← Back
Two stories - detached, small or mid-size
115-12 159 STREET
QUEENS · BIN 4264580
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,216 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: 115 159 STREET LLC · 4,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Floor 24p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLACKSTONE REAL GROUP1404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2026$1.2M—115 159 STREET LLC → Private party$975/sf building
01/21/2025$251K—Private party → 115 159 STREET LLC$206/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN512/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor204/09/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616512/29/2025
Building Lifecycle
All (50)Filed (5)Permit Issued (3)Signed Off (3)Inspection (9)Special Inspection (30)
03/18/2026
Signed off — Alteration CO
Q01195224-I1
03/10/2026
Signed off — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app #Q1195224-I1
Q01244243-I1
01/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/13/2026
Signed off — Alteration
Installation of new temporary construction fence file in conjunction with ALT I app#Q01195224-I1
Q01216063-I1
12/29/2025
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app #Q1195224-I1
Q01244243-P1
12/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
12/29/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/29/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/29/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
12/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
12/25/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
12/25/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/25/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
12/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
12/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/19/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/19/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/19/2025
Special inspection requirement — Metering
FAHAD FATEH
12/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/19/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/19/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
12/19/2025
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
12/19/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
12/19/2025
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
12/19/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/19/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/18/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/10/2025
Filed — Alteration CO
Q01195224-P1
11/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2025
Permit issued — Plumbing
Q01244243-I1-PL
06/24/2025
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app #Q1195224-I1
Q01244243-I1
04/30/2025
Permit issued — Construction Fence
Q01216063-I1-FN
04/30/2025
Permit issued — Foundation
Q01195224-I1-GC-CX
04/28/2025
Filed — Alteration
Installation of new temporary construction fence file in conjunction with ALT I app#Q01195224-I1
Q01216063-I1
03/24/2025
Filed — Alteration CO
Q01195224-I1
07/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING06/26/2025
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP04/30/2025
DOB NOWFoundationPermit IssuedYAFE MEOD CORP04/30/2025
1 project · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/18/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
12/29/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/29/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
12/29/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/29/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
12/29/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
12/29/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/29/2025Maintenance informationFAHAD FATEHenergy_progress
12/29/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/25/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
12/25/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
12/25/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
12/25/2025Maintenance informationFAHAD FATEHenergy_progress
12/25/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/25/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/25/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/19/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
12/19/2025Fenestration areasFAHAD FATEHenergy_progress
12/19/2025MeteringFAHAD FATEHenergy_progress
12/19/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/19/2025Interior lighting powerFAHAD FATEHenergy_progress
12/19/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
12/19/2025Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
12/19/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
12/19/2025Subgrade InspectionsFAHAD FATEHspecial
Latest 25 of 38.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01216063-I1Request digital key ↗
08/19/2026Q01244243-I1Request digital key ↗
08/19/2026Q01244243-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01195224-P1Open ↗
08/13/2026Q01195224-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01195224-I1Open ↗
08/13/2026Q01195224-P1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026Q01244243-P1Open ↗
08/31/2026Q01244243-P1Open ↗
08/29/2026Q01244243-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01216063-I1Open ↗
08/18/2026Q01195224-P1Open ↗
08/18/2026Q01195224-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q01244243-P1Open ↗
08/29/2026Q01244243-I1Open ↗
08/27/2026Q01195224-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/18/2026Q01195224-P1Open ↗
08/18/2026Q01195224-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026Q01195224-P1Open ↗
08/18/2026Q01195224-I1Open ↗
08/13/2026Q01244243-P1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01195224-P1Open ↗
08/13/2026Q01195224-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01195224-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01195224-I1Open ↗
08/13/2026Q01195224-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01195224-P1Open ↗
08/13/2026Q01195224-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01195224-P1Open ↗
08/13/2026Q01195224-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/18/2026Q01195224-P1Open ↗
08/18/2026Q01195224-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01195224-I1Open ↗