C
06/17/2015
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC04/30/2021
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC01/06/2021
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC08/12/2020
BISOTISSUEDRAE MGMT INC08/03/2020
1 project · most recent 12/07/2020
General Wiring
FiledStatusContractorScope
12/07/2020CompleteBLZ ELECTRIC INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/25/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/25/2021Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
10/19/2020Energy Code Compliance InspectionsYounes Abouyaalaprogress
10/19/2020Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing3
08/27/2026Q00364518-P3Request digital key ↗
08/27/2026Q00364518-I1Request digital key ↗
08/15/2026Q00364518-P4Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/02/2020440603973Open ↗
▸BISWORK PERMIT APPLICATION1
08/03/2020440603973Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/26/2026Q00364518-P3Open ↗
09/26/2026Q00364518-P3Open ↗
08/26/2026Q00364518-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00364518-I1Open ↗
08/13/2026Q00364518-P3Open ↗
08/13/2026Q00364518-P4Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/02/2020440603973Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/02/2020440603973Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/02/2021440603973Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/02/2021440603973Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/02/2020440603973Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q00364518-P4Open ↗
08/13/2026Q00364518-P3Open ↗
08/13/2026Q00364518-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/02/2020440603973Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/24/2021440603973Open ↗
08/03/2020440603973Open ↗
07/02/2020440603973Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/02/2021440603973Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/02/2020440603973Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/24/2021440603973Open ↗
05/24/2021440603973Open ↗
07/24/2020440603973Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/02/2021440603973Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/02/2021440603973Open ↗
07/02/2020440603973Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
07/13/2020440603973Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/02/2020440603973Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/02/2021440603973Open ↗