← Back
Two stories - detached, small or mid-size
115-50 222 STREET
QUEENS · BIN 4243339
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,250 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 1 filing · 12 docs
Floor 1Under Construction1p · 1 filing · 12 docs
CellarUnder Construction1p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES105/05/2026
Building Lifecycle
All (30)Filed (1)Permit Issued (1)Objection (6)Special Inspection (22)
09/30/2026
Permit issued — Structural
Q01386777-I1-GC-CX
06/15/2026
Objection raised — Inspections
06/15/2026
Objection raised — Cost
06/15/2026
Objection raised — Admin
06/15/2026
Objection raised — Structural
06/15/2026
Objection raised — Admin
06/15/2026
Objection raised — Scope
05/05/2026
Filed — Alteration CO
Q01386777-I1
04/14/2026
Special inspection requirement — Concrete - Cast-In-Place
04/14/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/14/2026
Special inspection requirement — Masonry
04/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
04/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/14/2026
Special inspection requirement — Structural Wood Frame
04/14/2026
Special inspection requirement — Final
04/14/2026
Special inspection requirement — Footing and Foundation
04/14/2026
Special inspection requirement — Maintenance information
04/14/2026
Special inspection requirement — Insulation placement and R values
04/14/2026
Special inspection requirement — Air barrier — testing
04/14/2026
Special inspection requirement — Fenestration air leakage
04/14/2026
Special inspection requirement — Metering
04/14/2026
Special inspection requirement — Air barrier - visual inspection
04/14/2026
Special inspection requirement — Fenestration areas
04/14/2026
Special inspection requirement — Permanent certificate
04/14/2026
Special inspection requirement — Interior lighting power
04/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/14/2026
Special inspection requirement — Electric vehicle service equipment requirements
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedPRECISION HOME DEV INC09/30/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/14/2026Concrete - Cast-In-Place—special
04/14/2026Excavations - Sheeting, Shoring, and Bracing—special
04/14/2026Fire-Resistant Penetrations and Joints—special
04/14/2026Masonry—special
04/14/2026Subsurface Investigations (Borings/Test Pits)—special
04/14/2026Structural Stability – Alterations of existing buildings—special
04/14/2026Energy Code Compliance Inspections—progress
04/14/2026Fire-Resistance Rated Construction—progress
04/14/2026Structural Wood Frame—progress
04/14/2026Final—progress
04/14/2026Footing and Foundation—progress
04/14/2026Maintenance information—energy_progress
04/14/2026Insulation placement and R values—energy_progress
04/14/2026Air barrier — testing —energy_progress
04/14/2026Fenestration air leakage—energy_progress
04/14/2026Metering—energy_progress
04/14/2026Air barrier - visual inspection—energy_progress
04/14/2026Fenestration areas—energy_progress
04/14/2026Permanent certificate—energy_progress
04/14/2026Interior lighting power—energy_progress
04/14/2026Fenestration and door U-factor and product ratings—energy_progress
04/14/2026Electric vehicle service equipment requirements—energy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026Q01386777-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01386777-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q01386777-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026Q01386777-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01386777-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026Q01386777-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026Q01386777-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/15/2026Q01386777-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q01386777-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026Q01386777-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01386777-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026Q01386777-I1Open ↗