115-11 150 AVENUE
QUEENS · South Ozone Park · BIN 4256810
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R3XZoning
1,050 sfGross Floor Area
1Units
Cape Cod · 4,000 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Structural
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE CUSTOM BUILDERS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/11/2016$452K—— → —$430/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP608/29/2025
TABRIZ GROUP ENTERPRISES209/18/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE CUSTOM BUILDERS*General Contractor607/08/2026
AYYUB ELECTRIC CORPElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252308/29/2025
TABRIZ GROUP ENTERPRISES3275708/29/2025
Building Lifecycle
All (54)Filed (7)Permit Issued (5)Signed Off (4)Inspection (8)Special Inspection (30)
05/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/07/2025
Signed off — Alteration
FOUNDATION APPLICATION IN CONJUNCTION WITH ALT CO APPLICATION Q01109210-I1.
Q01158155-I1
10/07/2025
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB GARAGE APP#Q01167890 & ALT 1 APP# Q01109210 (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q01113117-I1
10/07/2025
Signed off — Alteration
Q01158200-I1
09/24/2025
Signed off — Alteration
Q01108758-I1
08/29/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB GARAGE APP#Q01167890 & ALT 1 APP# Q01109210 (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q01113117-P2
08/29/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
08/29/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
08/29/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
08/29/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
08/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/24/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB GARAGE APP#Q01167890 & ALT 1 APP# Q01109210 (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q01113117-P1
06/12/2025
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Final
HARI SONI
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Structural Wood Frame
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
04/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/13/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/13/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2025
Permit issued — Plumbing
Q01113117-I1-PL
01/21/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB GARAGE APP#Q01167890 & ALT 1 APP# Q01109210 (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q01113117-I1
01/16/2025
Permit issued — Foundation
Q01109210-I1-GC-CX
12/23/2024
Permit issued — Foundation
Q01158155-I1-FO
12/20/2024
Permit issued — Structural
Q01158200-I1-ST
12/19/2024
Filed — Alteration
FOUNDATION APPLICATION IN CONJUNCTION WITH ALT CO APPLICATION Q01109210-I1.
Q01158155-I1
12/19/2024
Filed — Alteration
Q01158200-I1
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
12/19/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
12/19/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
12/19/2024
Special inspection requirement — Final
HARI SONI
12/19/2024
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
09/20/2024
Permit issued — Construction Fence
Q01108758-I1-FN
09/18/2024
Filed — Alteration CO
Q01109210-I1
09/10/2024
Filed — Alteration
Q01108758-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/05/2025
DOB NOWFoundationPermit IssuedRELIABLE CUSTOM BUILDERS*01/16/2025
DOB NOWFoundationSigned-offRELIABLE CUSTOM BUILDERS*12/23/2024
DOB NOWStructuralSigned-offRELIABLE CUSTOM BUILDERS*12/20/2024
DOB NOWConstruction FenceSigned-offRELIABLE CUSTOM BUILDERS*09/20/2024
2 projects · most recent 08/18/2025
General Wiring
FiledStatusContractorScope
08/18/2025CompleteAYYUB ELECTRIC CORPGeneral Wiring
10/14/2024CompleteAYYUB ELECTRIC CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/13/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
08/29/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
08/29/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
08/29/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
08/29/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
06/12/2025MasonryBAKHTIAR SHAMLOOspecial
06/12/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
06/12/2025Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
06/12/2025FinalHARI SONIprogress
06/12/2025Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
06/12/2025Footing and FoundationBAKHTIAR SHAMLOOprogress
06/12/2025Structural Wood FrameBAKHTIAR SHAMLOOprogress
06/12/2025Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
06/12/2025Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
06/12/2025Fenestration areasBAKHTIAR SHAMLOOenergy_progress
06/12/2025Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
06/12/2025Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
06/12/2025Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
06/12/2025Permanent certificateBAKHTIAR SHAMLOOenergy_progress
06/12/2025Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
06/12/2025Maintenance informationBAKHTIAR SHAMLOOenergy_progress
06/12/2025MeteringBAKHTIAR SHAMLOOenergy_progress
06/12/2025Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
06/12/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
06/12/2025Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
06/12/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
Latest 25 of 56.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026Q01108758-I1Request digital key ↗
08/21/2026Q01109210-I1Request digital key ↗
08/21/2026Q01109210-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01109210-I1Open ↗
08/13/2026Q01109210-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01109210-I1Open ↗
08/13/2026Q01109210-P1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q01109210-P1Open ↗
09/02/2026Q01109210-P1Open ↗
09/02/2026Q01109210-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026Q01109210-P1Open ↗
08/29/2026Q01109210-I1Open ↗
08/23/2026Q01158155-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026Q01108758-I1Open ↗
08/21/2026Q01109210-P1Open ↗
08/21/2026Q01109210-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01109210-I1Open ↗
08/13/2026Q01109210-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026Q01109210-P1Open ↗
08/21/2026Q01109210-I1Open ↗
08/19/2026Q01113117-P2Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q01158155-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01158155-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01109210-I1Open ↗
08/13/2026Q01109210-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01109210-P1Open ↗
08/13/2026Q01109210-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01109210-P1Open ↗
08/13/2026Q01109210-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01109210-P1Open ↗
08/21/2026Q01109210-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01109210-I1Open ↗