← Back
One story - permanent living quarter
115-51 208 STREET
QUEENS · BIN 4238009
💬 Discuss this project
1940Year Built
1Stories
A2Building Class
R3AZoning
900 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: 143 PROPERTY BUILDERS LLC · 4,000 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 25p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/31/2025$605K—Private party → 143 PROPERTY BUILDERS LLC$672/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D&E BUILD EVERGREEN INC.607/22/2026
PETER CHO ARCHITECTS, PLLC108/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor609/13/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342507/22/2026
TRIANGLE INSPECTION & TES7495108/14/2025
Building Lifecycle
All (71)Filed (7)Permit Issued (5)Signed Off (1)Inspection (4)Objection (24)Special Inspection (30)
09/16/2026
Signed off — Alteration CO
Curb cut application filed in conjunction with ALT-CO App. #Q01253103-I1. Propose 10.00' curb cut with 1' 6" splay (Each side) on 208 STREET 230.00' from 116 AVENUE.
Q01253103-S3
09/11/2026
Permit issued — Mechanical Systems
Q01253103-S3-MS
09/11/2026
Permit issued — Curb Cut
Q01253103-S4-CC
07/24/2026
Objection resolved — Resolved
07/23/2026
Objection raised — Scope
07/22/2026
Filed — Alteration CO
Curb cut application filed in conjunction with ALT-CO App. #Q01253103-I1. Propose 10.00' curb cut with 1' 6" splay (Each side) on 208 STREET 230.00' from 116 AVENUE.
Q01253103-P2
06/25/2026
Filed — Alteration CO
Curb cut application filed in conjunction with ALT-CO App. #Q01253103-I1. Propose 10.00' curb cut with 1' 6" splay (Each side) on 208 STREET 230.00' from 116 AVENUE.
Q01253103-P1
06/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
06/03/2026
Special inspection requirement — Mechanical Systems
Danny Chen
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
06/03/2026
Special inspection requirement — Final
PETER CHO
06/03/2026
Special inspection requirement — Ventilation and air distribution system
Danny Chen
06/03/2026
Special inspection requirement — Maintenance information
Danny Chen
06/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
Danny Chen
06/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
06/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
03/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/27/2026
Permit issued — Plumbing
Q01253103-S2-PL
12/26/2025
Permit issued — Structural
Q01253103-I1-GC-CX
12/21/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Scope
11/19/2025
Filed — Alteration CO
Curb cut application filed in conjunction with ALT-CO App. #Q01253103-I1. Propose 10.00' curb cut with 1' 6" splay (Each side) on 208 STREET 230.00' from 116 AVENUE.
Q01253103-S4
11/19/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
09/30/2025
Special inspection requirement — Maintenance information
Danny Chen
09/15/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Admin
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Energy
09/09/2025
Objection raised — Fire_Protection
09/09/2025
Objection raised — Inspections
09/09/2025
Objection raised — Plumbing
09/09/2025
Objection raised — Admin
09/09/2025
Objection raised — Plumbing
08/28/2025
Permit issued — Construction Fence
Q01253103-S1-FN
08/14/2025
Filed — Alteration CO
Curb cut application filed in conjunction with ALT-CO App. #Q01253103-I1. Propose 10.00' curb cut with 1' 6" splay (Each side) on 208 STREET 230.00' from 116 AVENUE.
Q01253103-S3
08/14/2025
Filed — Alteration CO
Curb cut application filed in conjunction with ALT-CO App. #Q01253103-I1. Propose 10.00' curb cut with 1' 6" splay (Each side) on 208 STREET 230.00' from 116 AVENUE.
Q01253103-S2
08/14/2025
Filed — Alteration CO
Curb cut application filed in conjunction with ALT-CO App. #Q01253103-I1. Propose 10.00' curb cut with 1' 6" splay (Each side) on 208 STREET 230.00' from 116 AVENUE.
Q01253103-I1
08/14/2025
Filed — Alteration CO
Curb cut application filed in conjunction with ALT-CO App. #Q01253103-I1. Propose 10.00' curb cut with 1' 6" splay (Each side) on 208 STREET 230.00' from 116 AVENUE.
Q01253103-S1
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
08/13/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Danny Chen
08/13/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
08/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
08/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
08/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
08/13/2025
Special inspection requirement — Maintenance information
Danny Chen
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPRECISION HOME DEV INC09/11/2026
DOB NOWCurb CutSigned-offPRECISION HOME DEV INC09/11/2026
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/27/2026
DOB NOWStructuralPermit IssuedPRECISION HOME DEV INC12/26/2025
DOB NOWConstruction FencePermit IssuedPRECISION HOME DEV INC08/28/2025
1 job · most recent 07/22/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/22/2026Signed-offPRECISION HOME DEV INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman GLXS3BN3610AA 36,000 BTU · Condensing Unit ×1
GLXS3BN6010AA 60,000 BTU · Condensing Unit ×1
Heating
Goodman GM9S800804BN 64,000 BTU · Furnace ×1
GR9S921004CN 100,000 BTU · Furnace ×1
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 job · most recent 07/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/22/2026Signed-offINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
1 job · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 job · most recent 07/22/2026
Fence
FiledStatusContractorScope
07/22/2026Signed-offPRECISION HOME DEV INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/04/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/04/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/03/2026HVAC-R and service water piping design and insulationDanny Chenenergy_progress
06/03/2026Fire-Resistant Penetrations and JointsDanny Chenspecial
06/03/2026Mechanical SystemsDanny Chenspecial
06/03/2026Energy Code Compliance InspectionsDanny Chenprogress
06/03/2026FinalPETER CHOprogress
06/03/2026Ventilation and air distribution systemDanny Chenenergy_progress
06/03/2026Maintenance informationDanny Chenenergy_progress
06/03/2026Duct leakage testing, insulation and designDanny Chenenergy_progress
06/03/2026HVAC-R and service water heating system controlsDanny Chenenergy_progress
06/03/2026HVAC-R and service water heating equipmentDanny Chenenergy_progress
09/30/2025Maintenance informationDanny Chenenergy_progress
08/13/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
08/13/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDanny Chenspecial
08/13/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/13/2025Energy Code Compliance InspectionsDanny Chenprogress
08/13/2025HVAC-R and service water heating system controlsDanny Chenenergy_progress
08/13/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
08/13/2025HVAC-R and service water heating equipmentDanny Chenenergy_progress
08/13/2025Maintenance informationDanny Chenenergy_progress
08/01/2025Excavations - Sheeting, Shoring, and BracingDanny Chenspecial
07/09/2025Structural Stability – Alterations of existing buildingsDanny Chenspecial
07/09/2025Air barrier - visual inspectionDanny Chenenergy_progress
07/09/2025Insulation placement and R valuesDanny Chenenergy_progress
07/09/2025Interior lighting powerDanny Chenenergy_progress
07/09/2025Concrete - Cast-In-PlaceDanny Chenspecial
Latest 25 of 43.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/18/2026Q01253103-S2Request digital key ↗
08/18/2026Q01253103-S1Request digital key ↗
08/18/2026Q01253103-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026Q01253103-I1Open ↗
08/14/2026Q01253103-P1Open ↗
08/13/2026Q01253103-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01253103-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026Q01253103-S2Open ↗
08/31/2026Q01253103-S2Open ↗
08/23/2026Q01253103-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026Q01253103-S3Open ↗
08/18/2026Q01253103-P2Open ↗
08/18/2026Q01253103-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q01253103-S2Open ↗
08/31/2026Q01253103-S2Open ↗
08/23/2026Q01253103-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/14/2026Q01253103-P1Open ↗
08/13/2026Q01253103-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026Q01253103-P2Open ↗
08/14/2026Q01253103-P1Open ↗
08/13/2026Q01253103-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/14/2026Q01253103-P1Open ↗
08/13/2026Q01253103-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01253103-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/14/2026Q01253103-P1Open ↗
08/13/2026Q01253103-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026Q01253103-P1Open ↗
08/13/2026Q01253103-I1Open ↗
▸DOB NOWPlot Diagram2
08/14/2026Q01253103-P1Open ↗
08/13/2026Q01253103-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/14/2026Q01253103-P1Open ↗
08/13/2026Q01253103-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01253103-I1Open ↗