← Back
BuildNYC
Two family converted from one family
115-72 NEWBURG STREET
QUEENS · St. Albans · BIN 4221278
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3AZoning
2,052 sfGross Floor Area
2Units
Two family converted from one family · 3,460 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 2 filings · 20 docs
Floor 28p · 2 filings · 20 docs
Floor 1Unit 1D29p · 3 filings · 20 docs
Cellar9p · 2 filings · 20 docs
Site & exteriorTioga Drive temporary construction fence installation9p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2024$1.2M—SHOREVIEW CAPITAL LLC → Private party$599/sf building
06/09/2022$685K—Private party → SHOREVIEW CAPITAL LLC$334/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pirooz Engineering501/02/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Harry's DesignGeneral Contractor307/08/2026
Harry's DesignScaffold107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pirooz Engineering7177301/02/2024
Triangle Inspection & Tes7495101/09/2023
Building Lifecycle
05/16/2024
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
Q08035241-I1-GC-CX
03/19/2024
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING IN CONJUNCTION WITH ALTERATION-CO APPLICATION # Q08035241-I1
Q08038468-I1
03/18/2024
Signed off — Alteration
Q08035284-I1
03/11/2024
Signed off — Alteration
Q08035281-I1
03/08/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offHarry's Design09/20/2023
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing06/22/2023
DOB NOWStructuralPermit IssuedHarry's Design05/16/2023
DOB NOWConstruction FenceSigned-offHarry's Design05/12/2023
1 project · most recent 05/20/2023
FiledStatusContractorScope
05/20/2023CompleteAyyub Electric—
1 project · most recent 01/02/2024
Wood
FiledStatusContractorScope
01/02/2024Permit IssuedHarry's DesignWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/08/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
02/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
07/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/07/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
01/22/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
01/22/2024Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
01/22/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
01/22/2024Construction Operations Influencing Adjacent StructuresPIROOZ SOLTANIZADEHspecial
01/22/2024Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
01/22/2024Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
01/22/2024Footing and FoundationPIROOZ SOLTANIZADEHprogress
01/22/2024Structural Wood FramePIROOZ SOLTANIZADEHprogress
01/22/2024Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
01/22/2024FinalNAVEEN KUMARprogress
01/22/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
01/22/2024PreliminaryPIROOZ SOLTANIZADEHprogress
01/22/2024Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
01/22/2024Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
01/22/2024HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
01/22/2024HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
01/22/2024Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
01/22/2024HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Lighting in dwelling unitsPIROOZ SOLTANIZADEHenergy_progress
01/08/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
01/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
Latest 25 of 31.
49 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account