← Back
Two family converted from one family
115-72 NEWBURG STREET
QUEENS · St. Albans · BIN 4221278
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3AZoning
2,052 sfGross Floor Area
2Units
Two family converted from one family · 3,460 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Roof1p · 1 filing · 6 docs
Floor 210p · 2 filings · 20 docs
Floor 111p · 3 filings · 20 docs
Cellar11p · 2 filings · 20 docs
Site & exterior11p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2024$1.2M—— → —$599/sf building
06/09/2022$685K—— → —$334/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.501/02/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HARRY'S DESIGN INCGeneral Contractor407/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177301/02/2024
TRIANGLE INSPECTION & TES7495101/09/2023
Building Lifecycle
All (52)Filed (5)Permit Issued (4)Signed Off (3)Inspection (10)Special Inspection (30)
03/19/2024
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING IN CONJUNCTION WITH ALTERATION-CO APPLICATION # Q08035241-I1
Q08038468-I1
03/18/2024
Signed off — Alteration
Q08035284-I1
03/11/2024
Signed off — Alteration
Q08035281-I1
03/08/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/22/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Final
NAVEEN KUMAR
01/22/2024
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
01/22/2024
Special inspection requirement — Lighting in dwelling units
PIROOZ SOLTANIZADEH
01/02/2024
Filed — Alteration CO
EXISTING 2-STORY WITH ATTIC FRAME AND BRICK BUILDING WITH CELLAR. PROPOSED 2 STORY, TWO-FAMILY FRAME DWELLING WITH HORIZONTAL ENLARGEMENT. CHANGE MEETS AND BOUNDS AND TO OBTAIN NEW CERTIFICATE OF OCCUPANCY
Q08035241-P1
11/21/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2023
Permit issued — Curb Cut
Q08035281-I1-CC
07/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/22/2023
Permit issued — Plumbing
Q08038468-I1-PL
05/16/2023
Permit issued — Structural
Q08035241-I1-GC-CX
05/12/2023
Permit issued — Construction Fence
Q08035284-I1-FN
01/09/2023
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING IN CONJUNCTION WITH ALTERATION-CO APPLICATION # Q08035241-I1
Q08038468-I1
01/09/2023
Filed — Alteration
Q08035284-I1
01/09/2023
Filed — Alteration
Q08035281-I1
01/09/2023
Filed — Alteration CO
EXISTING 2-STORY WITH ATTIC FRAME AND BRICK BUILDING WITH CELLAR. PROPOSED 2 STORY, TWO-FAMILY FRAME DWELLING WITH HORIZONTAL ENLARGEMENT. CHANGE MEETS AND BOUNDS AND TO OBTAIN NEW CERTIFICATE OF OCCUPANCY
Q08035241-I1
01/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
01/08/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
01/08/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
01/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
01/08/2023
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
01/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
01/08/2023
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offHARRY'S DESIGN INC09/20/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/22/2023
DOB NOWStructuralPermit IssuedHARRY'S DESIGN INC05/16/2023
DOB NOWConstruction FenceSigned-offHARRY'S DESIGN INC05/12/2023
1 project · most recent 05/20/2023
FiledStatusContractorScope
05/20/2023CompleteAYYUB ELECTRIC CORP3 meters, 3 new_meters
1 project · most recent 01/02/2024
Wood
FiledStatusContractorScope
01/02/2024Permit IssuedHARRY'S DESIGN INCWood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/08/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
02/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
11/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/07/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
01/22/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
01/22/2024Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
01/22/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
01/22/2024Construction Operations Influencing Adjacent StructuresPIROOZ SOLTANIZADEHspecial
01/22/2024Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
01/22/2024Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
01/22/2024Footing and FoundationPIROOZ SOLTANIZADEHprogress
01/22/2024Structural Wood FramePIROOZ SOLTANIZADEHprogress
01/22/2024Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
01/22/2024FinalNAVEEN KUMARprogress
01/22/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
01/22/2024PreliminaryPIROOZ SOLTANIZADEHprogress
01/22/2024Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
01/22/2024Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
01/22/2024HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
01/22/2024HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
01/22/2024Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
01/22/2024HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
01/22/2024Lighting in dwelling unitsPIROOZ SOLTANIZADEHenergy_progress
01/08/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
01/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
Latest 25 of 31.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q08035281-I1Request digital key ↗
08/25/2026Q08035284-I1Request digital key ↗
08/25/2026Q08038468-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
01/27/2023421808529Open ↗
01/05/2023421808529Open ↗
01/04/2023421808529Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q08035241-I1Open ↗
08/13/2026Q08035241-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q08035241-I1Open ↗
08/13/2026Q08035241-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/06/2023421808529Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
01/27/2023421808529Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/06/2023421808529Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/06/2023421808529Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08035241-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08035281-I1Open ↗
08/23/2026Q08035241-I1Open ↗
08/23/2026Q08035241-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026Q08035241-I1Open ↗
08/29/2026Q08035241-I1Open ↗
08/29/2026Q08035241-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026Q08035241-I1Open ↗
08/28/2026Q08038468-I1Open ↗
08/28/2026Q08038468-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q08035241-I1Open ↗
08/13/2026Q08035241-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026Q08035241-P1Open ↗
08/23/2026Q08035241-I1Open ↗
08/13/2026Q08038468-I1Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
01/27/2023421808529Open ↗
▸BISEFILING COVER SHEET1
01/27/2023421808529Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial2
08/13/2026Q08035241-P1Open ↗
08/13/2026Q08035241-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q08035241-P1Open ↗
08/13/2026Q08035241-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q08035241-P1Open ↗
08/13/2026Q08035241-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q08035241-I1Open ↗
08/23/2026Q08035241-P1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
01/06/2023421808529Open ↗
▸BISPLOT DIAGRAM1
01/06/2023421808529Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08035241-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08035241-I1Open ↗