← Back
BuildNYC
Two stories - detached, small or mid-size
115-12 135TH STREET
QUEENS · South Ozone Park · BIN 4252509
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R3-2Zoning
1,120 sfGross Floor Area
1Units
28 Active Violations 21 unresolved · 7 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,500 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarOccupancy Group: J-3 - Residential 1-2 Family Houses2p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Melk203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/13/2021$775K—TRI STAR HOLDINGS 4 LLC → HOME M LLC$440/sf building
01/16/2020$360K—— → —$205/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hansa Building Engineering Services202/01/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CJ Heating & MechanicalPlumbing607/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Askon Architect3596202/01/2022
Building Lifecycle
All (50)Filed (2)Permit Issued (2)Signed Off (1)Violation (32)Inspection (5)Objection (2)Special Inspection (6)
08/16/2022
Signed off — Alteration
CAP AND REMOVE SHOWER W/ WATER AND WASTE LINE. CAP AND REMOVE GAS STOVE WITH GAS LINE. CAP AND REMOVE KITCHEN SINK WITH WATER AND WASTE LINE. REPLACE SLOP SINK AND REPLACE WASHER AND DRYER WITH EXISTING ROUGHING.
Q00387729-I1
03/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/15/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/01/2022
Filed — Alteration
CAP AND REMOVE SHOWER W/ WATER AND WASTE LINE. CAP AND REMOVE GAS STOVE WITH GAS LINE. CAP AND REMOVE KITCHEN SINK WITH WATER AND WASTE LINE. REPLACE SLOP SINK AND REPLACE WASHER AND DRYER WITH EXISTING ROUGHING.
Q00387729-S1
01/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
01/25/2022
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
01/18/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/04/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/30/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/02/2021
Permit issued — Plumbing
Q68357881-I1-PL
06/14/2021
Violation issued (ECB, closed)
Construction
06/14/2021
Violation issued (ECB, closed)
Construction
04/26/2021
Permit issued — Plumbing
Q00387729-I1-PL
09/24/2020
Objection raised — Scope
09/24/2020
Objection resolved — Addressed
09/22/2020
Filed — Alteration
CAP AND REMOVE SHOWER W/ WATER AND WASTE LINE. CAP AND REMOVE GAS STOVE WITH GAS LINE. CAP AND REMOVE KITCHEN SINK WITH WATER AND WASTE LINE. REPLACE SLOP SINK AND REPLACE WASHER AND DRYER WITH EXISTING ROUGHING.
Q00387729-I1
08/19/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
08/19/2020
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
08/19/2020
Special inspection requirement — Fire-Resistance Rated Construction
HANSA PERSAUD
08/19/2020
Special inspection requirement — Electrical energy consumption
HANSA PERSAUD
01/21/2015
Violation issued (ECB, open)
Quality of Life
01/21/2015
Violation issued (ECB, open)
Construction
10/09/2014
Violation issued (HPD, open)
B
07/11/2014
Violation issued (HPD, open)
B
07/11/2014
Violation issued (HPD, open)
B
07/11/2014
Violation issued (HPD, open)
B
07/11/2014
Violation issued (HPD, open)
B
07/11/2014
Violation issued (HPD, open)
A
07/11/2014
Violation issued (HPD, open)
B
06/25/2014
Violation issued (HPD, open)
B
06/25/2014
Violation issued (HPD, open)
B
06/25/2014
Violation issued (HPD, open)
A
06/04/2014
Violation issued (HPD, open)
B
06/04/2014
Violation issued (HPD, open)
B
06/04/2014
Violation issued (HPD, open)
C
06/04/2014
Violation issued (HPD, open)
B
06/03/2014
Violation issued (ECB, open)
Construction
04/17/2014
Violation issued (HPD, open)
B
04/17/2014
Violation issued (HPD, closed)
C
04/17/2014
Violation issued (HPD, open)
B
04/17/2014
Violation issued (HPD, open)
B
04/17/2014
Violation issued (HPD, open)
C
04/17/2014
Violation issued (HPD, open)
B
04/17/2014
Violation issued (HPD, open)
B
04/17/2014
Violation issued (HPD, open)
B
01/29/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2013
Violation issued (ECB, open)
Construction
11/04/2013
Violation issued (ECB, open)
Construction
11/04/2013
Violation issued (ECB, open)
Construction
11/04/2013
Violation issued (ECB, open)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCJ Heating & Mechanical09/02/2021
DOB NOWPlumbingSigned-offCJ Heating & Mechanical04/26/2021
BISOTISSUEDArvin Construction12/07/2020
BISPLISSUEDJoe Truce Plumbing09/27/2001
BISEQISSUEDGrafton Construction09/17/2001
1 project · most recent 02/01/2022
Gas Water/Sanitary
FiledStatusContractorScope
02/01/2022Signed-offJL PlumbingGas, Water/Sanitary
2 projects · most recent 03/04/2020
General Wiring
FiledStatusContractorScope
03/04/2020Permit IssuedAtn ElectricGeneral Wiring
01/02/2019Permit IssuedIlluminations Unlmtd Electric2 meters, 2 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/18/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/04/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/25/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
01/25/2022Energy Code Compliance InspectionsHANSA PERSAUDprogress
08/19/2020Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
08/19/2020Energy Code Compliance InspectionsHANSA PERSAUDprogress
08/19/2020Fire-Resistance Rated ConstructionHANSA PERSAUDprogress
08/19/2020Electrical energy consumptionHANSA PERSAUDenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/14/2026Q00387729-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/28/2026Q00387729-S1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
06/03/2022440630186Open ↗
02/09/2022440630186Open ↗
06/18/2021401302620Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
02/04/2021440630186Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00387729-S1Open ↗
08/23/2026Q00387729-I1Open ↗
08/23/2026Q00387729-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/04/2021440630186Open ↗
02/04/2021440630186Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00387729-I1Open ↗
08/28/2026Q00387729-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00387729-S1Open ↗
08/23/2026Q00387729-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/25/2020440630186Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/25/2020440630186Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/04/2021440630186Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/30/2020440630186Open ↗
▸Inspections & Test Reports1
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/01/2022440630186Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/30/2020440630186Open ↗
09/25/2020440630186Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
06/24/2022440630186Open ↗
04/22/2022440630186Open ↗
02/25/2022440630186Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/25/2020440630186Open ↗